Title: N
1Agencys activities concerningnational safety
rules
- Natalja Skacenko
- Safety Unit
- Safety Regulation Sector
2Registration of the notifiednational safety
rules
3Validation of notifications
- 1200 rules are notified
- Clarified and renewed notifications of existing
rules received in 2008 (less than 1000 rules,
i.e. 5 times less than in 2005) - Rules of Bulgaria and Romania
- New rules of other countries
- So far 618 rules are uploaded to the PDB.
- Some of these rules have been uploaded by the
MS/NSAs as part of the actual notification.
4Use of rule declaration form - April 2009
MS own format MS own format Excel version of RDF Excel version of RDF Online RDF Online RDF
Paper Electronic Paper Electronic Online RDF Online RDF
AT - 23 NO - 9 SI - 54 EE - 20 SK - 20 EL - 4 BG - 178 CZ - 58 DE - 58 FI - 80 FR - 18 HU - 12 LT - 120 LU - 83 LV - 29 PT - 42 RO - 44 SE - 60 BE - 84 BG - 1 CT - 16 DK - 5 EE - 20 ES - 23 FR - 18 IE - 46 IT - 107 LU - 79 NL - 6 NO - 23 PL - 20 SI - 38 UK - 85
Total 86 Total 40 Total 4 Total 782 Total 486 Total 486
5Number of the rules in the PDB - 618
Public Database Public Database Public Database Public Database
Temporary space Temporary space Registered Registered
Belgium Bulgaria Channel Tunnel Denmark France Ireland Italy Luxembourg Norway Poland Slovenia SpainSweden United Kingdom 11 1 16 5 19 46 107 79 8 20 38 23 6 85 Belgium Estonia Netherlands Norway Sweden 73 20 6 15 40
Total 464 Total 464 Total 154 Total 154
6Types of rules in some countries
Country Type 1 2 3 4 5 6 7
Belgium 1 3 8 54 8 7 3
Denmark 0 2 0 1 0 2 1
Estonia 1 2 3 4 2 6 2
France 2 2 4 3 2 2 1
Ireland - - - - - - -
Italy - - - - - - -
Netherlands 1 2 2 2 0 2 3
Norway 1 2 1 3 2 4 3
Sweden 0 5 20 7 3 4 8
7Legal changes for type 3 NSR
- Directive 2008/57/EC
- (the new Interoperability Directive)
- Directive 2008/110/EC amending the Railway Safety
Directive - ?
- Type 3 rules are now included as national
technical rules to be notified under Article 17
(3) of the Interoperability Directive. - ?
- Short note and updates of the Guideline for NSR
notification
8Changes in the notification procedure
- The Commission is introducing a new electronic
system for notifying NSR and NTR - RISD Railway Interoperability and Safety
Database - Planned use as from September 2009
- Same rule declaration form will be used
9Existing solutions (source DG TREN)
- Member States notify their safety rules online
- Through the ERA web application.
- Notification of technical rules
- Via email exchanges letters between the Member
States and the Commission.
10Existing problems (source DG TREN)
- Huge amount of email paper files
- Inefficiency in management of required follow-up
- No data content harmonisation increase the work
effort for he Commission in order to merge the
information. - No transparency
- Difficulties in storing information
- Two separate workflows (Commission ERA)
11Proposed solution (source DG TREN)
- The RISD web applicationRailway
Interoperability and Safety Database - PURPOSE
- Unique entry point for all notifications (safety
and technical rules) - Automatisation of notification process
- Harmonization of content
12Proposed solution (source DG TREN)
- Help the member States in their notification
tasks (pre-filled forms, features to save ongoing
notifications, etc) - Assure persistence of information
- Facilitate its retrieval
- Provide automatic transparency notifications
automatically available to Member States and
public
13Preparations for using RISD
- The Commission will
- Create steering group with volunteered MS and
ERA - Organise workshop on the use of the database
- Update Guideline for NSR notification (procedure
and use of rule declaration form) - ERA will
- Download NSR to RISD no need to re-notify NSR!
- Solution for NTR will be discussed with RISC
14Evaluation of how national safety rules are
published and made available in the Member States
15Phase I
- Scope Notifications that were accepted (NO, NL),
clarified (BE, EE, FR, SE), clarified but not yet
notified (DK, IE, IT) and new (NO, SE, DK) - 67 interview partners contributed to the external
study - Preliminary conclusions and examples of good
practice have been discussed with MS/NSA - (Please consult details on ERA Extranet)
16Phase I examples of preliminary conclusions
- Transparent policy on consultation of
stakeholders list including RU, IM, and
manufacturers - preparation of rules
- formal consultation of draft rule
- Systematic review of NSR to take into account
- technological developments of RS
- operational practices,
- European legislation
- Develop NSA web sites as primary source with
search aids
17Phase I examples of good practice
- NSA web sites as primary source of NSR
- collections of relevant legislation (NO)
- handbooks of rules (SE)
- guidelines (IE)
- IM provides access to all operational rules (IT)
18Proposal for NSR task force
- Propose and exchange good practice
- policy and procedures for consultation of
stakeholders - regimes for monitoring and reviewing NSR
- guidelines on publication and accessibility of
NSR - New approaches to establishment of NSR
- Proposal on task force activities in 2010
19Current activities in Phase 2
- Scope Renewed notifications from AT, CZ, DE, EL,
ES, FI, HU, LT, LU, LV, PL, PT, SI, SK, UK and CT
and notifications from BG and RO. - Activities
- Validation of the notifications
- Registration of the rules in the database
- Examination of the rules how they are published
and made available
20Evaluation of the rules how they are published
and made available (1)
- A consortium, KEMA - CETREN, has interviewed
ministries, NSA, RU and IM in 17 MS and CT during
March-April 2009 - The consortium will deliver report end July 2009
with information from the interviews - As in phase I, the report will be sent to the
concerned NSR contact persons for validation
21Evaluation of the rules how they are published
and made available (2)
- The Agency will
- examine the notified rules using the findings in
the report from the consortium - prepare a combined report for phase 1 and 2
concerning the publication and availability of
the rules - deliver recommendations to the Commission for
publication of the rules in order to make the
relevant information more easily accessible - end
2009
22Other activities
23Other NSR-related activities
- The Agency assists the Commission
- First technical advice to the Commission was
issued on 3 April 2009 - The Agency evaluates national laws implementing
the Directive 2004/49/EC (mandate in July 2008) - The Agency shall issue technical opinion by
request of - The Commission on new national safety rules
- DERC or regulatory bodies on safety issues
24Thank you for your attention