Pumped storage hydro power plant CIERNY VH PSP - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Pumped storage hydro power plant CIERNY VH PSP

Description:

Pumped storage hydro power plant CIERNY V H (PSP) Responsible for ... Air conducting lines 400kV from PSP Into the electrical splitter of Liptovsk Mara ... – PowerPoint PPT presentation

Number of Views:1725
Avg rating:5.0/5.0
Slides: 17
Provided by: ondrej3
Category:
Tags: cierny | psp | hydro | mara | plant | power | pumped | storage

less

Transcript and Presenter's Notes

Title: Pumped storage hydro power plant CIERNY VH PSP


1
  • Pumped storage hydro power plant CIERNY VÁH (PSP)
  • Responsible for presentation and excursion
  • Ing. Pavol Moji

2
Index
  • - choosing of localization, establishing
    milestones of PSP
  • - description of structural part of PSP
  • - description of the mechanical part of PSP-
    description of the electrical part of PSP
  • - positioning, operating, controlling, using of
    the PSP
  • - reparation of the technological and building
    parts of PSP
  • - ecological aspects of PSP

3
Choosing of locality, the main points of building
PSP
  • Localization the part of the Nízke Tatry
    National park in the Turková National Natural
    Reservation

4
Choosing of localization, establishing milestones
of PSP
  • PSP has been put into use 1981-1982
  • During the period of constructing (also each of
    the operations) the following conditions had to
    be fulfilled
  • - Strict governmental regulations regarding the
    environment protection
  • - reducing the period of construction
  • - changing of the shape of the upper reservoir
    and its inclusion in nature
  • - damaging the forest vegetation
  • - dissociation between construction of flats and
    social units
  • - underground positioning of the conducts
  • - minimum use of ground
  • PSP tasks
  • - keeping the quality standards when providing
    electrical energy
  • - covering of the changes in the charge of the
    electric network
  • - operative covering of the quick changes in the
    electric network
  • - fulfilling of the regulation functions of the
    electric network

5
Description of the construction part of the PSP
  • All the work is divided into four part
  • 1, The upper reservoir
  • 2, Underground conducts
  • 3, The hydro power plant and the lower reservoir
  • 4, Geological anomaly

6
Description of the construction part of the PSP
  • The upper reservoir
  • - artificial, without own the natural water
    inflow
  • - bottom of the reservoir are sealed by a
    bituminous and cement coat
  • - in perimeter is a tunnel for leakage water
    controlling
  • - operation levels fluctuate by 25m (1.160 and
    1.135m)
  • Underground conducts and the communication tunnel
  • - Count of conducts 3, diameter 3,8m
  • - Conducts are finished in a spherical
    distributor branching out the conduct into two
    turbines and two pumps
  • - Every conduct has 3 parts a) two horizontal
    part b) inclination part with inclination 45O

7
Description of the construction part of PSP
  • The hydro power plant
  • - Installed power 6x111,6MW, in case of turbine
    overflow 6x122,4MW
  • - Working time 5,5h
  • - TG1-TG6 - 6 vertical aggregates in 3 steps 1,
    the motor-generátor
  • 2, the turbine
  • 3, the pump
  • turbines of Francis type with internal diameter
    2600mm
  • - TG7 1 turbine of the type Kaplan 0,8 MW for
    the natural flow of the river Cierny Váh
  • The lower reservoir
  • Made of concrete, gravitational
  • lateral walls geotextile Taratex with stones
  • - Total volume of the reservoir 3,7mil. M3
  • - Iregularitiy of the water surface7,45m

8
Description of the mechanical part of PSP
9
Description of the electrotechnical part of the
PSP
  • - motor-generator
  • n500ot./min.
  • 2p12
  • - Switching station 15,75kV
  • - Outputs tunel

10
Description of the electrical part of PSP
  • - Block transformer with 3 windings 15,75kV/
    15,75kV/ 420kV
  • - Switching station 400kV
  • - Air conducting lines 400kV from PSP Into the
    electrical splitter of Liptovská Mara
  • - Energy for the own use
  • TG7 (Kaplan turbine, 0,8MW)
  • 22kV lines

11
Popis elektrotechnickej casti PVE
12
Operating, control, and use of PSP
  • Operating effectiveness of the whole cycle
    74,5
  • Control accomplishing of a fully automated, PSP
    is directly controlled by production department
    in Bratislava
  • Operational implementation starting from zero
    position up full power
  • a, during the generator phase 70sec.
  • b, during the motor phase 120sec.

13
Positioning, operation, control, use of the PSP
  • Outsourcing
  • - Tertiary regulations
  • - Secondary regulations
  • - Black start
  • Dynamic functions
  • - Regulation of the unexpected changes of the
    charge
  • - Immediate covering of the daily charge diagram

14
Reparation of the mechanical and structural part
of the PSP
  • General reparations TG
  • - Re-insulation of the upper reservoir
  • - Splitter (insulator)

15
Ecological aspects of PSP
  • Te process of constructing
  • - Cleaning of the waters coming from the machines
  • - Cleaning of the waters coming from the block
    transformators
  • - Changing of MTP, MTN, SF6-disconnectors
    (400kV),
  • - Changing of the vacuum power disconnectors
    (22kV)
  • - Removing of the compression stations
  • - TG7

16
  • Thanks for attention