1Energy-efficient distribution transformers
2Introduction
- Distribution transformers for industrial
customers - Case study of a 1600 kVA energy-efficient
- transformer
- Ward Berghmans
- Design Manager Distribution
Transformers - PAUWELS TRAFO
3Topics of discussion
- The population of newly installed distribution
transformers - The 1600 kVA energy-efficient transformer
- Performance data comparison
- Annual Energy savings
- Financial benefits against purchase price
- Environmental impact
- Conclusion
-
41.The population of newly installed
distribution transformers
- Three market segments
- Utilities (EdF, Enel, RWE, )
- Light industry ( OEM, installers)
- Heavy industry ( private, contractors)
- Estimated figures for newly installed
distribution transformers in Western Europe -
-
51.The population of newly installed
distribution transformers
- Estimated quantities yr 2000 (3Ø only)
-
-
Utilities Light Heavy
pcs 60000 17000 6000
MVA Avg kVA 18000 300 13600 800 9600 1600
62. The 1600 kVA energy-efficient
transformer
- 2.1 Performance data comparison
- 20 kV / 400 V - 50 Hz avg loading 70
AC AMDT Diff.
Po (W) 1700 390 -1310
Pk (W) 8330 8330 0
Mass(kg) 3600 4800 2200
- Dimensions 40 mm width / -200 mm length
125 mm in height
7 2.2 Annual savings
The annual kWh consumption is obtained by
multiplying the watt rating by 8,76 11475
kWh annual savings 1033 at 0.09 / kWh
Lifetime saving _at_ 25 years gt 287,5 MWh
gt 25825
Remark 30 or 40 years in service is not uncommon
8gt within 12 to 15 of the total life time of a
distribution transformer
2.3 Financial benefits against purchase price
Price premium 3610 Payback period
3610 / 1033 /yr 3.5 years
9 2.4 Environmental impact
Efficient use of energy decreases the
greenhouse gas emissions without
sacrificing power output.
CO2 emissions _at_ 0.4 kg CO2 / kWh CO2
reduction 120 Mt
103. Conclusion
Today the technology is available to reduce
in a substantial way the losses of transformers.
This loss reduction would contribute in the
overall green house cut-back programs
This case study was based upon the 1600 kVA
transformer installed in July 1998 at the Allied
Signal production facility at Waterford (Eire)