Abort Gap Monitor Results PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Abort Gap Monitor Results


1
Abort Gap Monitor Results
TeV Meeting 6/11/04 Randy Thurman-Keup
2
Need to scale PMT by 3/7
3
Need to scale PMT by 3/7
4
Used VME controls (T. Meyer) to move the
integration gate through the abort gap. HV gate
was left fixed over the entire abort
gap. Integration width was 15 buckets.
5
Issues Need computer control of shutter for
background measurements Timing jitter Crosstalk
with synclite Various electronic
improvements Automated calibration?
Write a Comment
User Comments (0)
About PowerShow.com