Last slide presented at LMC early May 2012
gt Delicate operation, 12hrs before getting to
the long 36 hrs recovery
221Sept12 - 1.8K unit for sector 81(78)
Faulty Heater 50 of flow generated
stopped, getting below minimum tolerated by CCs
Impossible to re-connect at low pressure without
it!
Decision to fill the pumping line to a pressure
compatible with reconnection at higher pressure
without the heater, But higher pressure means as
well higher temperature and long recovery!
3Milestones
- During TS3, several strange effects on some
instrumentation for this sub-system. Team
investigating in cavern Friday when complete stop
of 1.8K unit at 16h. 24VDC power unit found down,
exchanged (medium term situation since 2010 with
2-3 failures/year, type test ready, global
upgrade gt LS1) - Restart on tracks with sectors connected when
400V heater failure stopped it again at 22h. As
2nd time in 1 year, decision to go slowly without
it (investigation to be foreseen when possible) - 12hrs of delicate operation with control
algorythm not correctly described, well mastered
Saturday noon - 36hrs of recovery for 2 sectors left without
cooling for 18hrs
We will validate the 2nd refrigerator in the
coming days, and get
organised for diagnostic and repair of the heater
(window t.b.d)