Title: PARCEL MANAGEMENT SYSTEM


1
PARCEL MANAGEMENT SYSTEM (PMS)
2
Project PMS Implemented at 10 stations on New
Delhi- Howrah corridor
NR---New Delhi, Delhi NCR--Kanpur,
Allahabad ECR-- Gaya, Patna, Danapur, Mughalsarai
ER-Howrah,Sealdah
2
3
Main Features
  • Direct capture of parcel weight electronically
  • Universal windows for all destinations for
    booking
  • Single window for weigh-ment and cash payment
    possible
  • Advance unloading guidance about inward parcel
    from the system at destination
  • Tracking parcel with help of barcode technology
    and through SMS
  • Train Master entry along with scales by Railways

4
Booking of packages
Loading of packages
Unloading of packages
5
Benefits
  • Customer
  • Track latest status of the parcel through
    internet and SMS
  • Reduction in time required for weighment and
    booking
  • Staff
  • Automatic freight calculation based on latest
    rules
  • Reduction in human errors.
  • Railways
  • Loading generally according to priority thereby
    curtailing malpractices and complaints
  • Beneficial to Accounts for internal check
  • Reduction in Claims
  • Potential for revenue generation based on
    improvement in service.

5
6
What does PMS involve
  • Centralized servers in CRIS
  • Thin Clients/printers/switches/ups at booking
    offices
  • Thin Clients/Electronic weighment machines/
    switches/ups in godowns
  • Barcode printers at common booking window
  • Mobile Barcode scanners at platforms and inward
    godowns with GPRS connectivity

6
7
(No Transcript)
8
Modules
  • Forwarding note
  • Booking-Parcel, luggage, lease, FSLA
  • Loading-Loading guidance-Loading summary
  • Unloading-Unloading guidance, Unloading
    summary
  • Delivery
  • MIS
  • System Administration and Master maintenance
  • Bug reporting
  • Data Warehouse

9
9
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Above Barcode When read by scanner reads as
below \09921101003980001HWH 099 ? Wt of
package. 2110100398 ? PRR No 0001 ? Item No HWH
? Destination Stn
16
Handheld Mobile devices at Parcel offices over
GPRS Connectivity
  • Handheld mobile devices with barcode scanner
    facility, will be used for transmitting the PMS
    Data to the PMS server at CRIS New Delhi in
    Realtime fashion, through GPRS network. The GPRS
    network will be from service providers as
    utilised in HHT Project. Centralised server
    architecture must be used with central server at
    CRIS New Delhi and PDAs parcel stations.
  • The hardware and software requirement including
    VPN application at server and VPN clients in
    PDAs will be addressed by PMS application group.
  • The SIM required with GPRS facility for PDAs
    will be finalised from service provider by CRIS
    on behalf of Railways. However respective railway
    shall apply for SIM and funds will be made
    available by railways from revenue.

17
(No Transcript)
18
VPN Deployment View
DMZ Zone
Handheld with VPN Client on MS Windows Mobile
PMS Web Server Application server
VLAN Internal LAN
Router Packet Filter
Oracle RAC
VPN software in load balance mode(Hardware and
software to be installed by System Integrator)
PMS Load Balancer
External Storage (SAN)
Protocol Firewall
GPRS network
Domain Firewall
VLAN2
Firewall to access internet and to protect
application and persistence from internet
Firewall to protect applications and persistence
VLAN1
19
(No Transcript)
20
MODULES (contd.)
  • Tracking of parcels through online information
    of parcels on internet site www.parcel.indianrail
    .gov.in
  • Customer can track its parcel against PRR no.
    on the parcel receipt. This tracking has been
    integrated with NTES system for expected time
    of arrival at destination.

21
(No Transcript)
22
MODULES (contd.)
  • FSLA (Freight Service Ledger Account )
  • This module is for daily Registered Newspapers
    magazines to be dispatched in train by paying
    some security in advance and pays the dues at
    the end of the month. This has been enhanced
    with generation of barcode, tracking and
    delivery.

23
(No Transcript)
24
MODULES (contd.)
  • Lease
  • This module covers the Leasing of
    Parcel Space in the passengers Trains to the
    private party. Testing is being done to provide
    online facility for customer to fill loading
    manifest and request for leave through internet
  • .

24
25
(No Transcript)
26
MODULES (contd.)
  • Training
  • Audio visual help file installed at each
    terminal. This helps new user to listen and see
    how to use the modules in software.
  • Bug reporting
  • For reporting defects in software user can log
    it in this module, which can be viewed by
    software engineer at CRIS and can send the
    corresponding reply in that module itself

27
(No Transcript)
28
Data Warehouse
  • Online database holds the data only for 3 months
    after booking. Data more than 3 months old is
    sent to another database capable of holding
    voluminous data, which is called data warehouse.
  • A separate application has been made to access
    this archived data. A person can at any moment of
    time can fetch data from data-warehouse for
    various MIS reports.

29
(No Transcript)
30
30
31
(No Transcript)
32
(No Transcript)
33
JUL AUG
DLI 2892 0
NDLS 9647 0
CNB 2733 2340
ALD 2943 2760
MGS 5 969
GAYA 39 48
PNBE 0 820
DNR 0 32
HWH 23832 24668
SDAH 1034 2929
34
Implementation strategy for Roll out
  • Amount sanctioned by Railway Board Rs.115.32
    Crores
  • Phase-I
  • Corridors proposed 4
  • Stations proposed 76
  • Zones to be covered 11
  • Phase-II
  • Corridors proposed 6
  • Stations proposed 144
  • Zones to be covered 5

35
Stations proposed in Ist phase Rly-wise
  • Central Railway 9
  • East Coast Railway 10
  • North Central Railway 4
  • Northern Railway 3
  • South Central Railway 18
  • South-East Central Rly 7
  • South-Eastern Railway 8
  • Southern Railway 1
  • West Central Railway 6
  • Western Railway 10