Kein Folientitel - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Kein Folientitel

Description:

Title: Kein Folientitel Subject: Brijuni 26.-28.06.2003 Author: Davorin KOLIC Last modified by: user Created Date: 9/23/1999 11:56:45 AM Document presentation format – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 15
Provided by: Davo153
Category:

less

Transcript and Presenter's Notes

Title: Kein Folientitel


1
ITA Croatia
ITA SEE 2011, Scientific Symposium
Congress centre Lacroma, Dubrovnik
April, 7-9, 2011
TUNNELING ACTIVITIES IN TURKEY
TÜLIN SOLAK Temelsu International Engineering
Services Inc.
2
TUNNELING ACTIVITIES IN VARYING FIELDS IN TURKEY
3
HEPP PROJECTS
4
BOLU TUNNEL ON ANKARA-ISTANBUL MOTORWAY
FAULT RUPTURE 1999
FAULT RUPTURE 1944
HIGHWAY PROJECTS
5
  • GEBZE-ORHANGAZI-IZMIR MOTORWAY (INCLUDING IZMIT
    BAY CROSSING)
  • Total lenght 421 km
  • 2 tunnels in total lenght of 5150 m
  • suspended bridge L 3 km and span1700m
  • ( second longest bridge of this typology in the
    world)
  • contract type BOT
  • construction period 7 years
  • operation period 22 years and 4 month
  • estimated cost 8-11 billion US

Samanli Tunnel L3.4 km
Current Bursa Ring Road
Belkahve Tunnel L1.75 km
HIGHWAY PROJECTS
6
SPEED RAILWAY PROJECTS
Speed Railway Lines
Ankara-Istanbul Ankara-Konya Ankara-Sivas Ankara-I
zmir Bursa-Osmaneli Ankara-Kayseri Halkali-Kapikul
e
  • Second stage in Ankara-Istanbul Line
  • 40 tunnels have been excavated with NATM
  • Longest tunnel at Ankara-Istanbul line 8 km will
    be excavated with TBM

-----Line under operation ---- Line under
construction ---- Line at planing stage
RAILWAY PROJECTS
7
SILK RAILWAY PROJECT KARS-TBILISI-BAKU RAILWAY
PROJECT
Rehabilitation in Georgia
Construction in Georgia 29 km
Tunnel to be constructed in Georgia 2070 m
Construction in Turkey 76 km
Tunnels to be constructed in Turkey 6190
Present line
RAILWAY PROJECTS
8
BOSPHORUS TUBE TUNNEL CROSSING-MARMARAY
Worlds deepest immersed tunnel H60 m L1.4
km Bored tunnels with TBM L9.8 km Cut and cover
structures L2.4 km 3 underground stations 75000
people/hour/direction Total lenght of the line
76 km Planned date for operation October 2013
Ayrilikçesme
Kazliçesme
Ayrilikçesme
RAILWAY PROJECTS
9
SIRKECI STATION SHAFT
ÜSKÜDAR STATION AREA
PORTAL STARTING POINT OF TBM
Ayrilikçesme
RAILWAY PROJECTS
10
IMMERSING BARGE
SETTLING THE ELEMENTS
BACKFILL CROSSECTION
Ayrilikçesme
RAILWAY PROJECTS
11
ARCHEOLOGICAL EXCAVATIONS
RAILWAY PROJECTS
12
BOSPHORUS TUBE TUNNEL CROSSING
PAST EARTQUAKES
GROUND IMPROVEMENT AT THE TUNNEL BASE
SEISMIC JOINTS
RAILWAY PROJECTS
13
ISTANBUL STRAIT ROAD CROSSING
Marmaray Istanbul Strait Road Crossing
European side
Asian side
Marmara sea
  • 5.4 km bored tunnel (3.3 km undersea)
  • 1.8 km to Marmaray
  • 1.1 billion , BOT
  • TBM,NATM, Open cut
  • 6. largest TBM L160 m Dext12.4 m
  • advance 10 m/day 65 million
  • 61 m water 45 m rock
  • Construction time 4.5 year
  • Operation time 26 year

URBAN TRANSPORT PROJECTS
14
  • DUE TO SEVERAL REASONS, TOPOGRAPHICAL,
    ECONOMICAL, ENVIRONMENTAL ETC, TUNNELS ARE
    ESSENTIAL IN TURKEY.
  • TURKEY IS LOCATED AT AN EARTQUAKE ZONE AND
    TUNNELS SHOULD BE DESIGNED ACCORDINGLY.
  • IT MAY BE NECESSARY TO ESTABLISH JOINT VENTURES
    WITH EXPERIENCED COMPANIES FROM OTHER COUNTRIES
    FOR TECHNOLOGY TRANSFER
  • IMPORTANT PROJECTS ARE FINANCED WITH PPP MODEL
    (BOT, BO)

CONCLUSIONS
Write a Comment
User Comments (0)
About PowerShow.com