Title: Effective Training: Strategies, Systems and Practices, 3rd Edition
1Effective Training Strategies, Systems and
Practices, 3rd Edition
- Chapter Eight
- Development Implementation
- P. Nick Blanchard and James W. Thacker
2Development Phase
3Different Seating Arrangements for Training
Part 1 of 6
4Instructional Strategy
- Content Learning Points
- Materials and Equipment
- Trainees Manual
- Trainers Manual
- Facilities
- Training Room
5Seating Arrangements
- What arrangement is best for
- Seminar
- Small group exercises
- PPT/lecture
- What is the seating arrangement in this classroom
best suited for
6Different Seating Arrangements for Training
Part 2 of 6
7Different Seating Arrangements for Training
Part 3 of 6
8Different Seating Arrangements for Training
Part 4 of 6
9Different Seating Arrangements for Training
Part 5 of 6
10Different Seating Arrangements for Training
Part 6 of 6
11Knowledge, Skills, and Attitudes Required of an
Effective Trainer Part 1 of 2
Knowledge   Subject matter   Organization   Adu
lt learning process   Instructional methods
Skills Interpersonal communication
skills Verbal skills      Active
listening      Questioning      Providing
feedback Platform skills Organization skills
12Knowledge, Skills, and Attitudes Required of an
Effective Trainer Part 2 of 2
- Attitudes
- Commitment to the organization
- Commitment to helping others
- High level of self efficacy
-
13Components of Instructional Strategy Part 1 of 3
Program Development Plan Name of Program Pipe
fitting I Target Population Apprentices who
have successfully passed the gas fitters exam
Overall Training Objective Trainees will be
able to examine a work project and with
appropriate tools measure, cut, thread, and
install the piping according to standards
outlined in the gas code.
14Components of Instructional Strategy Part 2 of 3
Learning Objective Learning Points Methods
Material and AV
1. Using a tape 1. Take into account Lecture
and Trainee manual  measure, deter-   the
extra length   simulation Overhead   mine the
length   necessary Assortment of and
number of   due to threading 1-inch and
3/4-  pipes necessary 2. Take into account
inch fittings, to connect the length is
reduced by   elbows, street   furnace to the
gas different fittings,  elbows, and Â
meter in a manner   e.g., street elbow, Â
unions that meets the gas  union, elbow,
etc.  Mock meter   code 3. How to
construct and furnace    appropriate drop
   setup for furnace Tape measure,  Â
  note pads  Â
15Components of Instructional Strategy Part 3 of 3
Learning Objective Learning Points Method Material
and AV
2. Use threading 1. Length of thread Lecture
and Trainee manual  machine to cut  Â
required     simulation VCR and TV  and thread
length 2. Importance of Threading tape  of
pipe required   cutting and Threading machine
  reaming, mea- Steel pipe   suring, and
use Oil   of threading Tape measure  Â
machine oil
Facility and configuration Trainer Measures to
assist transfer Method of evaluation
16Implementation Phase