ATCA Crate / Infrastructure in place - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

ATCA Crate / Infrastructure in place

Description:

7 single phase power outlets available (burndy connector). ... - input (80%) ~ 3.5 kW maxi = ~ 16A 16A circuit breaker should be Ok (to be check with the ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 12
Provided by: cern97
Category:

less

Transcript and Presenter's Notes

Title: ATCA Crate / Infrastructure in place


1
  • ATCA Crate / Infrastructure in place
  • Rack in D3 dimension
  • Electrical power availability
  • Tell1 racks running in D3 (air ventilation,
    safety aspect)
  • Temperatures, power of crates in D3
  • Conclusion

2
  • Rack in D3 dimensions 2m54 x
    60 cm x 90 cm
  • Useful space
  • height 56U (2m49) 10U need to be free at the
    bottom for cabling and water valve access.
  • width 19 (48,3cm)
  • depth 73cm
  • Level1 crates 11U (9U2U Fan) x 19 x 72cm
  • ATCA crate (ex ELMA catalogue)
  • ? dimensions OK, few mechanical adaptation (26U
    instead of 22U used for 2 crates).

3
Electrical Power for Frond End racks in
D3 Maximum available 410 kW Consumption
total 70 kW (in Physics mode) ?
No problem with general power (17 of the
capacity used)
4
  • Electrical power available per rack
  • distribution designed for 11 kW/rack max.
  • 16 A circuit breakers (Merlin Gerin C60H D16A).
  • 7 single phase power outlets available (burndy
    connector).
  • ATCA crate consumption
  • ??
  • ex. ELMA catalogue Output PSU 2799 watt maxi
  • -gt input (80) 3.5 kW maxi 16A
  • ? 16A circuit breaker should be Ok (to be check
    with the manufacturers)

5
  • Cooling
  • vertical air flow
  • mixed water exchanger
  • Air temperature inside the rack
  • with 2 exchangers 18-19 C
  • - Safety aspect (DSS)
  • Thermo switch 40 C (increase to 60 C
    possible), Smoke detection, CO2 automatic
    triggering.
  • ATCA Crate need to be adapted (by the company?)
    to be compatible with vertical air flow.



  • water16 C

6
24 Tell1L1 crates location / 8 racks spare in
D2 Detector Extension row ? enough space Air
Temperature in Rack (Physic mode)
7
  • Cooling / power dissipated
  • Tell1 crate
  • Velo 17 Tell12 Hugin power 820 watts / 865
    watts in Physics
  • -gt total 2 crates 1.7kW/rack ( Temp inside
    rack 19C )
  • Other example TT 16 Tell1 1 Hugin 645 watts
    / 705 watts in Physics
  • ATCA crate maxi 14 boards x 250W 3.5 kW
  • -gttotal 2 crates 7.0 kW
    maxi /rack (4 times more !)
  • Tests done in 2002 by PH electronic group (3
    exchangers, 3 crates)
  • http//cdsweb.cern.ch/record/38031/files/epess-200
    3-014.pdf
  • Conclusion The air-water rack cooling system
    developed for LEP and used for the measurements
    in this report can cope with a total power
    dissipation of the order of 10kW with less than
    2 power loss to the surroundings. This
    corresponds to a useful power dissipation per
    subrack of 2.3kW. In these conditions most of the
    electronics is below 40 C
  • ? Cooling in place should be Ok (but 40C
    inside?) , maybe a third exchanger need to be
    installed, need to be check more in detail, tests
    ?

total 6.9 kW for 3 crates
8
General power summary
Heat removed by water Temp input 16 C Temp
output 0.5 C Flow 60m3/h ? 35kW Heat
lost in room removed by air conditioning
units Air temperature in the rooms 20.5 C
few kW (D3A unit capacity 26kW maximum) (D3B
unit capacity 32 kW maximum) Dissipation in
detector side 30kW ?
Total Electrical power (Level1LVHV) 70 kW
Rack Temp inside 18-19 C
9
General power summary
Heat removed by water Temp input 16 C Temp
output 0.5 C Flow 60m3/h ? 35kW (
30-70 kW with ACTA) Heat lost in room removed
by air conditioning units Air temperature in the
rooms 20.5 C few kW (few additional) (D3A
unit capacity 26kW maximum) (D3B unit capacity
32 kW maximum) Dissipation in detector side
30kW ?
Total Electrical power (Level1LVHV) 70 kW
Rack Temp inside 18-19 C
Remove L1 crates -12kW Add ATCA crates
40-80kW ? (depend on boards quantity) ?Total
30-70 kW ? additional
Maxi 105kW need to be removed with water
output 1.5 C (instead of 0.5 C) ? Ok with
general cooling (ex. 4C for PC farm in
Physics mode)
10
  • CONCLUSION
  • ATCA crate 19  dimensions compatible with Rack
    used
  • few mechanical adaptation needed 13U instead
    of 11U
  • General electrical distribution already in place
    enough
  • Maximum breaker in place 16A (but could be
    changed if needed)
  • Crate should be adapted for vertical air cooling
  • Heating power to be evacuated per rack 4 times
    more / current L1 rack ? need to be check with
    more detail (boards quantity/crate)
  • installation of additional 2U exchanger ?
  • General cooling power enough
  • Rk cabling arrangement should be also taken into
    account early

11
spare slide