BR/TSD - PowerPoint PPT Presentation

About This Presentation
Title:

BR/TSD

Description:

RRC-04/05 Information meeting BR/TSD GE89 Plan The Plan for VHF/UHF television broadcasting in the African Broadcasting Area and neighbouring countries, Geneva, 1989 – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 16
Provided by: Bot116
Category:
Tags: tsd

less

Transcript and Presenter's Notes

Title: BR/TSD


1
RRC-04/05 Information meeting
BR/TSD
GE89 Plan
The Plan for VHF/UHF television broadcasting in
the African Broadcasting Area and neighbouring
countries, Geneva, 1989
Geneva 2003
2
RRC-04/05 Information meeting
GE89 Planning Area
BR/TSD
5.10 African Broadcasting Area means 5.11 a)
African countries, between the parallels 40
South and 30 North 5.12 b) islands in the
Indian Ocean west of meridian 60 East of
Greenwich, situated between the parallel 40
South and the great circle arc joining the points
45E00, 11N30 and 60E00, 15N00 5.13 c) islands in
the Atlantic Ocean east of line B defined in No.
5.8 of these Regulations, situated between the
parallels 40 South and 30 North.
Geneva 2003
3
RRC-04/05 Information meeting
GE89 Planning Area
BR/TSD
neighbouring countries Bahrain, the Islamic
Republic of Iran, Iraq, Kuwait, Oman, Qatar,
Saudi Arabia, United Arab Emirates, Republic of
Yemen (including those parts of its territory
which is not situated in the African Broadcasting
Area).
Geneva 2003
4
RRC-04/05 Information meeting
GE89 Planning Area
BR/TSD
African B. Area neighbours
Geneva 2003
5
RRC-04/05 Information meeting
GE89 Bands
BR/TSD
  • 47-68MHz ,(54-68MHz for countries listed in No.
    5.169 of RR, not concerned by RRC04-05)
  • 174-230 MHz
  • 230-238 MHz and 246-254 MHz for the countries
    listed in No. 5.252 of RR not concerned by
    RRC04-05
  • 470-862 MHz.

Geneva 2003
6
RRC-04/05 Information meeting
GE89 Plan stations
BR/TSD
Originally 10 313 stations Today 11 023
stations Digital 10 stations RRC04-05 1
0 801 stations
Geneva 2003
7
RRC-04/05 Information meeting
GE89 Plan
BR/TSD
Geneva 2003
8
RRC-04/05 Information meeting
Modifications to the GE89 Plan
BR/TSD
No of modifications processed per year
Geneva 2003
9
RRC-04/05 Information meeting
Modifications to the GE89 Plan
BR/TSD
Coordination is required if certain limits
exceeded
Geneva 2003
10
RRC-04/05 Information meeting
Modifications to the GE89 Plan
BR/TSD
  • 4.3.7.1 modifications normally accepted if
    nuisance
  • field at site of affected station does not
    exceed
  • 47 dB (µV/m) in band I
  • 53 dB (µV/m) in band III
  • 62 dB (µV/m) in band IV
  • 67 dB (µV/m) in band V

Geneva 2003
11
RRC-04/05 Information meeting
GE89 Plan Publication of Modifications
BR/TSD
  • Publication in Part A of a SS
  • Comment period (100 days)
  • Publication in Part B and entry in GE89 Plan

Geneva 2003
12
RRC-04/05 Information meeting
GE89 Plan
BR/TSD
Time-limits for notification and comments
Geneva 2003
13
RRC-04/05 Information meeting
GE89 Plan
BR/TSD
BRIFIC SS SUMMARY ON WEB
Geneva 2003
14
RRC-04/05 Information meeting
GE89 Plan
BR/TSD
BRIFIC SS SUMMARY ON WEB
Geneva 2003
15
RRC-04/05 Information meeting
GE89 Plan
BR/TSD
BRIFIC SS SUMMARY ON WEB
Geneva 2003
Write a Comment
User Comments (0)
About PowerShow.com