Title: M. T. MUCHERO MANAGEMENT CONSULTANCY SERVICES (PVT) LTD
1M. T. MUCHEROMANAGEMENT CONSULTANCY SERVICES
(PVT) LTD
- GECAFS
- DISTRIBUTION ISSUES AND CONSUMPTION PATTERNS
2BROAD ISSUES
- GEC induced disasters have become more common and
have occurred more frequently in Southern Africa
in the last few decades. - Poor acceptance and utilisation rate of early
warning systems by policy and decision makers
until it is too late - Institutional Memory is a serious problem in the
region with adverse impact on the Regions Food
Distribution Systems resulting in increased
population vulnerability.
3EFFECTS OF 1991/92 DROUGHT
-
- Description Measurable Indicator
-
- Area of land stricken by drought 2.6 m sq.
miles - Total Number of People in SADC affected 86
million - Of which People at Serious Risk 20 million
- Of which Refugees Displaced People 1.5
million
4CEREAL CONSUMPTION PATTERNS 1992/93In Metric
Tonnes
- Normal Normal Total
- Country Production Imports Consumption
-
- Angola 320,000 300,000 620,000
- Botswana 67,000 151,000 218,000
- Lesotho 189,000 207,000 396,000
- Malawi 1,507,000 80,000 1,587,000
- Mozambique 620,000 530,000 1,150,000
- Namibia 114,000 61,000 175,000
- Swaziland 144,000 47,000 191,000
- Tanzania 4,100,000 85,000 4,185,000
- Zambia 1,645,000 104,000 1,749,000
- Zimbabwe 2,592,000 75,000 2,670,000
-
- SADC Total 11,298,000 1,640,000 12,938,000
-
- Source Adapted from Assessment of the
Response to the 1991/92 Drought in the SADC
Region, July 1993, SADC Food Security Technical
and Administrative Unit. -
-
5SADC CORRIDOR TRANSPORT SYSTEMS 1992/93
- THE 6 SADC CORRIDORS
-
- 1. Northern Corridor Dar es Salaam Port
- Eastern I Corridor Nacala Port
- Eastern II Corridor Beira and Maputo Ports
- Southern Corridor RSA Ports
- Western I Corridor Walvis Bay Port
- 6. Angolan Ports and Corridor Luanda, Namibe
and Lobito Ports
6NORTHERN CORRIDOR DAR ES SALAAM ISSUES
- INFRASTRUCTURAL CONSTRAINTS
- Grain Handling at the Port of Dar, Discharge of
Cargo into Bags - Problems with Interchanges at Kapiri Mposhi,
Zambia between TAZARA and ZRL - Transshipment at Interchange Points
- Wagon availability ( and Locomotive availability)
- Resource availability to hire wagon and
locomotive power - Physical constraints on TANZAM Highway
(narrowness and steep gradients)
7NORTHERN CORRIDOR DAR ES SALAAM ISSUES
- NON-INFRASTRUCTURAL CONSTRAINTS
- Poor Management
- Poor Coordination
- Lack of operational procedures
- Lack of genuine cooperation
- Lack of coordination with / between / among
Donors and Recipients / Port Authorities.
8EASTERN I CORRIDOR - NACALAISSUES
- INFRASTRUCTURAL CONSTRAINTS
- Rail only Corridor
- Under rehabilitation at the time of drought
response efforts
9EASTERN II CORRIDOR BEIRA MAPUTOISSUES
- INFRASTRUCTURAL CONSTRAINTS
- Ongoing Rehabilitation
- Physical Impediments (steep gradients and tight
curves) - Grain Handling to allow for 70 Bulk and 30
bagged deliveries shortage of bags and
tarpaulins. - Transshipments of Malawi bound cargo in Harare.
- Lack of resources shortage of rolling stock and
locomotive power financial constraints
10EASTERN II CORRIDOR BEIRA MAPUTOISSUES
- NON-INFRASTRUCTURAL CONSTRAINTS
- Security Problems (1993)
- Theft (due to physical impediments on rail line)
- Regulatory Constraints for cargo destined for
Zambia - Conflict between Humanitarian requirements and
Commercial concerns - Port labour management systems ( no incentives to
work more than necessary) - Poor Management - Transit toll fees in Mozambique
11SOUTHERN CORRIDOR RSA PORTS ISSUES
- KEY SOLUTIONS
- Speedy Grain Handling Capacity throughout
- Bulk railway wagons
- Surplus locomotive power
- Conversion of fruit rail carriages to general
cargo rolling stock - Speedy wagon turnaround
- Joint operations in rail interchanges
- Temporary Storage Silo system instituted
- Bulk-bagging facilities by GMB at Beitbridge
(similar operations at Beira port by private
companies contract by port authorities)
12REGIONAL TRADE
13SADC Countries(Thanks to Dr. Stephen Nanthambwe)
14OTHER INSTITUTIONS
- ROLE OF CUSTOMS
- Anti-smuggling duties
- Checking the grain itself
- Controlling traffic
- Licensing foreign traffic
- Collecting transit charges
- Pre-clearance arrangements
15OTHER INSTITUTIONS
- ROLE OF VEHICLES INSPECTORS
- Checking vehicle configurations, gross weights,
axle weight limits
16OTHER INSTITUTIONS
- ROLE OF PLANT PROTECTION
- Checking Phytosanitary requirements
- Spraying trucks with fumigants / pesticides
(Chirundu Border post and Dar es Salaam port)
17REGIONAL INSTITUTIONAL FRAMEWORKS
- SADC Secretariat Fund raising together with the
UN - SADC Food Security Technical and Administrative
Unit - SATCC Southern Africa Transport and
Communications Commission - SADC LAC ( Logistics Advisory Centre)
- LAU Logistics Advisory Unit (WFP)
- BCG Beira Corridor Group
- GOCC Grain Operations Centre
- FEWS Famine Early Warning System
- NEWU National Early Warning Unit
- REWU Regional Early Warning Unit
- INTERFAIS International Food Aid Information
System