Title: Gas Lift Optimization Process
1MALAYSIA
2003 ASME/API GAS-LIFT WORKSHOP Kuala Lumpur,
Malaysia
Gas Lift Optimization Process
By Zaidah Ibrahim Operations Manager ExxonMobil
Exploration and Production Malaysia Inc.
2Major Effort Required to Meet Global Energy Demand
Oil and Gas Demand
New Production
Million Barrels Per Day Oil Equivalent ( MBOE )
Existing Production
1980 1990 2000 2010
- Half of required 2010 supply not yet on-stream
- estimated industry investment exceeds 1
trillion - Continued focus to enhance production from
existing - facilities is just as important
3Focus on Gas Lift
- Gas Lift has been and will continue to be a large
part of our business - The majority of our artificially lifted
production is gas lifted - Current production requires routine surveillance
and analysis to hold the gains made from
optimization - Future projects require gas lift as a means of
artificial lift . Processes must be transferred
to new Production Teams - Industry demographics and turnover require
ongoing gas lift training to sustain awareness
and competency - New gas lift technologies must be sought and
leveraged where appropriate
4ExxonMobil Gas Lift Production
2002 EM Gross Operated Oil Production
Gas Lift
27
Rod Pump
11
Other
Progressive
21
Cavity Pump
6
Naturally
Electric
Other
Flowing
Submersible
2
52
Pump
2
27 of EM gross operated oil production is gas
lifted
5Optimization is a Continuous Process
GL Gas Quality
Surface/ Subsurface Equipment
GLV Design and Installation
OPTIMUM GAS LIFT PRODUCTION
Production Monitoring Surveillance Troubleshooting
Analysis / Redesign
Metering system
Competent Operators
Optimization
6Gas Lift Best Practices
- Optimization efforts typically result in 5 or
more increases in field production. - Typically, the gains went away after a period of
time. There is a need for sustained focus on gas
lift surveillance and optimization to hold the
gains - EM developed Gas Lift Best Practices from
worldwide experiences
Optimization
Training
Organization
Gas Lift Best Practices
Surveillance
Design
Equipment
7Gas Lift Key Performance Indicators
Integrated effort to maximize asset performance .
. .
- Backlog of new GLV installations
- Backlog of GLV change- outs
Idle Capacity
- Compressor availability/ capacity
- Water handling capacity
- Well downtime
VolumetricDowntime
- Number of Active Completions
- Gas Lift Oil and Liquid Production
- Total Gas Liquid Ratio
- Gas Lift Consumed
- Well Test compliance
Actual Production
8Continuous Monitoring ---gt Ensure Optimum
Production
Gas Lift Monitoring / Metering System (GLMS) -
Real time data acquisition for Gas Lift
surveillance
Constant Gas Lift Gas
Constant and high Gas Lift Gas Supply
Constant Casing Pressure
Low and Constant Tubing Pressure
9ExxonMobils Gas Lift Forward Plan
- Continue to improve Gas Lift Best Practices -
document proven examples that others can leverage
from
- Network and promote interactions to improve each
Production Units gas lift efficiencies
- Seek out and transfer new technology, and where
applicable, use it to improve gas lift processes
and performance