(Title) Operational Readiness Review (ORR)
Edits are made on the slide master accessed
via /View/Master/Slide
Update logo
For Minor Projects, LLE combines the FDR ORR
EQC Checklists /View/Master/Slide
Date of Review First Use Acknowledgements Image
of diagnostic
Establish Key Contacts
(name) PI (name) PA
LLE Will Complete after the review
Update Date from /View/Master/Slide Master
Enter number of pages required for PDM submittal
2
Overview - Motivation
-Summarize Scope-Summarize Motivation
Campaign DetailsEP or Omega Or Joint
Shot?Campaign Type? Side Lighter/ Back
Lighter?What TIMs or Fixed? High Xrays, High
Yield? High EMP?, Tritium?
3
Design Overview
A few overheads showing design diagnostic and
overall deployment
4
Beam Envelope - Clearances
Step File must be sent to LLE one week prior to
the review for beam clearance and space envelope
checks
5
Space Claim Floor Plan - Storage
6
Operations
  • Setup/Alignment Overview
  • Typical Shot Steps to Service diagnostic
  • SRF Status
  • Status of Procedure Approved Procedure
    install, Alignment and shot operations procedure
    must be in the PDM and approved by LLE prior to
    ORR
  • Preventative Maintenance Procedures Status
  • Spare Parts

7
FDR Action Items
Copy FDR Action Items Table Here Review after
the design presentation this helps LLE to
understand the items are addressed
8
Safety Inspection Action Items
9
Viewing/Editing SRA
1) Click on your project from the project status
summary to get to the LLE Project Milestones page
3)Edit then Select Save Print
4)This button allows the SRA to be
viewed/printed/saved Save the SRA
5)Take a screen shot of the SRA and place in
presentation
2) Select SRA
10
SRA
11
FMEA Each Entry on SRA requires an Entry on
FMEA additional entries can be made
Enter the Line s into the SRA Form (Associated
Risk)
There must be a change in one of these two
columns (Before vs After)
Double Click Edit
12
Viewing EQC
1) Click on your project from the project status
summary to get to the LLE Project Milestones page
3) Select Save Print Landscape Take a screen
shot of each page and put in presentation (two
slides)
2) Select EQC
13
EQC
14
EQC
Write a Comment
User Comments (0)
About PowerShow.com