Briefing z udzialem polskich podmiot - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Briefing z udzialem polskich podmiot

Description:

... (F, D, I, UK), if not possible then a preference clause will be included in the ITT giving preference to bids led by non LSIs In the overall procurement ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 7
Provided by: Agni158
Category:

less

Transcript and Presenter's Notes

Title: Briefing z udzialem polskich podmiot


1
  • Briefing z udzialem polskich podmiotów z sektora
    kosmicznego, 13.10.2014 r., PARP
  • IPC Komitet Polityki Przemyslowej ESA
  • Anna Kobierzycka
  • Departament Innowacji i Przemyslu MG

2
Polityka przetargowa w misji JUICE
  • The first Large (L1) mission in the Cosmic
    Vision programme
  • Foreseen launch date in 2022
  • Mission adoption planned for the 145th meeting of
    the SPC in November 2014.
  • Procurement proposal for the mission planned to
    be presented to the IPC for approval at the 289th
    meeting in November 2014

3
Polityka przetargowa w misji JUICE
  • The spacecraft is planned for launch in 2022.
  • A 7.5 year cruise toward Jupiter.
  • The Jupiter orbit insertion will be performed in
    January 2030.
  • It will be followed by a tour in the Jupiter
    system.
  • In September 2032 the spacecraft will be inserted
    into polar orbits around Ganymede.

4
Polityka przetargowa w misji JUICE
  • The Core Team - maximum size of 35 of the
    contract value (excluding the industrial
    contingency)
  • Core Team the Prime Contractor plus those
    subcontractors which are considered, and properly
    demonstrated to be, from a technical and
    programmatic standpoint, mandatory to carry out
    the tasks of the Prime Contractor
  • Minimum number of six subsystems already defined,
    more might still come - separate ITTs, nominally
    the ITT for a subsystem shall be restricted to
    companies residing outside the big four countries
    (F, D, I, UK), if not possible then a preference
    clause will be included in the ITT giving
    preference to bids led by non LSIs
  • In the overall procurement approach, attention
    will be paid to ensure a fair return of
    activities to SME

5
Polityka przetargowa w misji JUICE
  • Special measures to support New Member States
  • manpower support contracts for activities within
    the perimeter of the Prime Contractor and the
    Core Team responsibility
  • one or more element of the ground support
    equipment suite via direct/restricted competition
  • development of an additional qualification model
    of JUICE spacecraft equipment
  • development of selected activities in Best
    Practices via a StrIn-like approach, i.e. with a
    co-funding scheme (project/initiative for each
    New Member State (NMS) (1/3 2/3))

6
  • Dziekuje za uwage
  • Departament Innowacji i Przemyslu
Write a Comment
User Comments (0)
About PowerShow.com