Title: The Reverse Osmosis Seawater Desalination
1present
The Reverse Osmosis Seawater Desalination
CONTAINER CONCEPT
2The Energy Efficient Low Maintenance
Containerized
3Reverse Osmosis Seawater Desalination Plants
4The Containerized Solution
Containerized SWRO
5THE CONTAINER CONCEPT
- takes the expenses and mystery out of seawater
- RO Desalination and brings it DOWN-TO-EARTH
- by making pre-designed module sized plants,
- fully assembled in standard 20-ft and 40-ft
containers - and install them right where the potable water is
needed.
6THIS MEANS
No need for expensive buildings
No time consuming and costly civil works
No advanced calculations and projecting
procedures
- but reduced costs
- due to an extremely short installation,
commissioning and training schedule of
only 1 week compared to a 3-4 month
installation time for a
conventional NON containerized plant.
7Its all there
inside the container, fully tested before
shipping, ready to produce high-quality potable
water within days of delivery.
All what the clients need to do is to arrange for
the Seawater supply and the Electricity, and a
foundation for the container
8The Container Concept includes
for clean seawater from beach well
for seawater requiring pre filtration
250m³/day One (1) 20-ft container
250m³/day One (1) 40-ft container
300m³/day One (1) 20-ft container
300m³/day One (1) 40-ft container
500m³/day One (1) 40-ft container
500m³/day Two (2) 40-ft containers
1000m³/day One (1) 40-ft container
1000m³/day Two (2) 40-ft containers
- and as the example on the following page
9A 300 m³/day plant like this!
Installed in a 20-ft container
Produce all the potable water requirements for
this resort
10Installation Procedure
The following is a presentation of the
installation of a HOH Standard Containerized
SWRO Desalination Plant, with a capacity of
300m³/day, producing potable water with a TDS
of less than 500 ppm, as recommended by the
WHO (World Health Organization). The feed water
source is clean seawater from a seawater well
with a TDS of 36,000 ppm.
11The Playa Roca Resort, Lanzarote, Canary Islands,
Spain where the installation took place - Aug.11,
2003
12Installation site prepared by local contractor
with power supply and connection pipes to feed
water well, product water reservoir and brine
disposal injection well.
13The 300 m³/day plant fully assembled in 20-ft
container arrives at Resort at 800 AM
14A local crane contractor prepare to remove the
containerized plant from the truck - 815 AM
15Crane contractor moving the containerized plant
from the truck towards it's permanent location
900AM
16Plant at installation site 915 AM
17- and lowered into position 925 AM
18Containerized plant at permanent location - 950
AM
19- ready for the HOH technician to commission and
to perform training of the local operator and
maintenance technicians
20Close-up view of the plant with a capacity of 300
m³/day producing high quality potable water at
0.70/m³
21 Inside view of 250 m³/day
containerized plant installed at another Island
Resort
22Inside view of 300 m³/day containerized plant
installed at International Hotel Beach Resort,
Spain
23Thank you for viewing this presentation of the
HOH Container Concept - and our Containerized
SWRO Plants For additional information, please
visit our website
www.HOHUSA.net
Contact
Phone 706 694 8869 Facsimile 706 694 4124 -
Email info_at_HOHUSA.net
Gunnar A. Axelsen,
President
24Containerized
Reverse Osmosis
Seawater Desalination