1The NCSX Engineering Web An Overview
- Part II
- Procurement, Statements of Work, Specifications
2Everything You Wanted to Know
- Information Links
- Design Criteria
- Procurement Plan
- SPEB Schedules
- SOWs
- GRD
- Subsystem Specs
- Guidance Links
- Procurement Guide
- SOW Guidelines
- Spec Guidelines
3Design Criteria
Only the Structural and Cryogenic Design Criteria
is posted perhaps more will be posted in the
future
4NCSX Procurement Plan
- NCSX Procurement Plan
- Tech Rep
- Procurement Rep
- Requisition/Date to Procurement
- Estimated Award Date
- Actual Award Date
- PO/SC Number
- Estimated Delivery Date
- Actual Delivery Date
- Cost
5SPEB Schedules
Detailed steps and schedules for major SPEB
actions
6Statements of Work (SOW)
Single page with links to all the current
versions of Statements of Work (SOW)
SOWs do not normally transmit technical
requirements
7General Requirements Document (GRD)
8Subsystem Specs
- Three NCSX Specification Categories
- ASPEC General Requirements Documents
- BSPEC Development Specifications
- System Requirements Documents generally
prepared at the two-digit WBS level - CSPEC Product Specifications
- Detailed component level specifications
9GRD Subsystem Specs
Modular Coils Example
Links to specific WBS element specifications
10Three Guidance Documents
- Procurement Guide
- Easy to understand primer on procurement actions
on NCSX - SOW Guidelines
- Provides easy to understand section by section
guidelines - Spec Guidelines
- Provides easy to understand section by section
guidelines
11NCSX Procurement Guide
12SOW Guidelines
First Section Provides and Overview
Subsequent Sections Provide Section by Section
Details
13Specification Guidelines
First Link Leads to General Guidelines and then
expands to section by section detail