Title: LSI Implementation Phased Approach Recommendation


1
LSI Implementation Phased Approach Recommendation
24 Nov 2004
2
Objective Work Flow Model
SA
Functional Domain
Platform Domain
SHAPM
SA Kr
Specs Stds
Shipyard Install
Tiger Team Install
PMW (F)
PMW (P)
Shipyard
LSI (P)
ACA
LSI (F)
Platform Integration
Functional Integration
Developer
Product
C4I Mission Package
Producer
Product Suite
Product
Government
Platform Installation
Platform Installation
Install Matls
Process
Deliverable
Delivery
Acceptance Test
Lifetime Support
Domain Boundary
Control
3
LSI Implementation Phased Approach
  • Implementing the LSI concept will be challenging
  • Over 100 programs in various states of
    development
  • New organizational construct needs to solidify
  • Operating relationships and execution
  • No existing PEO single architecture upon which to
    base total transition to LSIs
  • Additional PM training required
  • EVMS
  • Contract change control
  • Risk Management
  • Phased approach allows lessons learned in
    implementation to be tested, then refined
  • Phase 1 System Architect
  • Phase 2 Two Pilot LSIs
  • Phase 3 Transition to all LSI program execution

4
LSI Implementation Phased Approach
  • Phase 1
  • Establish the System Architect
  • In place at start of FY 06
  • Excluded from future LSI procurements
  • Initiate enhanced management training for PEO
    managers
  • EVMS
  • Contract change control
  • Risk Management
  • Roles and responsibilities of PEO program
    managers
  • Immediate tasks for the SA
  • Analyze AS IS program matrix to
  • Determine what is being done, by whom
  • Budgets and costs for each aspect of each program
  • Develop the Integrated schedule of all programs
    in PEO
  • Identify Program transition points (milestone
    events)
  • Develop A-Spec (for system-of-systems)

5
LSI Implementation Phased Approach
  • Phase 2
  • Contract for LSI Pilots (1 Functional, 1
    Platform)
  • In place during FY 07 (based on Phase 1 product
    availability)
  • Schedule driven by System Architect products for
    RFPs
  • Tasks for the Functional LSI
  • Analyze system to meet SA allocated requirements
  • Develop implementing Architecture in Functional
    Domain
  • Identify needed capabilities (i.e. gaps)
  • Develop B-Spec for Functional Domain
  • Establish functional program integration facility
  • Integrate all subsystems into the functional
    system
  • Transition legacy programs per the SA timeline
  • Modify SOWs of existing developmental contracts
    to transition responsibility to the LSI (and
    incentivize performance)

6
LSI Implementation Phased Approach
  • Phase 2 (continued)
  • Tasks for the Platform LSI
  • Develop implementing platform architecture
  • Develop configuration(s) for platform(s)
  • Establish platform system integration facility
  • Integrate all subsystems into the platform system
  • Modify production contracts as feasible to
    transition to platform LSI and support
    integration (and incentivize performance)

7
LSI Implementation Phased Approach
  • Recommended Phase 2 LSI Pilots
  • Functional Program Networks (PMW-160)
  • Fewer prime contractors
  • Key backbone element
  • Need single, integrated network to achieve Fn
  • Require consistent approach to security (IA)
  • Must interface with the outcome of OA and TCE
  • Highest likelihood of success but with
    significant interfaces
  • Platform Program Submarine Programs (PMW-770)
  • Good foundation already in place
  • Opportunity to test the new PEO management
    structure
  • Good sponsorship

8
LSI Implementation Phased Approach
  • Phase 3
  • Contract for Remaining LSIs
  • In place for FY 08 execution
  • Allows opportunity to refine approach based on
    Pilots
  • Permits detailed program transition plans to be
    developed
  • In advance, existing contractors should be tasked
    to develop transition plans for their components
    to specified operating and architecture framework
    (i.e. during Phase 2)

9
LSI Pilot Contracting Strategy
  • LSI contracts should be
  • Performance based ID/IQ contract which allows
    both Fixed Price and Cost Plus tasks
  • Award term for the maximum term. No increased
    risk to the Government, but some incentive for
    industry
  • Potentially profitable. Factor large scale
    integration industry Return on Sales (ROS) needs
    (as opposed to engineering service industry
    needs) into the award fee structure. A good
    LSI should achieve 15 ROS.
  • Full Open Competition with down select to a
    Limited Competition
  • Evaluation factors should make it clear that the
    LSI must be capable of delivering complex systems
    at a 100M/yr clip
  • Heavy emphasis on management capability.
  • EVMS use is routine
  • Engineering organization with depth
  • Proven subcontracts organization
  • Proven transparent make/buy process
  • CMMI Level

10
LSI Pilot Contracting Strategy
  • Plan for complexity and dont let the schedule
    drive a bad procurement Use a multi-step
    acquisition process
  • Issue draft RFP for comment by industry
  • Establish cost (best value) criteria
  • Issue final RFP. Scope, Statement of Objectives,
    Ts Cs, evaluation criteria
  • 100 page technical management approach
    appropriate to PMW. Ensure technical and
    management are in one inseparable volume since
    they are inseparable.
  • Acceptance of Ts Cs
  • Candidates present a four hour oral presentation
    fleshing out the approach and answering questions
  • Down select to two viable candidates based on
    appeal of the approach
  • Update and re-issue SOO and RFP for limited
    competition.
  • Final proposal is the complete planning package
    (SOW, Integrated Master Schedule to PEO defined
    capability as required over the initial PoP,
    Basis of Estimates), as evaluated through an
    Integrated Baseline Review, and a cost proposal
    based on the planning package.
  • Award to single LSI based on best value

11
LSI Pilot Contracting Strategy
  • Performance award fee metrics examples
  • Detailed planning
  • Integrated Baseline Review success
  • Availability of Technical Performance Measures
    for interim technical evaluation
  • Cost and schedule via monthly EVMS
  • Schedule baseline delivery dates met (if no
    contract perturbations)
  • Performance Design walkthroughs
  • Performance Design test progress relative to
    Technical Performance Measures
  • Performance at standard test points SQT, FAT,
    system level testing, installation testing, end
    to end TECHEVAL
  • Meeting small business goals
  • Cost reduction incentives for systems being
    procured and supported
  • ID/IQ contract and other vehicles (e.g. SEAPORT)
    provide ample off ramps

12
Small Business Impacts
  • LSI concept is NOT detrimental to growth of small
    business. The opposite can be true.
  • Establish small business goals for LSIs
  • Total dollar value goal (may be different for
    different LSIs e.g. a Satellite LSI and a
    software application LSI are clearly two
    extremes)
  • Number of small businesses goal
  • Conventional socio-economic goals
  • Incentivize goals through award fee formula
  • Key Element Although concept is not detrimental
    to small business growth, the shift of small
    business revenue to a subcontracted position
    would require an adjustment of SPAWARs direct
    contracting goals.

13
Estimated FTE by Phase
14
Implementation Costs
15
Implementation Costs