Title: FOREST FOCUS (EC regulation n
1FOREST FOCUS (EC regulation n 2152/2003)
- INTENTION BIOSOILS
- to broaden the scope of the monitoring scheme
to new environmental issues such as soils and
forest biodiversity - (Article 6 demonstration projects)
2Demonstration ProjectFurther development of soil
and biodiversity monitoring
(Standing Forestry Committee 22/10/2004)
- Soil Module
- Comes close to a new survey
- Will be used to test the recently updated ICP
Forests manual
3Background
- 1st Forest Soil Condition Database
- 1985-1998
- 5,289 Level I plots in 28 Countries
- Limitations
- 58 overlap with Crown Condition dbase
- Only limited number of plots with complete
mandatory dataset - No possibilities for element pools calculation
(limited depths and bulk densities missing)
4Background
- Soil data quality
- Transnational comparability of data limited
- Missing pedological information (soil and site
description) to allow for integrity checks - First step Update of ICP Forest Manual on
Sampling and Analysis of Soil Part IIIa (2003) - Level II soil condition soil chemistry
- Characterised from 1995 onwards
5Major Objectives
- Complete and Improve the quality of Forest Soil
Condition Database (Level I and II) - Improve overlay with Crown Condition database on
4635 plots within EU25 (2003) 5915 plots (30
countries) - Complete (updated) set of mandatory parameters on
all Level I plots optional parameters desirable - Create data compatibility important for other
European objectives (e.g. EU Thematic Soil
Strategy) - Monitor changes in soil chemistry after 10 years
- Testing of updated manual and other QA/QC efforts
6Time schedule
Phase I 2005 Preparation of survey develop QA/QC strategy, planning meetings, ring test
Phase II 2006-2007 Soil survey and soil analysis in the MS and central laboratory
by end 2008 Central database completed
Phase III 2009 - ? Data evaluation, interpretation and reporting, writing of Forest Soil Condition Report
7Actors
- Co-ordination by Forest Soil Co-ordinating Centre
in close co-operation with JRC - Survey and soil analyses by MSs
- Subset of samples and parameters analysed by
central laboratory - After completion database gt JRC and DG ENV
8Cost estimate per plot sampling and analyses
Level I Mandatory parameters 1000
Level I Mandatory and optional parameters 2200
Level II Mandatory parameters 5200
Level II Mandatory and optional parameters 7600
Soil profile description 2000
9Cost estimates
- Costs partly depend on
- Level I and/or Level II plots?
- about 4800 Level I and 750 Level II
- All plots or subset?
- Mandatory or mandatory and optional parameters
(see ICP Forests manual)? - Include soil profile descriptions and related
laboratory analyses?
10Scenario 1 Mandatory param. all level I and II
plots
Costs/ point Plots Total EU contr. EU contr.
FSCC preparation 333,305 100 333,305
FSCC co-ordination survey 513,600 100 513,600
FSCC data evaluation, interpretation and reporting 366,475 100 366,475
Soil survey Level I all plots mand. param. 1000 4700 4,700,000 75 3,525,000
Soil survey Level II all plots mand. param. 5200 750 3,900,000 75 2,925,000
Data management for plots 100 5450 545,000 75 408,750
Transport of subset samples 15 1200 18,000 75 13,500
Central laboratory 600 1200 720,000 100 720,000
Total 8,805,630
11Scenario 2 Level I Mand. param. all, Optional
subsetLevel II Mand. Option. subset
Cost / plot Plots Total EU contr. EU contr.
Cost / plot Plots Total
FSCC preparation of survey 333,305 100 333,305
FSCC co-ordination of survey 513,600 100 513,600
FSCC data evaluation, interpretation reporting 366,475 100 366,475
Soil survey Level I mand. 1000 3500 3,500,000 75 4,605,000
Mand. optional parameters 2200 1200 2,640,000
Soil survey Level II subset of plots, Mand. opt. param. 7600 250 1,900,000 75 1,425,000
Data management of plots 100 4950 495,000 75 371,250
Transport of subset samples 15 1200 18,000 75 13,500
Central laboratory 600 1200 100 720,000
Total 8,348,130
12Planning
FSEP workshop on QA/QC29-30 November 2004
initially meant for limited N experts
New invitation, new programme
Monday 29/11 Tuesday 30/11
FSEP workshop on QA/QC FSEP meetingon demonstration project
13Monday 29 Nov 04
- 830 1230 QA/QC in the field
- 1400 1730 QA/QC in the laboratory
Tuesday 30 Nov 04
- Proposal of demonstration project
- Content What and how? Which scenario?
- Timing When?
- Role of the MS, JRC, FSCC Who?
- Structure of national programmes