Integrated Logistics Support - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Integrated Logistics Support

Description:

Cargo Bed Covers. M1 Tank. M9 ACE. 2 1/2-Ton ESP Tactical Trucks. Improved Ribbon ... Bridge Erection Boat. Integrated Logistics Support (ILS) Provisioning ... – PowerPoint PPT presentation

Number of Views:1841
Avg rating:3.0/5.0
Slides: 9
Provided by: engi148
Category:

less

Transcript and Presenter's Notes

Title: Integrated Logistics Support


1
Integrated Logistics Support PROVISIONING PLM
2
Experience
Integrated Logistics Support (ILS) Provisioning
  • Built the Provisioning Master Record and
    Maintained the Provisioning Data for Sixteen
    Recent Systems

Vehicle HMMWV Interim Vehicle-Mounted Mine
Detector Cargo Bed Covers M1 Tank M9
ACE 2 1/2-Ton ESP Tactical
Trucks Improved Ribbon Bridge
(IRB) Rapidly-Emplaced Bridge (REB) Bridge
Erection Boat
3
Experience
Integrated Logistics Support (ILS) Provisioning
  • Manager with 30 Years Experience
  • Staff Averaging Twelve Years Experience
  • Established, Tested Methodology for Identifying
    Engineering Changes and Processing Provisioning
    Data in ECPs and ERRs
  • Develop Test Support Provisioning Reports and
    Part Manual publications for prototype systems

4
Electronic Delivery of Data
Integrated Logistics Support (ILS) Provisioning
  • Provisioning On-Line System (POLS)
  • Currently Update/Change HMMWV Data Using POLS
  • Personnel Investigated and Granted
    Authorization
  • PowerLOG-J Client Oracle Server-Based Software
  • LOGSA-Provided Software Used to Deliver
    Provisioning Data to TACOM in 1388-2B Format
    (67,000 plus total records in PowerLOG)
  • RPSTL text developed and deliver from PowerLOG-J
  • Data Sent Via CD-ROM and Email
  • Automated System for Screening Repair Parts
  • SAI Global LOGICOM
  • FEDLOG, LOGRUN/WebFLIS

5
Data Exchange SAP
Integrated Logistics Support (ILS) Provisioning
  • AMC inquires how powerLOG and SAP can integrate
    for examination into PLM system
  • AMC PLM community wants us to integrate powerLOG
    with PLM sys such as WindChill, SAP, etc
  • IETM integration efforts with MIL-STD-40051, GEIA
    927-1 and powerLOG, on-going

6
CAPABILITIES
Integrated Logistics Support (ILS) Provisioning
  • ELECTRONIC TECHNICAL MANUALS (ETMs)
    MIL-STD-40051
  • OPERATORS MANUALS
  • TWO-LEVEL FOUR-LEVEL MAINTENANCE MANUALS
  • REPAIR PARTS SPECIAL TOOLS LISTS (RPSTLs)
  • NATIONAL MAINTENANCE WORK REQUIREMENTS (NMWRs)
  • MODIFICATION WORK ORDERS (MWOs)
  • TECHNICAL BULLETINS
  • DIGEST ARTICLES/PS MAGAZINE ARTICLES

7
CAPABILITIES
Integrated Logistics Support (ILS) Provisioning
  • MAINTENANCE ENGINEERING
  • MAINTENANCE PLANNING (TWO-LEVEL/FOUR-LEVEL)
  • RELIABILITY-CENTERED MAINTENANCE (RCM)
  • MODIFICATION KIT DEVELOPMENT
  • MANPRINT ANALYSIS
  • BDAR
  • ISODRAW ILLUSTRATION SYSTEM WITH CAD INTERFACE TO
    DESIGN ENGINEERING

8
CAPABILITIES
Integrated Logistics Support (ILS) Provisioning
  • INTERACTIVE ELECTRONIC TECHNICAL MANUALS (IETMs)
  • Class IV and V Diagnostics with SPORT/MSD
    Interface
  • POINT-TO-POINT INTERACTIVE SCHEMATICS
Write a Comment
User Comments (0)
About PowerShow.com