DSM2 Calibration: Optimization Weighting Scheme Using Management Objectives - PowerPoint PPT Presentation

About This Presentation
Title:

DSM2 Calibration: Optimization Weighting Scheme Using Management Objectives

Description:

DSM2 Calibration: Optimization Weighting Scheme Using Management Objectives Marianne Guerin Observation: DSM2 is Used as a Delta Management Tool Define calibration ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 8
Provided by: guer153
Learn more at: https://www.cwemf.org
Category:

less

Transcript and Presenter's Notes

Title: DSM2 Calibration: Optimization Weighting Scheme Using Management Objectives


1
DSM2 CalibrationOptimization Weighting Scheme
Using Management Objectives
  • Marianne Guerin

2
Observation DSM2 is Used as a Delta Management
Tool
  • Define calibration metric in operational terms
  • First Define which targets - stage, flow, EC -
    are important to Delta water management
  • Then Sensitivity analysis and parameter
    correlation
  • Next Define objective function and specify
    weights
  • Rough Calibration
  • Selected time spans iterative fine calibration
    to minimize model error

3
Minimize Root Mean Square Error
  • Weights normalize different observation types
    (units, magnitudes, data accuracy)
  • Prioritize
  • Total weight by observation type (Swi, Swj, Swk)
    on stage (s), flow and velocity (f), and EC (c)
  • Individual weights within each category

4
Stage
  • South Delta Ag. Barriers
  • Western model boundary
  • HORB ?
  • Sac R. Boundary?

5
Flow or Velocity
  • Old and Middle Rivers
  • QWEST
  • VAMP response
  • DCC response

6
EC Compliance Points
  • West Delta
  • Jersey Point, Emmaton
  • South Delta
  • Old R. nr Middle R., Tracy Rd. Bridge, Brandt
    Bridge
  • Interior Delta
  • SF Mokelumne, SJR San Andreas

X2 ?
  • Export Area
  • West Canal at CCFB, DMC at Tracy PP
  • Contra Costa Canal, SJR at Antioch

7
Calibration Objective Function Defining a
Weighting Scheme
  • Operational targets
  • Stage
  • Flow
  • Salinity targets
  • EC
  • X2
  1. Quantify goodness of fit
  2. By-hand post-processing
  3. Automated needs software
  4. Purchase/public domain
  5. Develop
  6. Zonation to simplify
  • Benefit to Management Approach
  • Peer-review-able body of information
  • Primary use of DSM2
  • Clarifies reliability of model-based management
    decisions
Write a Comment
User Comments (0)
About PowerShow.com