Title: Predictive Maintenance Technologies Spirit AeroSystems Inc.
1Predictive Maintenance TechnologiesSpirit
AeroSystems Inc.
- Ed Fenn-
- Twenty-eight years with Spirit/Boeing
- Electrical background
- Twenty-four years facilities management
- Responsibilities include machine tool retrofit,
facilities network, industrial controls and
reliability-centered maintenance - Retrofitted over 385 machines and responsible for
one patent - Don Chrisman
- Thirty-one years with Spirit/Boeing
- Twenty-years experience maintenance mechanic
- Twenty-years experience as a vibration technician
- Level 2 vibration certification
- Todd Shepherd
- Twenty-nine years with Spirit/Boeing
- Twenty-five years experience maintenance
electrician - Four years experience thermography technician
- Level 2 thermography certified
2Predictive Maintenance TechnicianSpirit
AeroSystems Inc.
- Oil Analysis
- Vibration Analysis
- Laser Alignment
- Ultrasonic
- Thermography
3Mission Statement
- To communicate accurate information through the
use of trend analysis, pattern recognition,
statistical process analysis and device limit
ranges to aid in increasing machine life cycle
and machine availability.
4Oil Analysis
- Affects on Machine Devices
- Pumps
- Oil tank
- Flow control value
- Pressure relief valve
- Cylinders (counter balance)
- Directional control valves
- Throttle valve
- Heat exchangers
5Oil Analysis (cont.) What we measure
- Fluid Properties
- Viscosity analysis
- FTIR Fourier transform infrared spectroscopy
- Element analysis
- Contamination
- Particle count
- Moisture analysis
- Patch Test
- Wear Debris
- Wear debris density
- Analytical ferrography
- Elemental analysis
6Vibration Analysis
- Periodically collect and analyze vibration data
on machine tools and components - Install remote collection boxes and permanent
mount accelerometers - Field balancing on fans and blowers
- In Shop balancing (Balance Stand) on fans,
blowers and rotating components
7Vibration Analysis (cont.)
- Laser shaft alignment on rotating equipment
(except process pumps) - Laser sheave to sheave alignment
- Acceptance Testing on new equipment and
components - Assist shop personnel in troubleshooting suspect
bearing and alignment problems - Ultrasonic testing
8Thermography
- Periodically inspect electrical components and
control cabinets for heat related issues - Assist shop personnel in troubleshooting suspect
electrical problems - New equipment acceptance testing
9Thermography (cont.)
- Aids in identifying bearing and coupling problems
in rotating equipment - Identify heat exchanger problems
- Identify problems in heating and cooling coils
- Identify insulation problems with ovens and
furnaces - Identify problems with oven and furnace door
seals
10Effects of Vibration on Equipment
11Vibration Issues - Loop Pump
- Definition of resonance and demo
- Base resonance - causing vibration limits to be
exceeded during New Equipment Acceptance Testing
12Vibration Issues Loop Pump
- First attempt to qualify new loop pump, concrete
pad not adhered to floor - Second attempt, resonant condition in pump base
identified eliminated by creating animation to
identify flexing points - Reasons for animation before adding gussets
13Vibration Issues w/ Loop Pump
First Attempt Concrete not adhered to floor,
noticed base moving during data collection.
Contractors corrected by bolting concrete pad to
concrete floor.
14Vibration Issues Loop Pump
15Second Attempt After flexing in pump base was
identified with the help of the animation,
contractors corrected by welding gussets in
proper location.
16Vibration Issues w/ Sump Cover
- Resonance condition in sump cover causing
premature failure of pump bearings
17Laser AlignmentShaft to Shaft
18(No Transcript)
19Laser AlignmentSheave to Sheave
20Balance StandBalance rotating components
21(No Transcript)
22 Thermography
23 LIEBERT UPS
24MILLFuse
25STRECH PRESSPump
26 COLD BOX
27 Questions