Title: U.S.%20Technical%20Advisory%20Group%20Meeting%20Recap%20of%20the%20April%20Morocco%20PC%20283%20Meeting%20Victor%20Toy,%20CIH,%20CSP%20Chair,%20US%20TAG%20to%20PC%20283%20March%2025,%202014
1U.S. Technical Advisory Group MeetingRecap of
the April Morocco PC 283 MeetingVictor Toy,
CIH, CSPChair, US TAG to PC 283March 25, 2014
2Agenda
- Opening Remarks (Tim Fisher, Vic Toy)
- New members (Jim Howe)
- Morocco Meeting Review (Kathy Seabrook, Thea
Dunmire, Todd Hohn, Vic Toy) - Next Steps (Vic Toy)
- Administrative items (Vic Toy)
3Meeting Objectives
- Overall Objective The purpose of this meeting
is to give the U.S. - TAG Attendees a recap of the London Meeting and
to start planning - for review and action on Committee Draft
-
- Review and impressions from the Morocco PC 283
Meeting - High level insights on WD1 and U.S. comments
- Strategies and plans for TAG activities
Updated WD1 text not yet available
4Summary of the PC 283 meeting in Morocco
- Objective Processing WD comments into a
Committee Draft - 1300 comments, 230 Pages 49 page PoC annex
- 85 Delegates in attendance, 33 of which attended
for 1st time - PC Membership 45 P Mem (2), 15 Observers, 12
liaisons (6) - May 1st ISO/DEC Directives 2 month CD review
period, one 9 mo extension, a now optional FDIS
stage - Development of a draft scope and purpose
- Guidelines for use oriented towards
interpretation of requirements - WG1 divided into 5 workgroups only one of which
completed its task - Work extended to a July 1 deadline with ballot
for a CD - Plans for an August 1 release of a CD
- Delay will push next PC meeting to November
5Status and subsequent plans
- Text in WD1 has for the most parts been revised,
some parts are still subject to change - The Annex has not been fully addressed yet
- PC 283 Task groups are continuing their work via
correspondence (or physical meetings) if
necessary to - complete their standards text and
- the text for the guidance annex
- 1st July - The completed texts will be assembled
into a full draft by the WG Convener and
Secretary - The full draft will be edited by the WG Convener
with the assistance of the TG Leaders
6Approximate breakdown of the number of comments
against clauses in WG1/N22
Risk def.
Leadership
Risk Management
Improvement
Total no. of comments in WG1/N22 1295, on 227
pages
7Casablanca Resolutions
- Resolution 1/2014
- To circulate a Committee Draft of ISO 45001 for
comment and ballot, following preparation of the
text by ISO/PC 283/WG1 - Resolution 2/2014
- Amend the Design Specification of ISO 45001 to be
consistent with - The Committee Draft of ISO 45001, and
- The results of the ballot on OHS versus OSH
(see PC283/N88) - Circulate the amended Design Specification for
review and confirmation at the next plenary
meeting - Resolution 3/2014
- To thank the host of the meeting, IMANOR, and
its sponsor INCVT for the excellent meeting
facilities provided and for its wonderful
hospitality
8International Organizational Relationships
ISO 45001 Occupational Health Safety Management
Systems
PC 283 45 Member countries 15
Observing countries 12 Liaison Members
U.S.
TAG to PC 283 91 Organizational Members
Delegates/ Experts
Mirror Committees
9Timeline (key dates) 3 Years (N68)
- Terms
- New Work Item Proposal (NP)
- Working Draft (WD) First draft developed by the
Project Committee and experts - Committee Draft (CD) First public draft for
circulation to public for comments - Draft International Standard (DIS)
- Final Draft International Standard (FDIS)
10Timeline (key dates) 3 Years (N68)
- 10/21/13 Initial PC 283 Meeting to develop WD1
- 02/28/14 Comments due on WD1
- 04/04/14 PC Meeting drafts Committee Draft 1
(CD1) (now Jul 1) - 06 /2014 CD1 released for comment/ballot (now
Aug 1) - 11 /2014 PC Meeting drafts Draft International
Standard (DIS) - 01 /2015 DIS released for translation
- 06 /2015 DIS Ballot
- 11 /2015 PC Meeting drafts Final DIS (FDIS)
- 01 /2016 Final draft of FDIS ? ISO processing
- 07 /2016 FDIS Balloting
- 09 /2016 Publication of ISO 45001
Next slide
11Work plan following the Morocco meeting
- 15 July - The full draft will be circulated to
the members of WG 1 for a Yes/ No ballot on
whether it is adequate to go forward as the CD
text - 1st August CD ballot starts
- 1st October CD ballot closes
- Next PC meeting end of November
2 mo. Comment (TAG Effort)
12Reminder of Some of the Major issues so far
- Terms and definitions (e.g. issues,
workplace, risks) - The concept of positive risks or opportunities
- Management system vs. program orientation
- Feed back and crisp relationships between
sections of 45001 - Employee / worker participation
- What stage assessments (i.e. risks) are conducted
- Flow and understanding of the planning section
from assessment to prioritization to objectives
to system issues - Supplier / outsource management (including
procurement and contractor management)
13and the major challenges
- Major issues related to requirements
- Definition of what a management system is
- Objective of the OSHMS (compliance vs.
conformance) - Application of the HLS
- Speaking small (SMEs)
- Depth or requirements or need for strong ANNEX
- Major issues related to development and final
product - Diversity of input
- HLS fit
- Input by experts
- Need for basic vs. mature OHSMS concepts
- Language and translation
14Strategies for pushing the US position
- Educate, deliberate and advocate
- In general, give and take
- Assure concepts are included in annex if not
standards language - Open door for future documents
15TG2 PlanningVictor Toy, CIH, CSPChair, US TAG
to PC 283March 23, 2014
16General Overview
- Of the 1295 comments submitted
- 266 (20) are on Section 6,
- One third of those (80) are in the definitions of
risk and hazard - Comments include
- Feedback (choices) on terminology
- Proposals to adjust structure of the section to
improve flow - Proposals to transfer content to other sections
- Suggestions for changes to wording
- Draft content for guidance on specific topics
17Section 6 Comment disposition
- Delineation of comments processed
- Terminology 66
- Structure Flow 17
- Text detail 156
- Editorial 19
- Annex 8
- TOTAL 266 (258 addressed 8 remaining) but a
few - deferred comments need to be revisited. Work not
yet - started on annex
18Comments overview hot topics
- Overall Structure of Section
- Suggestion to move OHS risk assessment from Sec 6
to 8 - Suggestion to move Comp Obligations from Sec 6 to
4 (Context) - General concern about overall flow especially
Section 6.1 - Terminology and requirements
- opportunities
- compliance obligations / legal and other
requirements - objectives are these improvement or
performance objectives? - System Risks vs. OHS Risks
- clear distinction required in section 6
consistent with Annex SL
19Comments overview hot topics
- Annex topics (not complete list as this is work
in progress) - (Risk) criteria
- Guidance on compliance obligations
- Analysis of near misses/incidents
- Residual/unmitigated risk
- Risk gap analysis/assessment
- Human factors
- Limited time projects/operations
- Multi-employer work sites
20Section 6 Terminology Risk
- Majority of comments appear to favor separating
general (management system) risks from OHS
risks - Some favor making the OHS risk definition a note
to the Annex SL risk definition (U.S. comment) - A few prefer purely to use Annex SL
- Choice of 3.09A close to U.S. preference (an
estimate of vs. combination) -
3.09A - OHS risk - combination of the
likelihood of an occurrence of a hazardous event
or exposure(s), and the severity of injury or
illness ill-health that may be caused by the
event or exposures
21Section 6 Terminology Hazard
- 3.09B1 most popular, followed by B2 (the U.S.
preference) which said condition, set of
circumstances, or inherent property that can
cause injury, ill health/illness or death - 3.09B1 (before) - Hazard - source, situation
or act with a potential for harm in terms of
human injury or ill-health/illness, or a
combination of these -
3.09B1 (after) - Hazard - source, situation or
act with a potential to cause human injury or ill
health
22Section 6 Terminology Misc
- Opportunity - should not be defined but guidance
is necessary to explain the concept as follows - assure the OHS management system can achieve its
intended outcomes - prevent, or reduce, undesired effects
- achieve continual improvement
- Deferred to TG5 (Terminology)
- Compliance obligations vs. Legal and other
requirements - Objectives
23Overall Structure of Section
- Suggestion to move OHS risk assessment from
Section 6 to 8 - Keep main discussion in 6, with focus in 8
remaining on application of controls (arising
from RA) but noting the feedback loop to 6. - Suggestion to move Compliance Obligations from 6
to 4 (Context) - Keep main discussion in 6, with existing mention
reference in 4 - General concern about overall flow especially
Section 6.1 - Agreement to reposition Compliance obligations
section - Majority in TG2 favor position early in Section 6
before HAZID RA - Minority strongly favor position after HAZID RA
- Referred to plenary resulting in no change
24U.S. Section 6 Comments
- General responses
- Accepted
- Section 6 organization and flow
- Feedback from other sections into planning
- Management of Change
- Meaningful employee participation
- Multiemployer worksite (to annex)
- Review of management system (to annex)
- Not Accepted
- Specific system improvement language
- Identification of system issues
- Clarification of risk assessment in section 6 vs
8
Not Accepted 7
Accepted 16
Annex 9
Deferred 2
total 34
25Next Steps and Administrative Items
26 III. Next Steps
- PC 283 TGs complete standards language and annex
- Vote to move to CD (delegates)
- U.S. TAG begins work on review and comments
- Distribute CD
- TAG Member Review and comment (at least 2 weeks)
- TAG Meeting(s) to address U.S. comments
- 1 week Face to face meeting possibly around week
3-4 - Consolidation of U.S. TAG comment resolutions
(who?) - Final Review by Telecon of major issues (if
possible) - US TAG committee vote on CD
- Comments and vote submitted to BSI
-
27IV. Administrative items
- TAG organization / working groups
- Facilitators/Edit team
- OHS vs OSH Ballot
28US TAG to PC 283 Organizational Structure
29Thank you!