Title: ES


1
ESH Status of Construction and Technical System
Installations
  • Michael Scharfenstein
  • Project ESH Coordinator

2
Subcontracted Work Goals
  • GC managed
  • Injury rate concern
  • Project responsibility
  • 90 days of field work remaining
  • The goal is Zero future incidents
  • CF Technical Systems Installation
  • Maintaining exemplary safety record
  • Direct subcontractor management
  • Detailed work planning

3
Project-specific ISEMS Implementation
  • LCLS Directorate Integrated Safety Management
    Plan
  • LCLS Work Authorization Procedure
  • LCLS Project ESH Plan
  • Job Safety Analysis
  • Daily Tailgate Safety Meetings
  • PM/UTR manages each subcontract
  • Leads to success
  • TCCO Project Health and Safety Plan
  • Job Safety Analysis
  • Daily Pre-Task Planning Meeting
  • Pre-Task Checklist
  • Superintendents assigned geographically

4
PROJECT SAFETY EXPERIENCEThrough April 2008
DART Rate
  • Total Project Hours
  • 1.8 M Hours worked
  • SubContractors
  • 484 K Hours worked
  • DART Rate 3.7 (9 Incidents)
  • TRC Rate 4.6 (2 Incidents)
  • LCLS Collaboration
  • 1,300 K Hours worked
  • DART Rate 0.3 (2 Incidents)

Injury rates based on 200 K hours (100 man years)
of effort. DOE/SC Goal is a Reportable Case (TRC)
rate of lt 0.25 and a Days Away, Restricted, or
Transferred (DART) rate lt 0.65 per 100 FTEs.
5
Project Safety(Contractor/Technical
Systems/Collaboration)
6
TCCo Incident Distribution
7
TCCo Stewardship
  • October 06 thru April 07 Ramp Up to Full
    Production Procedural Violations
  • Stand Down of Construction Activities All Hands
    Meeting
  • Review of Work Planning Process for field work
    JSA process inadequate
  • Check/correction of existing documentation
  • PMT changes
  • Deficiency Notices
  • May 07 thru November 07 Full Production
    Injuries
  • Multi-day Stand Down of Construction Activities
    Corrective Action Plan
  • Procedural violations transition to injures
  • Paperwork ineffectively utilized by CM/GC and
    trade contractors
  • PE changes
  • Deficiency Notices Fines
  • Communication with Corporate TCCo
  • Safety Stewardship Committee Established
  • Full time on-site medic (30hr OSHA)
  • UTRs added focus on safety

8
TCCo Stewardship contd
  • December 07 thru April 08 Injuries continue
  • Two incident associated with one sub
  • PM removed
  • Work stopped
  • 90 Days (to the end of field work)
  • Focus on effective work planning execution
    sought
  • Plan for joint observation developed
  • Attendance at daily morning work planning
    meetings
  • JSA review with workers throughout the day
  • Identification / monitoring of specific trades
    or tasks for safe work practices
  • Must communicate with the worker
  • The goal is Zero!

9
CF Technical Systems Stewardship
  • Excellent Safety Record
  • 100K hours w/o injury
  • S20, MMF, Injector, BC 1 2
  • Issues addressed immediately
  • Positive Results
  • Project Managers / UTRs / Installation Managers
  • Direct management of subcontractors
  • Communicate ESH Expectations
  • Guide them to success
  • Enforcement when needed
  • Thorough Work Planning and Control
  • Aggressive ISM management
  • Ownership of safety a condition of employment
  • The goal is to maintain Zero!

10
Conclusion
  • Past TCCo safety performance is not
    acceptable
  • LCLS providing more prescriptive direction
  • Past 2 months acceptable performance
  • Maintain CF Technical System direct managed
    work performance
  • The goal is Zero!

11
end of presentation