Title: SQA Role during Software Requirements Phase


1
SQA Role during Software Requirements Phase
  • Schulmeyer, G.,Handbook of Software Quality
    Assurance, Chapter 16.6,
  • Prentice Hall, 1999.

2
Documents Produced
  • Two major outputs of this phase
  • An SRS for each Configuration Item (CI)
  • An Interface Requirement Specification (IRS) for
    all CIs
  • If more than one CI have to be developed
  • Both documents have to conform to a defined
    format and content
  • e.g. IEEE Standard, NASA Standard, Military
    Standard

3
Role of SQA
  • Any deviations or additions to the SRS or IRS
    must be discussed and agreed to by stakeholders
  • e.g. SQA
  • Before and During internal technical reviews
  • Verify that all of the agreed contents are
    included in draft SRS-IRS
  • Verify that all requirements are included in
    document
  • Verify traceability (e.g. check for no apparent
    predecessor, invalid, missing requirement)
  • Upward, i.e. from SRS to System requirements
  • Downward from System requirements to SRS-IRS

4
Role of SQA
  • Before and During internal technical reviews
  • 4. Verify that each SRS is consistent with other
    SRS and the IRS for that system
  • Evaluate the adequacy of quality factors
    requirements
  • e.g. maintainability, portability
  • 6. Verify SRS-IRS for completeness and
    correctness, explicit, non ambiguous and
    testable.
  • e.g. Is testable criteria well defined
    (pass-fail) ?
  • 7. Evaluate if verification method described in
    Software Development Plan (SDP) is adequate
  • e.g. test, demonstration, analysis, inspection

5
Role of SQA
  • Before and During internal technical reviews
  • 8. Prepare a list of discussion items for
    internal draft SRS-IRS reviews
  • Record and track action items
  • Prepare report of reviews
  • Validate actions
  • Verify updated SRS-IRS
  • 3 . Attend Technical Reviews with Customer
  • Customer may request changes to documents
  • SQA will review changes before document is
    released to customer
  • SRS-IRS, once released, becomes part of a
    baseline
  • i.e. allocated baseline