Title: Oil and Gas Pipeline Construction and Pipe Repair Systems
1Greater the Pressure.Greater the Sealsm
- Oil and Gas Pipeline Construction and Pipe
Repair Systems
CONFIDENTIALITY STATEMENT This document contains
proprietary and confidential information and is
not to be distributed to any unauthorized party
or parties without written consent from Pressure
Seal Ltd.
2Company and Qualifications
Greater the PressureGreater the Sealsm
- Company
- Experienced Management Team
- Petroleum, Chemical and Construction Industries
- Pipeline and Refinery Construction Experience
- Pipeline Security Management Experience
- Pipeline / Construction Market Experience
- Europe
- Middle East
- Asia
- North America
3Oil and Gas Pipeline Construction 2009 2010
Greater the PressureGreater the Sealsm
4Welding vs. Pressure Seal System
Greater the PressureGreater the Sealsm
Slower and More Expensive
Faster and More Cost-Effective
U.S. and International Patents Pending
5Key Features and Benefits
Greater the PressureGreater the Sealsm
- Benefits
- No Welding or NDT Required
- Faster with Lower Labour Costs
- Greater Pressure Greater the Seal
- All High Pressure Gas and Crude Pipes
- Lifecycle Stress and Fatigue Analysis
- Meets All Industry Standards
- Quality and Consistency
- Meets Insurance Requirements
- Substantially Improved Join Longevity
- Environmentally Safe No leakage
- Green Environmental Contribution
- Features
- Push-fit Coupling
- Easy Bolt-in Installation
- Unique Differential Pressure Seal
- Tested to 600 BAR / 8,702 PSI
- Finite Elements Analysis (FEA)
- Meets BSI, ANSI, ASME, DNV
- ISO 9001-2000 Manufacturers
- Certified Test Results
- 25 Year Seal Life-Expectancy
- No Welding No Join Corrosion
- No Welding No Atmospheric Gases
U.S. and International Patents Pending
6Faster Construction
Greater the PressureGreater the Sealsm
- NO Pipeline Welding and NO NDT
- No Welds Lower Labour Cost
- 1 Hour per Pipe Join
- 10 Joins per Day per 3 Man Team
- 12 1/2 Days to Complete 1 Mile per Team
- NO NDT (Non-Destructive Testing)
- Immediately Test and Backfill Trench
- Pipeline Welding and NDT
- 125 Pipe Welds per Mile
- 8 to 10 Hours per Pipe Join Weld
- 1 Join per Day per 3 Man Team
- 125 Days to Complete 1 Mile
- NDT Required
- Pipeline Trench Exposed for Days
7Lower Construction Costs
Greater the PressureGreater the Sealsm
- Eliminates Requirement for Costly Pipe Welding,
Labour Equipment - NO Welding Gases, Rods and Equipment
- NO Power Generators
- NO Pollution and Safety Risks
- Eliminates Requirement for High Skilled and
Expensive - NO Pipe Fitters
- NO Certified Welders
- NO NDT (Non-Destructive Testing)
- Lower Security Risk
- NO Pipeline Exposure -Immediate Backfill of Pipe
Trench - Increases Installation Speed and Ease of Install
- Uses More Local Labour
8Environmentally Beneficial
Greater the PressureGreater the Sealsm
- Eliminates Welding Process
- No Discharge of Greenhouse Gases
- No Discharge of Toxic Gases
- No Health and Safety Hazards
- Pipe Joins with 25 Year Life
- Reduced Corrosion
- Reduced Risk of Pipe Joint Failure
- Reduced Ground Contamination Due to Leakage
9Pressure Seal Pipeline Repair System
Greater the PressureGreater the Sealsm
- In-Service Pipeline Repair System
- Permanent Interlocking High Pressure Repair Clamp
- Permanent Repair of Existing Leaking Pipelines
- Preventative Maintenance Application
- Unique Multi-combed, Frictional Lip Seal
- No Need to Shut Down Pipeline
- No Cutting or Welding
- 25 Year Seal Life
U.S. and International Patents Pending
10Applications
Greater the PressureGreater the Sealsm
- Oil Pipelines PSR Red Crude Oil Seal and
Coupling - All major pipe sizes 6 to 60 and pressures
- Special anti-corrosive 25 year seal all crude
- Gas Pipelines PSY Yellow Gas Seal and Coupling
- All major pipe sizes 6 to 60 and high pressure
lines - Specially formulated 25 year seal gas pipelines
- Water Pipelines PSB Blue Water Seal and
Coupling - All major pipe sizes 6 to 60
- 25 year seal for all water pipelines
- In-service Pipeline Repair System
- Oil, Gas, Water, Steam Pipelines
- No Shut Down Required
- Preventative Maintenance
11Testing Certification
- United Kingdom Certified Testing
- Testing Facilities Accreditation
- UK Accreditation Certificates
- Metals, Alloys, and Metal Products
- Finite Element Analysis
- Excessive Stress and Fatigue Analysis
- Determined long term stress loads
- Pressure Tested
- 600 BAR / 8,702 PSI
- 1,000 BAR / 14,504 PSI
- UK Pressure Test Certificates
- 100 BAR Pressure Test
- 200 BAR Pressure Test
- 300 BAR Pressure Test
12Industry Standards
Greater the PressureGreater the Sealsm
- Pressure Seal Couplings and Repair Kits Meets or
Exceeds - ASME B31.8-1999
- Chapter VIII
- ASME 313
- Piping design, Manufactured, Installed
- ASME B31.4
- Liquid Petroleum Transportation Piping Systems
- ASME B31.8
- Gas Transmission and Distribution Systems API
5L (44th Edition) - ISO 3183... 8. 2. 3. 12. 2
- Petroleum natural gas industries
- Steel pipe for pipelines - Technical delivery
conditions - Part 3 Pipes of requirement Class C (page 20)
- BS ISO 156492001 B7 and B8 (page 22)
- BS EN ISO 23129
- Petroleum and natural gas industries-pipeline
transportation systems. - Test procedures for mechanical connectors.
Clause 8 (page 23)
13Features Summary
Greater the PressureGreater the Sealsm
- Pressure Seal Pipe Connection and Pipe Repair
Systems - No Welds and Potential Leaks
- No Skilled Labour Force Required
- No Specialist Equipment Required
- No Toxic Greenhouse Gases
- No Pipeline Shutdown
- Reduces Labour Costs
- Reduces Equipment Costs
- Reduces Security and Piracy Risks
- Improves Pipe Join Life Expectancy to 25 Years
- Improved Environmental Safety
- In-service Weld Repair System for Leaking or
Potentially Leaking Pipe - All Pipeline Applications and Sizes from 6 to
60 Diameters
14Management Team
Greater the PressureGreater the Sealsm
- Michael Skellern
- MBA Chief Executive Officer
- Keith Wyness
- BA Honours Industrial Economics Managing
Director - Richard Ollerhead
- I.Eng.M.C.I.P.H.E., M.P Director, Engineering
Construction - Lee Cassidy
- First class Master of Engineering (MEng) with
Honours Director R D - Barry Ollerhead
- B.Eng. Mech. Eng, Chartered Member IMECHE
Project Manager - Stuart Davies
- Technical Services Manager
15Strategic Partners
Greater the PressureGreater the Sealsm
- Rosneftegazstroy RAO - RNGS International Dr.
Ivan Mazour, Chairman - Pressure Seal Pipeline Construction Partner in
Russia and CIS - 200,000 km of trunk pipelines
- 350,000 km of field gathering pipelines
- 22,000-25,000 km annual pipeline construction
- 1500 compressor and pump stations
- 45 Billion m3 Gas processing plants
- 16 Million m3 in Refineries and Tank Farms
- 500 billion m3 Gas Processing Units
16Executive Management Contacts
Greater the PressureGreater the Sealsm
Pressure Seal Ltd 100 Bayview Circle, Suite
200 Newport Beach, CA 92660 United States of
America Phone 1 949 335 5513
Pressure Seal Ltd Oaktree Court, Mill lane Ness,
Cheshire CH64 8TP United Kingdom Phone 44
0 207 993 2718
-
- WWW.PressureSealPipes.com
- Michael Skellern, CEO
- Tel 1 949 280 1393
- Tel 44 0 753 183 696
- M.Skellern_at_PressureSealPipes.com
-
- Keith Wyness, President
- Tel 44 0 776 426 1316
- K.Wyness_at_PressureSealPipes.com
-
- Richard Ollerhead, EVP
- Tel 44 0 778 964 4663
- R.Ollerhead_at_PressureSealPipes.com
-