Just-In-Time Production - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Just-In-Time Production

Description:

Management philosophy Pull system though the plant WHAT IT IS Attacks waste Exposes problems and bottlenecks Achieves streamlined production WHAT IT DOES – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 16
Provided by: edut1550
Category:

less

Transcript and Presenter's Notes

Title: Just-In-Time Production


1
Just-In-Time Production
13
2
Minimizing Waste JIT Production
  • Produce...
  • ...what is needed...
  • ...when its needed...
  • ...NOTHING MORE!

11
3
Waste--Operations
  • (1) Waste from overproduction
  • (2) Waste of waiting time
  • (3) Transportation waste
  • (4) Inventory waste
  • (5) Processing waste
  • (6) Waste of motion
  • (7) Waste from product defects

6
4
Minimizing Waste Kanban Production Control
Systems
15
5
JIT Requirements Work with Vendors
  • Reduce lead times
  • Frequent deliveries
  • Project usage requirements
  • Quality expectations

27
6
JIT Requirements Reduce Inventory More
  • Stores
  • Transit
  • Carousels
  • Conveyors

28
7
JIT Requirements Improve Product Design
  • Standard product configuration
  • Standardize and reduce number of parts
  • Process design with product design
  • Quality expectations

29
8
Partnership Relationship
  • Continuing relationship involving
  • a commitment over an extended time period,
  • an exchange of information, and
  • an acknowledgement of the risks rewards of the
    relationship.

9
9
JIT Purchasing--Requirements
  • Reduced lot sizes
  • Frequent and reliable delivery schedules
  • Reduced and highly reliable lead times
  • Consistently high quality levels for purchased
    materials

11
10
JIT Purchasing--Suppliers
  • Fewer, nearby suppliers
  • Repeat business
  • Support suppliers competitiveness
  • Clusters of remote suppliers
  • Limit competitive bidding to new parts
  • Resist vertical integration
  • Encourage suppliers to implement JIT purchasing

12
11
JIT Purchasing--Quantities
  • Steady output rate (a desirable prerequisite)
  • Frequent deliveries in small lot quantities
  • Long-term contract agreements with minimal
    release paperwork
  • Deliver quantities variable from release to
    release but fixed for whole contract term

13
12
JIT Purchasing--Quantities (Ctd)
  • Little or no permissible overage or underage of
    receipts
  • Suppliers encouraged to package in exact
    quantities
  • Suppliers encouraged to reduce their production
    lot sizes (or store unreleased material)

14
13
JIT Purchasing--Quality
  • Minimal product specifications imposed on
    supplier
  • Help suppliers to meet quality requirements
  • Close relationships between buyers' and
    suppliers' quality assurance people
  • Suppliers encouraged to use process control
    charts instead of lot sampling inspection

15
14
JIT Purchasing--Shipping
  • Scheduling of inbound freight
  • Gain control by use of
  • company-owned or contract shipping
  • contract warehousing
  • trailers for freight consolidation/storage

16
15
JIT Purchasing--Benefits
  • Consistent quality
  • Savings on resources
  • Lower costs
  • Special attention
  • Saving on tooling
  • Loyalty associated with long-term relationships
    with suppliers

17
Write a Comment
User Comments (0)
About PowerShow.com