Title: Manaus Refinery Modernization
1ARPEL Seminar on Strategic Management Future
Refining Industry Configuration
Manaus Refinery Modernization Juarez Barbosa
Perissé Refining Technology - Petrobras
2Refining Infra-Structure
Downstream Refining Capacity (thousand bpd)
REMAN 46
LUBNOR 6
RLAM 323
REGAP 151
REDUC 242
REVAP 251
RECAP 53
REPLAN 365
RPBC 170
REPAR 189
REFAP 189
BRASIL 1,985
BRASIL
Authorized Capacities - ANP
3 4(No Transcript)
5REMAN Units
- 1 crude distillation (atmosferic and vacuum)
- 2,300 m3/d (14,500 B/d)
- Start up Sep/1956
- 1 crude distillation (atmosferic Urucu Crude)
- 5,000 m3/d (31,500 B/d)
- Start up Mai/2000
- Total 7,300 m3/d ( 46,000 B/d)
- 1 Catalytic Cracking (Start up Sep/1956)
- 500 m3/d (3.150 B/d)
6Petrobras Downstream Challenges
7Front-End Loading (FEL)
Develop a detailed definition of the project
scope aiming the business goals.
--Why
--What
--When
--How
--Who
8Manaus Refinery Project Main Goals
- Achieve diesel oil and gasoline future
specifications - Increase diesel oil production
- Achieve environmental demands
9Gasoline and Diesel Sulfur Content Evolution
2004 2005 2006 2007 2008 2009 2010 2011 2004 2005 2006 2007 2008 2009 2010 2011 2004 2005 2006 2007 2008 2009 2010 2011 2004 2005 2006 2007 2008 2009 2010 2011 2004 2005 2006 2007 2008 2009 2010 2011 2004 2005 2006 2007 2008 2009 2010 2011
Gasoline 1000 1000 1000 1000 1000 50
Country diesel 3500 3500 3500 2000 2000 500
City diesel 2000 2000 500 500 500 500
Special diesel 50
(Sulfur, max ppm)
10Overview of Scope
HDT Naphtha
Cat Ref
ATM
Light Crude
HDT Diesel
Thermal Cracking
Heavy Crude
ATM
VAC
FCC
11- Technological evaluation
- New Yields
- Operation Costs
- Investment
12Identification of Significant Risks
- Analysis of Environmental, Health and Safety -
Gasoline and Diesel oil imported costs-
Logistics for available crude oil- Freight
cost
13Benefits
- Increase heavy crude oil processing
- Higher quality diesel and gasoline
- Increase of higher value products
- Elaboration of the Technical-Economical
Evaluation Study
14Situation October 2006
- FEL-1 approved
- Elaborating conceptual design of Petrobras
Technology Units