Airport Master Plans. AC 150/5070-6B. An airport master plan is a comprehensive study of the airport and typically describes short-, medium-, and long-term plans for ... – PowerPoint PPT presentation

Number of Views:2278
Avg rating:3.0/5.0
Slides: 36
Provided by: uky108
Category:

less

Transcript and Presenter's Notes

Title: Airport Planning


1
Airport Planning
2
errata
  • Traditional forecasting techniques are still in
    play, but are considered archaic.
  • US airlines are focused on international travel
    more than domestic population growth.
  • Impacts by low cost carriers are game changers
    and are volatile.
  • Fleet mixes are changing drastically with
    regional jet leases coming to their end.
  • Small airports like LEX look at the airline
    industry very differently than DFW, ATL or LAX.
  • Non-aeronautical development considered?

3
Types of airport plans
  • Airport systems plans
  • Airport master plans (similar to LRP)
  • Airport project plans (similar to TIP)

4
FAA Regulations and Rules
  • Advisory Circulars
  • Federal Aviation Regulations

5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
Airport Master Plans
  • AC 150/5070-6B
  • An airport master plan is a comprehensive study
    of the airport and typically describes short-,
    medium-, and long-term plans for airport
    development. Master planning studies, that
    address major revisions are commonly referred to
    as Master Plans, while those that change only
    parts of the existing document and require a
    relatively low level of effort tend to be known
    as Master Plan Updates. In common usage,
    however, the distinction refers to the relative
    levels of effort and detail of master planning
    studies. In most cases, the master plan will
    include the following elements
  • 1) Pre-planning
  • 2) Public Involvement
  • 3) Environmental Considerations
  • 4) Existing Conditions
  • 5) Aviation Forecasts
  • 6) Facility Requirements
  • 7) Alternatives Development and Evaluation
  • 8) Airport Layout Plans
  • 9) Facilities Implementation Plan
  • 10) Financial Feasibility Analysis

11
  • 1) Pre-planning The pre-planning process
    includes
  • Initial Needs Determination
  • Development of Study Design
  • Application for Study Funding
  • Request for Proposal and Consultant Selection
  • Negotiation of Consultant Contract

12
  • 2) Public Involvement Once the consultant team
    is under contract and has been issued a
    notice-to-proceed, establish a public involvement
    program and identify and document the key issues
    of various stakeholders.

13
(No Transcript)
14
  • 3) Environmental Considerations A clear
    understanding of the environmental requirements
    needed to move forward with each project in the
    recommended development program.

15
  • 4) Existing Conditions An inventory of
    pertinent data for use in subsequent plan
    elements.

16
FAA Airport Master Record Form
  • Runway Data
  • Length, width, composition, grade, wind cover,
    direction
  • Navaids Data
  • Lighting, slope indicators, obstructions, wind
    indicators, etc.
  • Terminal Services
  • Fire rescue, weather station, type and number
    of hangars, type and amount of fuel storage, type
    of services, hours of operation
  • Operational Data
  • Based GA and Military Aircraft, estimated
    location and itinerant operations

17
  • 5) Aviation Forecasts Forecasts of aeronautical
    demand for short-, medium-, and long-term time
    frames.

18
(No Transcript)
19
  • 6) Facility Requirements
  • Assess the ability of the existing airport, both
    airside and landside, to support the forecast
    demand.
  • Identify the demand levels that will trigger the
    need for facility additions or improvements and
    estimate the extent of new facilities that may be
    required to meet that demand.

20
  • 7) Alternatives Development and Evaluation
  • Identify options to meet projected facility
    requirements and alternative configurations for
    each major component.
  • Assess the expected performance of each
    alternative against a wide range of evaluation
    criteria, including its operational,
    environmental, and financial impacts.
  • A recommended development alternative will emerge
    from this process and will be further refined in
    subsequent tasks.
  • This element should aid in developing the purpose
    and need for subsequent environmental documents.

21
Airport Site Selection Factors
  • Convenience to users
  • Availability of land and costs
  • Design and layout of airport
  • Airspace obstructions
  • Engineering factors
  • Social and environmental factors
  • Availability of utilities
  • Atmospheric conditions
  • Hazards due to birds
  • Coordination with other airports

22
  • 8) Airport Layout Plans
  • set of drawings that provides a graphic
    representation of the long-term development plan
    for an airport
  • the primary drawing in this set is the Airport
    Layout Plan.
  • Other drawings may also be included

23
(No Transcript)
24
(No Transcript)
25
  • 9) Facilities Implementation Plan
  • summary description of recommended improvements
    and associated costs
  • schedule of improvements depends on levels of
    demand that trigger the need for expansion

26
  • 10) Financial Feasibility Analysis
  • Identify the financial plan for the airport
  • describe how the sponsor will finance the
    projects recommended in the master plan
  • demonstrate the financial feasibility of the
    program

27
Environmental planning
  • Next lectures

28
Continuous planning
  • Update data affecting master plan
  • Reappraisal of master plan in view of changes
  • Modify plan to retain viability
  • Track system plan and rectify master plan with it
  • Public input
  • Refine goals and policies
  • Integrate system plan with other modes
  • Analyze special issues
  • Publish interim reports and plan updates

29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com