Objectives - PowerPoint PPT Presentation

About This Presentation
Title:

Objectives

Description:

Objectives Analyze processes in AHU and buildings Single-Zone Systems Zone any space with a thermostat Air conditioning Recirculation Reheat Evaporative Cooler ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 13
Provided by: Jeffrey510
Category:
Tags: objectives

less

Transcript and Presenter's Notes

Title: Objectives


1
Objectives
  • Analyze processes in AHU and buildings

2
Single-Zone Systems
  • Zone any space with a thermostat

3
Air conditioning
4
Recirculation
5
Reheat
6
Evaporative Cooler
7
Air-to-air heat exchanger
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
Summary
  • Show HVAC processes on a psychrometric chart
  • Draw condition lines
  • Define sensible heat ratio
  • Draw HVAC processes for real buildings
  • Single zone
  • Multiple zone
  • Skipping Chapter 9

12
HW2
Problems from the course book 7.1, 7.21, 7.3,
7.4, 7.27, 8.5, 8.17, 8.20
  • Problem 9
  • An office building has
  • - Sensible load of 91000Btu/h
  • - Latent load of 16000 BTU/h
  • - Required amount of fresh air of 1000CFM
  • - Supply air temperature is 55 F in winter and 93
    F in winter.
  • Outdoor design parameters are
  • Summer DBT105 F and RH33
  • Winter 22 F and RH80
  • Surface temperature of the cooling coil in AHU is
    45 F (when it operates).
  • Calculate the energy for cooling and heating
    coils and steam humidifier for winter and summer
    design condition for CAV system that
  • a) control the relative humidity to 50 and room
    temperature to 74 F
  • b) control only room temperature to 74 F

Due February 23rd
Write a Comment
User Comments (0)
About PowerShow.com