A Savings for the Nation! Project Completion Dates (Pre-WRRDA, New Construction) - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

A Savings for the Nation! Project Completion Dates (Pre-WRRDA, New Construction)

Description:

A Savings for the Nation! Project Completion Dates (Pre-WRRDA, New Construction) Olmsted L/D Construction (2020) Lower Mon 2,3 & 4 Replacement, phase 1 (2027) NOW 2023 – PowerPoint PPT presentation

Number of Views:116
Avg rating:3.0/5.0
Slides: 3
Provided by: water50
Category:

less

Transcript and Presenter's Notes

Title: A Savings for the Nation! Project Completion Dates (Pre-WRRDA, New Construction)


1
A Savings for the Nation!Project Completion
Dates (Pre-WRRDA, New Construction)
  • Olmsted L/D Construction (2020)
  • Lower Mon 2,3 4 Replacement, phase 1 (2027) NOW
    2023
  • Kentucky Lock Addition (2041) NOW 2023
  • Chickamauga Replacement Lock (2051) NOW 2024
  • L/D 25 Upper MS 1200 Lock Addition (2064) NOW
    2032
  • High Island to Brazos River, TX (2053) NOW 2016
  • Lagrange 1200 Lock Addition (2070) NOW 2028
  • L/D 22 Upper MS 1200 Lock Addition (2083) NOW
    2035
  • L/D 24 Upper MS 1200 Lock Addition (2090) NOW
    2036

2
Project Completion Dates (Pre-WRRDA, Major Rehab)
  • L/D 25 Upper MS Dam (2053) NOW 2030
  • Lagrange (2064) NOW 2018
  • Lower Monumental (2065)
  • ILL WW Thomas OBrien L/D (2065) NOW 2023
  • Greenup Dam Rehab PED Constr. (2079) NOW 2031
  • JT Myers Dam (2081)
  • Meldahl Dam (2079)
  • Montgomery (2084)
  • Mel Price Upper MS (2086)
  • No. 2 Lock AR Lock Wall/Bank Slope Rehab (2085)
  • Willow Island Dam Rehab PED Constr. (2089)
  • Marmet Dam (2090)