Transcript and Presenter's Notes

Title: Gemini


1
Geminis Innovation-Driven Process Reengineering
ApproachA Component of Market-Focused
Reengineering
Version 1.1
1993 Gemini Consulting, Inc. Proprietary and
confidential. Reproduction with express
permission only.
September 29, 93
2
Geminiís Market Focused Reengineering Offering
Includes Ten Key Elements
5 Integration (Work Architecture)

CONSTRUCT/Systems Design and Implementation
4 Market Focus
7 Process Reengineering
10 Reskilling Infra-structureRenewal
Process Visioning
Process Concep- tualization
Process Design
Implement- ation Planning
Implement- ation Execution
3 Strategic Goals Measurements
6 "Early Wins"
2 Technology IT Strategy
8 BenchmarkingService Offering
9 Activity-BasedManagement
1 Client Partnering Mobilization
3
Our Core Process Reengineering Methodology
Focuses Primarily on Three of these Elements
5 Integration (Work Architecture)

CONSTRUCT/Systems Design and Implementation
4 Market Focus
7 Process Reengineering
10 Reskilling Infra-structureRenewal
Process Visioning
Process Concep- tualization
Process Design
Implement- ation Planning
Implement- ation Execution
3 Strategic Goals Measurements
6 "Early Wins"
2 Technology IT Strategy
8 BenchmarkingService Offering
9 Activity-BasedManagement
1 Client Partnering Mobilization
4
Geminiís Client Partnering and Mobilization Model
Provides Insight into our Unique Approach in this
area
Systemic View
ï How ìBehaviorsî ï Model Change ï Gemini
Consultant as ìLeadî
ï Knowledge ï Behavioral Skills ï ìThoughtî
Processes
Gemini Consultant
ï Knowledge ï Behavioral Skills ï ìThoughtî
Processes ï Role Model for Change
Client As Consultant - Results Transfer
Client Participation
ï Client Ownership ï Peer Relationship ï Trust/Dis
closure
ï Client as Lead ï Decision-Making ï Client
Teaches/ Implements ï Client Based ï Training
Client Enablement
5
5. Integration
5. Integration
5.1 Understand
5.2 Frame
5.3 Prioritize
5.4 Manage
  • Purpose To focus on ensuring reengineering
    efforts, process improvement activities, business
    initiatives (such as TQM), and business
    objectives are integrated, consistency
    maintained, and a smooth transition occurs as
    the reengineered process(es) are implemented
  • Deliverables/Results An integrated,
    well-structured reengineering program aligned
    with business objectives and consistent with
    process improvement streams and business
    initiatives
  • Key Activities Form and on-board Integration
    Team
  • Understand major processes and change
    opportunities
  • Frame a high-level view of business activities
  • Prioritize process change opportunities
  • Create process change teams
  • Manage process change efforts
  • Note Many of the key integration activities may
    be completed during the AD efforts leading up to
    the project start
  • Key Tools/Diagnostics Benchmarking Service
    Offering Project Management
  • CONSTRUCT Decision Modeling
  • Value Chain Analysis Cost/Benefit Analysis
  • Benefits Tracking

SM
6
5. Integration - Client Partnering
Critical Success Factors
  • Gemini, top client, key executives and their
    direct reports all share a clear and common
    understanding of the goals, objectives, logic,
    methodologies and schedule of the reengineering
    project.
  • Formation of, and team building with, Executive
    Steering Committee (ESC) early in project
  • Effectively managed ESC and Core Team meetings
  • Team structure (roles, responsibilities, etc.)
    jointly (Gemini and client) defined and agreed
    upon
  • Frequent prepositioning/one-on-one coaching of
    ESC team members

Key Activities Requiring Partnering
  • Assist client in rationalizing existing
    improvement efforts
  • Help client understand reengineering process and
    assist in identifying and prioritizing
    opportunities for reengineering
  • Identify ESC members
  • Conduct Executive prepositioning meetings around
    project scope/deliverables, goals and objectives
  • Conduct joint team training (Gemini results
    delivery team plus key client work-withs)
  • Introduce ìpartneringî model (page 4) ñ Process
    consultation
  • Managing change and resistance ñ PS/TB
  • Conflict resolution ñ Trust formula
  • Effective meeting management
  • Begin to create overall organization leadership
    model
  • Begin to model and introduce effective change
    behaviors
  • Begin client expectations exchange. Emphasize
    clientís full, daily involvement
  • Assess organizational and corporate culture
  • Develop individual coaching plans for key
    executives and assign coaches/mentors from Gemini
    team
  • Determine appropriate industry content/process
    knowledge required
  • Develop processes to assess level of client
    ownership and buy-in
  • Help client understand the Gemini MFR process
  • Facilitate Executive Steering Committeeís
    selection of core management team to monitor
    project workstreams
  • Train core team in natural work team (NWT)
    methodologies

T 1/RxCxI Trust is inversely proportional to
the risk, and directly proportional to the level
of credibility and intimacy established
7
5. Integration - Client Partnering (cont.)
Key Insights
  • Add value quickly -- demonstrate content
    knowledge, offer insight into client operations,
    demonstrate value of process consultation
  • Focus on developing mutual respect and
    understanding at this stage. Be honest. Listen
    actively. Be candid, but supportive.
    Demonstrate that you care and understand. Value
    the client as a partner
  • Be relentless in your learning about the
    clientís
  • Business, politics, culture, personal aspirations
  • Introduce and model effective change management
    behaviors at every opportunity
  • Inspire confidence and credibility through
    behavior and performance
  • It is important to develop a mechanism to assess
    the level of client ownership and buy-in
  • Executive Steering Committee will probably be the
    most senior members of the client and may include
    representatives from first line managers and
    staff
  • Ideally the top client should be the team leader
    of the Executive Steering Committee. If not, a
    direct report can be the leader and the top
    client can be the Executive Champion
  • The joint team training is best conducted
    off-site with informal team building activities
    (dinners, golf, etc.) ideally during week one of
    the project
  • A highly credible and experienced facilitator is
    required for the joint team training. One
    alternative is to use a series of ìguest
    speakersî like GSW
  • The use of a formal client coaching matrix will
    help clarify responsibilities and frequency of
    contact for the Gemini team
  • The ESC and Core Team should be in place ASAP,
    ideally by end of week one
  • Have ESC/Core Team representation at joint team
    training (ideally, the top client can visit Day 1
    to provide personal endorsement and support)
  • Account Manager should meet with all ESC members
    one-on-one to exchange expectations of project
    prior to first team meeting
  • Get a commitment up front for a regular meeting
    time. Have the ESC put the meeting on their
    calendar, then change/cancel by exception
  • Push process, but not too fast. Senior
    management teams are typically slower to adopt
    Gemini processes than other teams. Hold them to
    the same standards as NWTs, but be prepared to
    take 6-8 weeks to raise their awareness of and
    skills in managing their meetings and problem
    solving processes. Remember, theyíre only
    getting a chance to practice these skills once a
    week. If you rush them it can be a turn-off

8
5. Integration - Client Partnering (cont.)
Key Insights (cont.)
  • One-on-one sessions with the clients are where
    the relationships are really nurtured. Do lots
    of private coaching and prepositioning on
    important issues
  • The process should be an experiential one versus
    just ìa Gemini meetingî. Work early to
    identify/provide roles for ESC members to play
  • Make the ESC membersí administrative assistants
    your partners. These assistants can be a
    tremendous help in getting you on their bossís
    calendar, handling logistics for you, etc. Get
    to know them, treat them with respect, and try to
    make their lives easier when you can
  • Do not engage in potential win-lose disagreements
    with the client over who gets ìcreditî for the
    benefits. Our job is not to ìproveî Gemini
    caused the benefits, but to have the benefits
    occur! It will ultimately be more of a win-win
    to have the client ìownî the benefits from the
    beginning
  • On Team Member Selection
  • Jointly determine the criteria for Process
    Reengineering team membership with the Core Team
    and, if necessary, input from the ESC
  • Select team members who
  • Are the future leaders of the business
  • Are respected by the organization for their
    technical and personal skills
  • Are knowledgeable of the organizationís resources
  • Can think ìout-of-the-boxî
  • Where possible, try to have Process Reengineering
    team champions at the ESC level

9
5.1 Integration - Understand
5. Integration
5.2 Frame
5.3 Prioritize
5.4 Manage
5.1 Understand
  • Purpose To develop a full understanding of the
    opportunities for process change, identify the
    key levers and dimensions of change to be
    utilized during the reengineering and/or process
    improvement effort, and establish the high-level
    process performance indicators (PPIs) for the
    reengineering project
  • Deliverables/Results Overall assessment of
    process change opportunities and implications
  • Establishment of key high-level process
    performance measures and objectives
  • Levers and dimensions of change identified
  • Identification of current client initiatives and
    their potential impacts
  • Understanding of relationships between stream,
    project, and business performance measures
  • Key Activities Review and validate AD findings
    and business case focusing on short, medium, and
    long term implications
  • Understand previous consulting project efforts
    (client specific and general industry) and client
    business initiatives that are likely to impact
    the project
  • Develop/refine high-level objectives for
    performance, cost, customer measures, etc.
  • Identify the key levers/dimensions of change to
    be utilized both opportunities and constraints
  • What technologies can be considered and are there
    constraints on their application?
  • Can partnerships and customer/supplier
    arrangements or relationships be pursued?
  • Are there constraints on organization, skill
    sets, or reward structures?
  • What flexibility exists for the process
    relationships and process structure?
  • Develop an initial benchmarking approach to
    support process change efforts

10
5.1 Integration - Understand (cont.)
5. Integration
5.2 Frame
5.3 Prioritize
5.4 Manage
5.1 Understand
  • Tools/Diagnostics Process Flow
    Analysis Benchmarking Service Offering
  • Initiative Rationalization
  • Optional Create a Methodology Center for
    integration, education, documentation, and
    project management
  • Develop high-level concept models to identify
    paradigm shifts
  • Create high-level views of process
    characteristics and performance with respect to
    industry and cross-industry approaches

Note A Methodology Center is an effective
approach to the distribution and management of
methodologies, tools, and techniques used during
the reengineering effort. Advantages for the
client include consistency of implementation,
central location for Gemini expertise, and the
creation of an innovative environment to shape
and enhance approaches. Advantages to Gemini
include central point of contact and control
for approaches, tools, and techniques, single
point of contact between the firm and the
project, and a formal mechanism to capture and
document key lessons and enhancements of methods.
11
5.2 Integration - Frame with Work Architecture
5. Integration
5.1 Understand
5.3 Prioritize
5.4 Manage
5.2 Frame
  • Purpose To create a high-level model of the
    fundamental work activities of the business. The
    model is a fundamental framework of the business
    in support of improvement and innovation
    activities. CONSTRUCT provides an
    integrating framework for the work activities and
    supporting information needs
  • Deliverables/Results High level work
    architecture
  • Process map (core and support)
  • Process linkage diagram
  • Dictionary of terminology
  • Key Activities Build work architecture (5-7
    levels)
  • Identify Mid-Level lifecycle
  • Develop process flows (Should-Be)
  • Analyze major/core processes (trigger and end
    result)
  • Define key linkages between processes
  • Develop total process map (core and support
    processes)
  • Tools/Diagnostics CONSTRUCT Value Chain Analysis

SM
SM
Note The construction of a Conceptual Model
during the Direction Setting phase is required
12
5.3 Integration - Prioritize
5. Integration
5.1 Understand
5.2 Frame
5.4 Manage
5.3 Prioritize
  • Purpose To determine the order and degree of
    process reengineering activities and establish
    objectives, time-frame, and project management
    approaches
  • Deliverables/Results Prioritized process change
    efforts with objectives, time-frames, and
    associated benefits
  • Project management approaches established
  • Teams identified, charters strawmodeled, roles
    and responsibilities defined
  • Overall understanding of process impacts and
    integration issues
  • Key Activities Develop decision model framework
    for process changes based on impact, importance,
    cost, value, time, degree
  • Finalize objectives and approach
  • Identify teams, establish roles and
    responsibilities, and create strawmodel charters
  • Tools/Diagnostics Decision Modeling Responsibili
    ty Charting (RACI)
  • Cost/Benefit Analysis

13
5.4 Integration - Manage
1. Integration
5.1 Understand
5.2 Frame
5.3 Prioritize
5.4 Manage
  • Purpose To manage process improvement/reengineer
    ing activities, ensure schedule commitments are
    being met, expected results achieved, and
    benefits are tracked. Provide additional support
    via tools techniques, content requirements, and
    address organizational, human factor, etc. issues
  • Deliverables/Results Well managed process
    reengineering project
  • Benefits and results identified and tracked
  • Approach and lessons documented
  • Key Activities Support development and tracking
    of team schedules
  • Provide training and content expertise as
    required
  • Act as a focal point for results and lessons
  • Manage overall integration issues across teams
  • On-going tracking of benefits
  • Tools/Diagnostics Project Management

14
6. ìEarly Winsî
6. ìEarly Winsî
  • Purpose To provide the near-term benefits
    associated with quickly implementable process
    improvements to help generate client enthusiasm
    and buy-in for the longer-term reengineering
    program
  • Expected Result A sufficient realization of
    near-term benefits to set the foundation for the
    full reengineering effort
  • Key Activities Identification of Early Win
    opportunities in the first week of process
    reengineering efforts
  • Implementation of early Quick Hits coupled with a
    continuous effort to surface others
  • Continual monitoring to assure that the Quick
    Hits identified are not in conflict with the
    longer term reengineering direction
  • Key Tools/Diagnostics Process Improvement

15
6. ìEarly Winsî - Client Partnering
Critical Success Factors
  • To have identified realistic, achieveable
    opportunities, at project inception (i.e., during
    the AD), for realizing immediate, quantifyable
    benefits
  • Benefits must be achieved early in the process

Key Activities Requiring Partnering
  • Assist the client in quantifying the potential
    benefits to be driven by early wins
  • Develop implementation plans for each early win
    and help the client through implementation

Key Insights
  • Take on the responsibility for implementation --
    role model ìhow toî implement for the client
  • Show a sense of urgency in meeting deliverables
    -- be driven
  • Do not engage in potential win-lose disagreements
    with the client over who gets ìcreditî for the
    benefits. Our job is not to ìproveî Gemini
    caused the benefits, but to have the benefits
    occur! It will ultimately be more of a win-win
    to have the client ìownî the benefits from the
    beginning

16
7. Process Reengineering
7. Process Reengineering
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
  • Purpose To analyze the current business process
    environment and create reengineered processes
    with the intent of realizing step-change
    improvement. A Process Reengineering stream is
    undertaken for each process targeted for
    improvement. Overall context and integration is
    provided by the Integration Team
  • Deliverables/Results Completed To-Be models
  • Strategies and plans for implementing all aspects
    of the To-Be models including processes and
    policies, organization, roles and
    responsibilities, and performance measures.
  • Buy-in/commitment of To-Be models and
    implementation plans across the organization
  • (see each sub-phase for key activities and
    tools/diagnostics)

17
7.1 Process Visioning
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
  • Purpose To create an overall vision for the
    process reengineering effort including
    potential enablers, constraints, key design
    characteristics, and customer needs
  • Deliverables/Results Objectives and attributes
    for the processes targeted for reengineering
  • Constraints and potential implementation barriers
    identified and prioritized
  • Customer needs by segment identified and assessed
  • Key process design criteria and high-level PPIs
    defined
  • Key Tools/Diagnostics Benchmarking Service
    Offering Customer Needs Analysis

7.1.1 Initiate Process ReengineeringWork
Teams 7.1.2 Conduct Best Practices
Benchmarks 7.1.3 Understand Customer
Needs 7.1.4 Conduct Innovation Workshops 7.1.5 Ide
ntify Design Parameters and Constraints 7.1.6 Deve
lop Key Design Criteria and PPIs
Note Development of a process vision may be
driven by either Direction Setting such as
Balanced Scorecard or augmented by Enhancement
Methodologies such as Activity Based Management
(ABM) or Building a Market-Focused Organization
(BMFO)
18
7.1 Process Visioning - Client Partnering
Critical Success Factors
  • Agreement upon a well articulated vision
    statement on the reengineering effort which is
    linked to an integrated template detailing the
    interdependent efforts required to realize that
    vision
  • Putting a ìstake in the groundî having well
    defined objectives, performance measures and
    targets

Key Activities Requiring Partnering
  • Validate Process Reengineering team charters and
    communication roll-out plans (use clientís
    existing communication mechanisms wherever
    possible)
  • Train Process Reengineering teams NWT
    methodology, process consultation, Process
    Reengineering methodology, PS/TB, meeting
    effectiveness
  • Identify and nurture influencers within teams
  • Assess effectiveness of each teamís
    approach/scope, project schedules, roles and
    responsibilities and communications plans
  • Assist client in developing a reengineering
    template
  • Schedule periodic reviews with the ESC

19
7.1 Process Visioning - Client Partnering (cont.)
Key Insights
  • On Managing Expectations
  • Manage client expectations around the
    reengineering effort -- donít oversell though --
    over deliver!
  • Continually refresh and rework these expectations
  • Be sure to validate each Process Reengineering
    team charter and communication plan with the Core
    Team
  • If the complexity and magnitude of the project
    are high enough, one option is to have a separate
    communications NWT that will have responsibility
    for communicating all teamís plans

20
7.1.1 Initiate Process Reengineering Work Teams
7.1 Process Visioning
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.4 Conduct Innovation Workshops
7.1.6 Develop Key Design Criteria and PPIs
7.1.5 Identify Design Parameters and Constraints
7.1.1 Initiate Process Reengineering Work Teams
  • Purpose To kick-off Process Reengineering teams
    including charter, roles responsibilities, and
    training of team
  • Deliverables/Results Process Reengineering Work
    Teams are established including charter, roles
    responsibilities, and scope
  • Teams are trained in use of relevant Process
    Reengineering tools and techniques
  • Each team has undergone team effectiveness
    training
  • Project direction, scope, expectations, and
    time-tables have been articulated to each Work
    Team
  • Key Activities Obtain input from the
    Integration Team
  • Refine work stream approach and charter
  • Define scope of the As-Is process to be analyzed
    (improvement/redesign) or establish boundaries
    for To-Be process (reengineering/innovation)
  • Conduct team training
  • Process design/reengineering tools/techniques
  • Team effectiveness and process tools/techniques
  • Develop initial vision of how the process should
    look and address customers, and interfaces
  • Develop initial benchmarking approach
  • Tools/Diagnostics

21
7.1.2 Conduct Best Practices Benchmarking
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.2 Conduct Best Practices Benchmarking
  • Purpose Dependent upon the benchmarking
    strategy and the level of improvement vs.
    innovation required
  • Identify best practice targets for processes
    and/or sub-processes (both within industry and
    cross-industry)
  • Identify PPIs for similar processes
  • Benchmark technology used for similar purposes
  • Benchmark organization/human resource structures,
    and facilities, for similar processes or
    environments
  • Deliverables/Results Best practice benchmarks
    for each sub-process area
  • Identified gaps between Best Practices and
    current processes/sub-processes
  • Key Activities Build client understanding of
    the role of benchmarking in reengineering
  • Conduct high-level benchmarking in each process
    area
  • Scan literature, data bases and other public
    domain sources
  • Review internal best practices and relevant
    KPIs/PPIs
  • Select Best-In-Class targets for each sub-process
    area
  • Verify with client champion(s)
  • Conduct primary research (i.e., site visits and
    telephone interviews)
  • Summarize findings

22
7.1.2 Conduct Best Practices Benchmarking (cont.)
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.2 Conduct Best Practices Benchmarking
  • Key Activities (cont.) Perform gap analysis for
    each sub-process component
  • Utilize benchmarks to help validate process
    change recommendations
  • Team Structure Benchmarking task team comprised
    of overall benchmarking coordinator from the core
    team and a designated benchmarking resource from
    each reengineering workstream
  • Tools/Diagnostics Benchmarking Service Offering
    Best Practices Data Base
  • Internal Benchmarking Clearinghouse (IBC) Gemini
    Support Centers

23
7.1.3 Understand Customer Needs
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.3 Understand Customer Needs
  • Purpose To gain the customer perspective of the
    process being reengineered. For internal
    customers, sessions can be held to clearly
    determine customers needs and requirements. For
    external customers, an understanding of their
    business should be gained through Customer Needs
    Analysis and/or BMFO techniques
  • Deliverables/Results Segmentation of customers
    along several dimensions such as product,
    profitability, size, technical sophistication,
    etc.
  • Results from customer interviews and workshops
    focused on understanding their business, their
    use of the process output, and the process
    interface(s)
  • The customer vision of the process being
    reengineered
  • Key Activities Segment customer by product,
    profitability, and size
  • Administer customer interviews ensuring coverage
    across all key segments, collecting knowledge of
    their business, their use of the process output,
    and their technical sophistication
  • Administer customer workshops to better
    understand the customer use of the process output
    and their business
  • Document and discuss results to gain the customer
    vision of the process being reengineered
  • Tools/Diagnostics Customer Needs Analysis BMFO
  • Organizational Interface Study

24
7.1.4 Conduct Innovation Workshops
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.5 Identify Design Parameters and Constraints
7.1.4 Conduct Innovation Workshops
  • Purpose To create an innovative environment and
    enhance creative thinking through topical-based
    workshops centered around leading edge thinking
    on technology or organization. Innovation
    workshops help drive ìout-of-the-boxî thinking
    by leveraging subject matter experts
  • Deliverables/Results A reengineering or design
    team well versed in leading-edge technology and
    organizational thinking with a focus on
    applicability in the client environment
  • Key Activities Identify topics and subject
    matter experts
  • Develop workshop agenda and format
  • Conduct workshop(s)
  • Summarize and document workshops with specific
    focus on applicability of ideas within client
    environment
  • Tools/Diagnostics Innovation Workshop Guidelines

25
7.1.5 Identify Design Parameters and Constraints
3.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters Constraints
  • Purpose To identify key design parameters which
    will impact the reengineering effort. Enablers
    and constraints may be in the form of
    technology, information, organization, skills,
    customer/supplier relationships, etc.
  • Deliverables/Results Identified and documented
    enablers for reengineering the selected
    process(es)
  • Identified and documented constraints on
    reengineering activities or design of the
    process(es)
  • Key Activities Brainstorm potential enablers
    and constraints
  • Research each identified enabler and constraint
    to assess the opportunity and impact
  • Determine which enablers and constraints will be
    accepted
  • Tools/Diagnostics

26
7.1.6 Develop Key Design Criteria and PPIs
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.5 Identify Design Parameters and Constraints
7.1.4 Conduct Innovation Workshops
7.1.6 Develop Key Design Criteria and PPIs
  • Purpose The final step in the development of a
    process vision. Intended to articulate the
    high-level design criteria and process
    performance indicators (PPIs) which will drive
    the detailed process design. Design criteria
    can take the form of constraints and/or enablers
    or customer requirements which will need to be
    met. PPIs describe the measures which determine
    quality of the resulting processes
  • Deliverables/Results High-level design criteria
    documented and validated
  • High-level PPIs documented and validated
  • Key Activities Identify and document design
    criteria
  • Identify and document PPIs
  • Tools/Diagnostics

27
7.2 Process Conceptualization
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
  • Purpose To analyze the current situation
    regarding processes to be reengineered while
    utilizing Benchmarking to identify best practices
    and assuring alignment with the high-level work
    architecture
  • Deliverables/Results Validated As-Is process
  • Identified performance gaps relative to internal
    and external processes
  • Characteristics of the To-Be process(es)
    developed
  • Key Tools/Diagnostics Responsibility Charting
    (RACI) Process Flow Analysis

7.2.1 Define Analyze As-Is Processes,
Sub-Processes 7.2.2 Identify/Document Current
PPIs 7.2.3 Understand As-Is Organization 7.2.4 Und
erstand Existing Systems/Technology 7.2.5 Identify
and Understand Key Cost Drivers 7.2.6 Map As-Is
Processes to Work Architecture 7.2.7 Validate
As-Is Process and Refine To-Be Characteristics
28
7.2 Process Conceptualization - Client Partnering
Critical Success Factors
  • Extensive validation of current As-Is processes
    and To-Be opportunities carried out at multiple
    levels within the organization

Key Activities Requiring Partnering
  • Train Process Reengineering teams in Brown Paper
    methodology
  • Conduct multiple prepositioning meetings with key
    clients to validate As-Is processes across the
    organization
  • Revalidate as Brown Paper changes/develops
  • Help the client define characteristics of the
    To-Be process

Key Insights
  • On Analyzing the As-Is
  • Defining and analyzing the As-Is processes is an
    early and key opportunity to build trust with the
    client. It is high credibility and low risk for
    the client while focusing on increasing intimacy
    with Gemini (T 1/R x C x I)
  • A careful balance is required to avoid ìanalysis
    paralysisî by over-detailing the As-Is systems,
    while maintaining the necessary level of detail
  • Be sensitive to subtle resistance by the client
    wanting to stay with the As-Is and continue to
    detail it (which is relatively safe and requires
    little change) before going on to the To-Be
    (which is less safe and requires more change)
  • On Developing the To-Be
  • Ensure that team members are ìunfrozenî before
    exposing them to new ideas to be heard
  • Provide relevant benchmarking information ñ Encour
    age client to attend seminars
  • Provide examples of successful implementation
  • Get the team to think out-of-the-box and not look
    only at direct competitors. One way to do this
    is to have them think about the
    characteristics/features of their To-Be, then
    identify companies that are world class in that
    characteristic to use as a benchmark. For
    example, if ìpush accountability downî is a key
    process element, then Gore-Tex may be a company
    you want to look at, since they are known for
    pushing accountability down
  • Try to get emotional issues (ìI donít want to be
    the cause of someone losing their job . . .î) out
    on the table early and demonstrate the value of
    discussing all issues openly

29
7.2.1 Define and Analyze As-Is Processes and
Sub-Processes
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
  • Purpose To thoroughly understand and document
    the As-Is process as a baseline for change
  • Deliverables/Results Completed As-Is process
    model
  • Sub-processes documented and understood
  • Key Activities Conduct client orientation on
    As-Is process development
  • Review Process Flow Analysis guidelines and
    conduct training
  • Develop ìstrawmodelî sub-process area definitions
  • Schedule and communicate brown papering events
  • Develop ìAs-Isî model
  • Lay out high-level work steps (for each
    sub-process area)
  • Develop work activity steps for each sub-process
    area
  • Define/identify work activity linkages
  • Identify inputs and outputs and information
    requirements for each work activity
  • Document As-Is conditions in each sub-process
    area
  • Conduct self-assessment of strengths and
    weaknesses/opportunities
  • Document key findings
  • Conduct formal and informal one-on-one sharing of
    sub-processes with stakeholders
  • Build/refine dictionary of terminology
  • Team Structure As-Is analysis Natural Work Team
    working under the guise of the overall
    reengineering workstream
  • Tools/Diagnostics Process Flow Analysis

30
7.2.2 Identify and Document Current As-Is PPIs
7.2 Process Conceptualization
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.2 Identify / Document Current PPIs
  • Purpose To identify and document measures being
    used in the current process, not only from an
    internal perspective but also from the customer
    perspective
  • Deliverables/Results Documented and validated
    PPIs from the current process(es)
  • Key Activities Assess existing process(es) to
    determine the characteristics and measures of
    success
  • Assess the customer view of the process measures
    and characteristics
  • Document and validate the internal and external
    process performance measures or indicators
  • Tools/Diagnostics Process Flow
    Analysis Customer Needs Analysis

31
7.2.3 Understand Existing Organization
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.3 Understand As-Is Organization
  • Purpose To understand and assess the existing
    organization, as related to the process(es) being
    reengineered, along several dimensions
    including structure, skills, policies and
    procedures, culture, human resource issues,
    training programs and needs, etc.
  • Deliverables/Results An assessment of the
    strengths and opportunities currently existing
    within the organization as they relate to the
    process(es) being reengineered
  • Key Activities Identify and document key
    elements of the organization
  • Assess current strengths and weaknesses
  • Tools/Diagnostics

Note A more in-depth assessment of
organizational diagnostics is available from the
OMD Disipline
32
7.2.4 Understand Existing Systems/Technology
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.3 Understanding As-Is
Organization
7.2.4 Understand Existing Systems/Technology
  • Purpose To gain an understanding of the existing
    technology and systems architecture and the IT
    strategy of the organization. Specific focus is
    on the process(es) being reengineered, however a
    broader view of the IT capabilities, existing and
    planned, is required in order to assess impact
    and potential related to technology and systems
  • Deliverables/Results An assessment of the
    current technology and systems capabilities,
    especially as they relate to the process(es)
    being reengineered
  • Key Activities Create a technology/systems map
    related to the process being reengineered
  • Assess the technology/systems capabilities
    resident within the organization overall
  • Tools/Diagnostics Systems Map

Note A more in-depth assessment of IT
capabilities is available by utilizing Geminiís
IT Effectiveness Approach
33
7.2.5 Identify and Understand Key Cost Drivers
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.5 Identify and Understand Key Cost Drivers
  • Purpose To identify and understand the cost
    drivers for the activities related to the
    process(es) being reengineered
  • Deliverables/Results A completed ABC paper
    providing a thorough and visual representation of
    activity costs related to a process
  • Key Activities Determine activity costs
  • detail time requirements and determine costs
  • detail all resources needed to complete activity
    and determine cost
  • Identify cost drivers i.e., what can impact the
    cost of the result
  • Add cost driver information to activity
    dictionary and process brown papers
  • Tools/Diagnostics Activity Based Costing

Note The identification of cost drivers is one
step in the development of an ABC model
34
7.2.6 Map As-Is Processes to Work Architecture
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.6 Map As-Is Processes to Work Architecture
  • Purpose To identify gaps and overlaps of
    existing processes with activities defined in the
    Work Architecture
  • Activities with multiple accountabilities
  • Activities with no accountability
  • Activities not existing in Work Architecture
  • Additionally, to establish a common terminology
    across process areas
  • Deliverables/Results As-Is processes aligned
    with work performing terminology
  • Revised Work Architecture (e.g., addition of
    missing work activities)
  • Key Activities Map As-Is processes (manual and
    automated steps) to Work Architecture
  • Capture quantitative information related to
    process activities (e.g., number of transactions,
    volume, resources, cost, etc.)
  • Revise Work Architecture to include As-Is tasks
    not previously identified and update activity
    dictionary
  • Tools/Diagnostics Activity Rationalization Value
    Added Assessment
  • Process Flow Analysis Responsibility Charting
    (RACI)

35
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.7 Validate As-Is Process Refine To-Be
Characteristics
  • Purpose To gain general consensus on the
    accuracy of the As-Is models and start to
    identify characteristics of the To-Be processes
  • Deliverables/Results Final As-Is process models
  • Initial definition of To-Be process
    characteristics
  • Milestone for broad scale communication of
    project progress
  • Key Activities Prepare Validation Workshop(s)
  • Identify and schedule key client participants
  • Prepare strawmodels of process definitions
    (scope), desired features of the To-Be process,
    and PPIs
  • Conduct client preparatory/pre-positioning
    meetings
  • Conduct validation workshop(s), develop
    definitions of To-Be process(es), and document
  • Develop sub-process characteristics for the To-Be
    model and document
  • Develop and document high-level process
    performance indicators(PPIs) and process measures
  • Identify major opportunities and gaps (between
    As-Is model and To-Be characteristics)
  • Gain agreement that overall As-Is situation has
    been accurately captured
  • Communicate summary results of workshop back to
    sites
  • Tools/Diagnostics Gap Analysis

36
7.3 Process Design
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
7.3.1 Revise To-Be Characteristics Design
Criteria 7.3.2 Create High-Level Concept
Models 7.3.3 Develop Detailed Concept
Model 7.3.4 Define Sub-Processes 7.3.5 Integrate
Rationalize Sub-Processes 7.3.6 Validate To-Be
Model 7.3.7 Identify Organization, Technology, HR
Systems, etc. Requirements 7.3.8 Perform Gap
Analysis 7.3.9 Develop To-Be PPIs 7.3.10 Pilot
To-Be Model
  • Purpose To create To-Be process models for the
    key business processes which are being improved
    or reengineered. The models are validated by
    the client and aligned with the overall work
    architecture
  • Deliverables/Results To-Be models for each
    business process targeted for improvement or
    reengineering
  • Process performance indicators (PPIs) identified
    for each To-Be process and aligned with business
    level key performance indicators (KPIs)
  • An initial description of To-Be roles and
    responsibilities
  • Key Tools/Diagnostics Concept
    Modeling Brainstorming
  • Process Flow Analysis Gap Analysis
  • Backward Chaining

37
7.3 Process Design - Client Partnering
Critical Success Factors
  • Buy-in from the involved organizational
    constituents regarding the To-Be design

Key Activities Requiring Partnering
  • Develop with the client a selection methodology
    for choosing which To-Be design will be used --
    methods, selection criteria, etc.
  • Prepositioning/coaching key clients in new To-Be
    models and how to sell them to the organization
  • Helping key work-with clients work through their
    own resistance to the To-Be models
  • Model effective conflict resolution behaviors for
    clients as they begin to roll-out To-Be models
    into their organizations
  • Train Process Reengineering work teams in
    managing resistance, conflict resolution,
    coaching skills, merchandising benefits of To-Be
    models, active listening
  • Jointly determine communications plan for To-Be
    models
  • Coach client to effectively set/determine
    KPIís/PPIís
  • Assess cultural/organizational impact of new
    processes
  • Assist client in characterizing the new skill
    base required and how the current workforce can
    be ëreskilledí
  • Schedule reviews with Core Team and ESC

38
7.3 Process Design - Client Partnering (cont.)
Key Insights
  • If resistance has not been demonstrated before,
    this is where it often begins (and intensifies
    the closer you get to implementation). Deal
    openly with the clientís concerns about
    vulnerability and loss of control
  • This is a critical point in the engagement -- now
    you are really beginning to ask the client to
    make change occur!
  • It is essential to model effective change
    management skills (i.e., listening, coaching,
    conflict management, etc.) as you deal with the
    clientís resistance behaviors. The client must
    see/feel the authenticity of your behavior since
    they cannot be expected to do what you have been
    unable to demonstrate. This ìwalking the talkî
    is a key way of continuing to build the trust by
    lowering the perceived impending risk (i.e.,
    implementation) while subtly demonstrating your
    credibility
  • Validation of To-Be models is essential to
    implementation and is a key differentiator for
    Gemini. Donít underestimate the time or
    difficulty to effectively validate. Resist the
    temptation to shortcut this process.
  • Keep driving to the ìtakeawaysî -- always be able
    to answer the question, ìSo what?î Donít
    accumulate tons of data keep netting what you
    see into summary points
  • Always validate with the top client first
  • Validate with ESC members individually
  • Prepresent to core team and other key client
    work-withs prior to Process Reengineering team
    members conducting validation meetings --
    remember, no surprises!
  • Validation of the To-Be models will enhance the
    credibility of the Process Reengineering teams.
    Make sure they are ready by conducting rigorous
    joint ìdress rehersalsî with QAís before the
    actual validation meetings
  • Coach the Process Reengineering teams to expect
    resistance when they hold their validation
    meetings and to use conflict management/managing
    resistance techniques vs. becoming defensive
  • Be sure that team members prepare a concise
    summary of their validation sessions -- net
    Bs/Cs, highlights of new issues, specific
    suggestions on H2 improve model, and overall
    temperature of validation population. Without
    the summary format, the team will be overwhelmed
    by the volume of validation data
  • Challenge the team to really think about how to
    refine their model, based on the validation.
    There is a tendency for the team to say ìWell,
    they said this and this, but I still think weíre
    rightî

39
7.3.1 Revise To-Be Characteristics and Establish
Design Criteria
7.3 Process Design
7.3.2 Create High-Level Concept Models
7.3.4 Define Sub-Processes
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
7.3.8 Perform Gap Analysis
  • Purpose To gain consensus across the
    organization of the key characteristics of the
    To-Be process. Additionally, to gain broad
    commitment and support of the design activites
  • Deliverables/Results Initial To-Be
    characteristics of the process
  • Key Activities Refine To-Be model
    characteristics (see step 3.2.6 of Process
    Conceptualization)
  • Gain inputs/builds on strawmodel process
    characteristics
  • Identify and understand issues and concerns
    related to the key process characteristics
    throughout the organization
  • Gain consensus that key characteristics of To-Be
    process have been captured
  • Incorporate/share learnings with work activities
    framework (managed by the Integration Stream)
  • Tools/Diagnostics Process Flow Analysis

40
7.3.2 Create High-Level Concept Models
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.2 Create High-Level Concept Models
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Purpose To create several High-Level Concept
    Models of the process. The goal is to create an
    environment of innovation with a focus on
    discovering potentially new and unique ways of
    accomplishing the process goals
  • Deliverables/Results Several High-Level Concept
    models including process steps, assumptions,
    resources, etc.
  • Key Activities Develop assumptions
  • Build initial models
  • Test assumptions against scenarios
  • Tools/Diagnostics Concept Modeling Brainstorming
  • Process Flow Analysis Backward Chaining

41
7.3.3 Develop Detailed Concept Model
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.3 Develop Detailed Concept Model
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Purpose To create additional detail, to the
    sub-process level, for selected Concept Models
    and test the models against design criteria
  • Deliverables/Results A few, 2-3, Concept Models
    detailed to the sub-process level including
    organization, technology, information, systems,
    and customer impact/relationship
  • A Concept Model representing the high-level
    reengineered process.
  • Key Activities Develop model detail including
    sub-processes, organization,information,
    technology, systems, etc. options
  • Select the Concept Model which will form the
    basis of the reengineered process
  • Test assumptions against scenarios and internal
    and external constituencies
  • Tools/Diagnostics Concept Modeling Brainstorming
  • Process Flow Analysis

42
7.3.4 Define Sub-Processes
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Purpose To convert To-Be characteristics into
    process steps
  • Deliverables/Results An initial set of process
    steps and related information including inputs,
    processes, and outputs
  • Key Activities Categorize each characteristic
    as one of four things
  • Input, output, process step, or measurement
  • Explore characteristics which do not fit the
    categorization and either create exceptions or
    break them into characteristics which can be
    categorized
  • Refine characteristic definitions (if necessary)
  • Develop input/process/output (I/P/O) description
    for each characteristic
  • Define what outputs are need or desired from each
    characteristic
  • Determine inputs needed (to convert input to
    output)
  • Identify conversion process links inputs to
    output
  • Examine each I/P/O in terms of how it will fit
    into process
  • Develop initial description of work activities
  • Identify known pieces of the flow
  • Map back to Work Architecture to identify gaps
  • Begin to examine work activity linkages

43
7.3.4 Define Sub-Processes (cont.)
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Key Activities (cont.) Create ìBox and Wireî
    diagram of each sub-process
  • Identify and address overlaps and gaps
  • Check for uniformity of detail in the process
    steps (a common level of detail needs to be
    ensured)
  • Note ìwhatî needs to be completely defined but
    ìwhoî, ìwhenî, ìwhereî, and ìhowî should not be
    answered
  • Tools/Diagnostics Process Flow
    Analysis Input/Process/Output Analysis (I/P/O)
  • Optional Use of dynamic modeling/simulation
    tools

44
7.3.5 Integrate and Rationalize Sub-Processes
3.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Purpose To construct a macro level process from
    the sub-process blocks and rationalize the entire
    process flow
  • Deliverables/Results An integrated,
    rationalized To-Be process model
  • Key Activities Rationalize the sub-processes
  • Identify key sub-process area(s) and map related
    sub-processes
  • Create single diagram showing all sub-processes
    and align similar work activities
  • Perform horizontal rationalization
  • Align common points in the sub-processes
  • Revisit benchmarking information
  • Brainstorm alternatives for utilizing benchmark
    data
  • Explore obvious and not so obvious improvements
    in the horizontal process
  • Perform vertical integration
  • Examine all similar types of activities and
    determine whether they can be represented by a
    consolidated process or activity
  • Tools/Diagnostics Process Rationalization

45
7.3.6 Validate Process Models
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
7.3.6 Validate Process Model
  • Purpose To ensure a common understanding
    exists of the To-Be process, field test the
    process, and obtain constituent buy-in
  • Deliverables/Results Validated To-Be model
  • Key Activities Validate the process model
  • Initial roll-out and review of To-Be model
    reviewing with content and interface experts
  • Achieve organization buy-in of the To-Be model
  • Identify opportunities relative to migrating from
    the As-Is to the To-Be models
  • Conduct high-level prioritization to determine
    order of process change implementation
  • Tools/Diagnostics Process Flow Analysis

Note Prioritization may vary from site-to-site
depending on need
46
7.3.7 Identify Organization, Technology, Systems,
etc. Requirements
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
  • Purpose To identify the technology, systems,
    and organizational requirements for the To-Be
    model
  • Deliverables/Results Outline of technology
    requirements to the level of detail required by a
    Request For Proposal (RFP) utilizing either the
    clientís or Geminiís approach
  • Outline of systems requirements to the level of
    detail required by a Request For Proposal (RFP)
    utilizing either the clientís or Geminiís
    approach
  • Outline of information requirements of the
    process to the data element level either in
    Gemini or client specific format
  • Outline of organization requirements including
    structure a