Title: Autonomous Haulage Trucks
1Autonomous Haulage Trucks
APSC 150 Engineering Case Studies Case Study 3
Sustainable Mining Part III Automation in
Mining Lecture 3.8
- John A. Meech
- Professor and Director of CERM3
- The Centre for Environmental Research in
- Minerals, Metals, and Materials
- The University of British Columbia
- Email jameech_at_dccnet.com
2How does Automation relate to Sustainability?
- Automation
- Removes workers from positions of danger
- Improves the operating efficiency of mining
- Reduces carbon emissions (better fuel use)
- Decreases stripping ratio
- Increases recovery of the orebody
- Provides consistency and eliminates error
- Makes a mine more competitive
- Makes the work easier and more intelligent
3Is Automation Obvious?
- Mining operations are often chaotic
- Complex systems are not easy to automate
- Too many heuristic issues (environment)
- Unions dont take kindly to labour replacement
- Industry is conservative (who has done it?)
- Failure in high risk situations is unacceptable
- Who does the installation and maintenance?
- What about back-up systems?
4Equipment being Automated
- Underground digging and hauling (LHD)
- Underground communication systems
- Underground drilling
- Underground surveying
- Open Pit drilling
- Slope stability monitoring
- Truck Hauling and Dumping
5Autonomous Vehicles
- DARPA Grand and Urban Challenges
- 2004, 2005, and 2007
- Vehicles drove by themselves autonomously
6UBC Thunderbird Robotics
- Formed in 2004 to enter the DGC
- Over 450 students have participated in numerous
mobile robotic projects - DARPA Grand and Urban Challenges
7UBC Thunderbird Robotics
- Formed in 2004 to enter the DGC
- Over 450 students have participated in numerous
mobile robotic projects - DARPA Grand and Urban Challenges
- Robot Racing Competition
8UBC Thunderbird Robotics
- Formed in 2004 to enter the DGC
- Over 450 students have participated in numerous
mobile robotic projects - DARPA Grand and Urban Challenges
- Robot Racing Competition
- NASA Moon Regolith Excavator Competition
9UBC Thunderbird Robotics
- Formed in 2004 to enter the DGC
- Over 450 students have participated in numerous
mobile robotic projects - DARPA Grand and Urban Challenges
- Robot Racing Competition
- NASA Moon Regolith Excavator Competition
- Thunderbots RoboCup Soccer
10UBC Thunderbird Robotics
At the Vancouver Auto Show
- Formed in 2004 to enter the DGC
- Over 450 students have participated in numerous
mobile robotic projects - DARPA Grand and Urban Challenges
- Robot Racing Competition
- NASA Moon Regolith Excavator Competition
- Thunderbots RoboCup Soccer
- E-Beetle Electric Car
http//www.ubcecc.com/blog/
11Snowstorm
12CAT797F
13Mining Truck Accidents
14Komatsus AHS
15Open Pit Mining Costs (/t)
16Operating Cost Breakdown for CAT793
17Operating Cost Breakdown for CAT789
18Evolution of Mining Truck Capacities
19Key Components
20System Requirements
- Communication network
- Sensors for navigation and object- avoidance
- GPS system accurate to 10cm (D-GPS)
- Computer hardware on-board
- Central processing system
- Controller devices
- Supervisory Software
21GPS-based navigation
22PLM III is a payload monitoring system that gives
the operator accurate weight of payload, gross
vehicle weight, cycle times and empty vehicle
weight.
23(No Transcript)
24(No Transcript)
25Obstacle Detection System
Millimeter wave radar
System focuses only on the route. Perceivable
target a human 100 m distance
26Komatsu 930E-AT
First two units were field tested by Komatsu at
the Twin Butte mine near Tucson. Tests show no
major problems with radar and GPS navigation. The
system is also examining other equipment -
bulldozer, front-end loader and several smaller
ancillary vehicles.
27ASIs Obstacle Avoidance System
28Radomiro Tomic Mine in Chile
- Tonnage Hauled 2006 8,222,000t - 32,000 tpd for
256 days - Mechanical Availability 90.5 AHS vs. 80.2
total fleet - Effective Utilization 84.2
- Daily Haulage Time 24 x 0.905 x 0.842 18.2
hrs - - percentage
gain 25.4 - - potential to
20.5 hours - Accidents none (2 in 2007)
- Cost per tonne U.S.1.36/t gtgtgtgt U.S.0.58/t
- Maintenance Reduction 7
- Depreciation Decrease 3
- Impact on Mine Design - increased slope angle
- -
decreased road width - Significant increase in safety
29Software / Sensor Features
- Localization
- Navigation
- Obstacle Recognition
- Obstacle Avoidance
- Lane Following
(where am I?) (where do I want to go?) (what is
in the way?) (how do I avoid it?) (what is best
route?)
30Shovel-Truck Modeling
- ExtendSim software to model discrete event
processes - Probability of failures (maintenance)
- Model based on First-Principles
- Rimpull and speed
- Fuel consumption
- Fuzzy model of road conditions
- Tire wear based on empirical data
- Manual versus Autonomous operation
31Truck Operation
- The basic truck cycle considers ore/waste being
loaded at a shovel and delivered to a surface
stockpile/Crusher.
31
Http//ssabh188.blogspot.com
32Pit Layout
Dump
link5
extension
extension
link6
Waste
Ore Shovel
link1
link7
extension
link2
link4
Maintenance
Waste Shovel
Ore
Parking
link3
Crusher
Http//ssabh188.blogspot.com
33Traffic Management
- Speed limits
- 2 way traffic
- No passing
- Minimum separation between vehicles(50m)
Http//ssabh188.blogspot.com
34Batching of Resources trucks drivers
35Digging and Loading Module
- ExtendSim Blocks for Discrete-Event Modeling
36Maintenance and Delay Module
37Driver Attributes
- Work Period 14 days Shift
Duration 12 hours - Breaks Shift
Time (hr) Duration (hr) - Shift Change
0/12 0.25 - Lunch
6 0.75 - Bathroom 3 and
9 0.17 - Total
- 1.34 (11) -
- Attribute
Efficiency -
short term long term - learner 80 90
- experienced 85 95
- tired (shift start) 85 90
- tired (shift end) 80 85
- tired (start work period) 85
90 - tired (end of work period) 80
85 - time since trained (short) 85
95 - time since trained (long) 75
80 - personality (aggressive) 80 90
- personality (conservative) 85
95
In addition, variance will be higher for
negative attributes.
38Components
- Two Shovel
- Eight Trucks
- One dump area
- One Crusher
- Auxiliary equipment such as graders, dozers,
- water trucks, fuel trucks, drills and light
vehicles - Breakdown and maintenance events
Http//ssabh188.blogspot.com
39Manual AHT Model Output
-
- The model outputs Benchmarking KPIs
- Productivity
- Safety
- Breakdowns
- Cycle times
- Maintenance costs
- Labour costs
- Fuel Consumption
- Tire Wear
- Truck Costs ( annualized)
- Reduced GHGs
KPI Key Performance Index
40Rimpull vs. Speed
41Sub-Questions in the Research
Key Performance Indicators - Targets
AHS
AHS
AHS
AHS
AHS
30
8
-7
-10
-12
Manual
Manual
Manual
Manual
Manual
Investment cost per truck
Fuel consumption
Truck haulage speeds
Mechanical Availability
Tire Wear
42Sub-Questions in the Research
Key Performance Indicators - Targets
AHS
AHS
AHS
AHS
12
5
-15
-14
-80
Manual
Manual
Manual
Manual
Increased Productivity
Increased Truck life
Maintenance costs
Labour costs
Labour savings depend on current mine
circumstances union and turnover issues
43Potential Labour Savings
- Current Situation
- Drivers per truck 4 (2 on / 2 off)
- Total 55 trucks x 4 220 plus vacation subs
(20) - Drivers retrained every 6 months
- Annual turnover 40
- Annual Labour cost 36,000,000 O/H
- Annual training costs 10,000,000 O/H
- Future Situation
- No drivers and no training
- Increased maintenance personnel (3 trucks/person)
- Annual costs 48 x 150,000 7,200,000 O/H
44Potential Labour Savings
- Care must be taken when introducing automation
into a union operation - Labour replacement must be done by attrition, not
by lay-offs - Sabotage will result otherwise
- Time to implement will increase
- System may fail ultimately
45Mine Design Issues
- Steepen pit slopes to reduce stripping ratio
- Reduce haulage road width
- Select smaller trucks to increase flexibility
46Haul Road Width
- One-way straights and corners 2.5 3 widths
- Two-way traffic In straights, 3 3.5 truck
widths - Two-way traffic In corners, 3.5 4 truck
widths
47Komatsus Autonomous Haulage System
48Autonomous Solutions Applications
49ASIs Remote Dozer Control
50Fuzzy Control of an Autonomous Vehicle
51Snowbots Robot Racing 2009
52Tele-robotic Drilling Underground