Managing Information System Development Projects - PowerPoint PPT Presentation

About This Presentation
Title:

Managing Information System Development Projects

Description:

Managing Information System Development Projects IS 460 Notes by Thomas Hilton System Development Life Cycle (SDLC) Feasibility Study: Scope, Stakeholders, Make-buy ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 10
Provided by: TomHi150
Learn more at: https://people.uwec.edu
Category:

less

Transcript and Presenter's Notes

Title: Managing Information System Development Projects


1
Managing Information System Development Projects
  • IS 460 Notes
  • by Thomas Hilton

2
System DevelopmentLife Cycle (SDLC)
  • Feasibility Study Scope, Stakeholders, Make-buy,
    CBA
  • Analysis Present System, DFDs, etc.
  • Design General, Detailed
  • Construction Hardware Acquisition, Software
    Coding, System Testing
  • Implementation Direct, Phased, Site,
    Simultaneous
  • Maintenance Errors, Changing Business Needs
  • Start Over when maintenance costs exceed new
    system costs.

3
Other Development Models
  • Waterfall vs. Spiral
  • Prototyping
  • Rapid Application Development (RAD)
  • Joint Application Development (JAD)
  • Agile
  • Extreme

4
Managing the Project Teams and Roles
  • Team Lead
  • System Analyst
  • Programmer
  • User Documentation/Training Specialist
  • Project Librarian
  • Quality Assurance Specialist

5
Managing the Project Schedules
  • Gantt Charts(MS Project)
  • PERT Charts(Visio)
  • Critical Path Charts(Rational Rose)

6
Managing the Project Costs
  • Feasibility Study 5
  • Analysis 10
  • Design 10
  • Construction 25-50
  • Implementation 25-50
  • Maintenance 5
  • annual cost as percent of initial project

7
Cost-Benefit Analysis
  • Quantify all Costs
  • Quantify all Benefits
  • If Benefits Exceed Costs, Do It.
  • CBA is Cost-Biased
  • Many Costs are Present and Tangible
  • Many Benefits are Future and Intangible
  • Must Have a Champion!

8
Estimating Time Cost
  • W.A.G.
  • Consult Past Projects
  • Break Down Phases into Tasks and Tasks into Steps
  • Average Best Worst Case
  • Add a Fudge Factor from Experience

9
Ethics Issues
  • Pressure to Accept Unrealistic Parameters from
    Stakeholders
  • GroupThink
  • Working Conditions
  • Team Member Relationships
  • Vendor Relationships
  • Hiding Mistakes
  • Other?
Write a Comment
User Comments (0)
About PowerShow.com