Title: Pumped storage hydro power plant CIERNY VH PSP
1- Pumped storage hydro power plant CIERNY VÁH (PSP)
- Responsible for presentation and excursion
- Ing. Pavol Moji
2Index
- - choosing of localization, establishing
milestones of PSP - - description of structural part of PSP
- - description of the mechanical part of PSP-
description of the electrical part of PSP - - positioning, operating, controlling, using of
the PSP - - reparation of the technological and building
parts of PSP - - ecological aspects of PSP
3Choosing of locality, the main points of building
PSP
- Localization the part of the Nízke Tatry
National park in the Turková National Natural
Reservation
4Choosing of localization, establishing milestones
of PSP
- PSP has been put into use 1981-1982
- During the period of constructing (also each of
the operations) the following conditions had to
be fulfilled - - Strict governmental regulations regarding the
environment protection - - reducing the period of construction
- - changing of the shape of the upper reservoir
and its inclusion in nature - - damaging the forest vegetation
- - dissociation between construction of flats and
social units - - underground positioning of the conducts
- - minimum use of ground
- PSP tasks
- - keeping the quality standards when providing
electrical energy - - covering of the changes in the charge of the
electric network - - operative covering of the quick changes in the
electric network - - fulfilling of the regulation functions of the
electric network
5Description of the construction part of the PSP
- All the work is divided into four part
- 1, The upper reservoir
- 2, Underground conducts
- 3, The hydro power plant and the lower reservoir
- 4, Geological anomaly
6Description of the construction part of the PSP
- The upper reservoir
- - artificial, without own the natural water
inflow - - bottom of the reservoir are sealed by a
bituminous and cement coat - - in perimeter is a tunnel for leakage water
controlling - - operation levels fluctuate by 25m (1.160 and
1.135m) - Underground conducts and the communication tunnel
- - Count of conducts 3, diameter 3,8m
- - Conducts are finished in a spherical
distributor branching out the conduct into two
turbines and two pumps - - Every conduct has 3 parts a) two horizontal
part b) inclination part with inclination 45O
7Description of the construction part of PSP
- The hydro power plant
- - Installed power 6x111,6MW, in case of turbine
overflow 6x122,4MW - - Working time 5,5h
- - TG1-TG6 - 6 vertical aggregates in 3 steps 1,
the motor-generátor - 2, the turbine
- 3, the pump
- turbines of Francis type with internal diameter
2600mm - - TG7 1 turbine of the type Kaplan 0,8 MW for
the natural flow of the river Cierny Váh - The lower reservoir
- Made of concrete, gravitational
- lateral walls geotextile Taratex with stones
- - Total volume of the reservoir 3,7mil. M3
- - Iregularitiy of the water surface7,45m
8Description of the mechanical part of PSP
9Description of the electrotechnical part of the
PSP
- - motor-generator
- n500ot./min.
- 2p12
- - Switching station 15,75kV
- - Outputs tunel
10Description of the electrical part of PSP
- - Block transformer with 3 windings 15,75kV/
15,75kV/ 420kV - - Switching station 400kV
- - Air conducting lines 400kV from PSP Into the
electrical splitter of Liptovská Mara - - Energy for the own use
- TG7 (Kaplan turbine, 0,8MW)
- 22kV lines
11Popis elektrotechnickej casti PVE
12Operating, control, and use of PSP
- Operating effectiveness of the whole cycle
74,5 - Control accomplishing of a fully automated, PSP
is directly controlled by production department
in Bratislava - Operational implementation starting from zero
position up full power - a, during the generator phase 70sec.
- b, during the motor phase 120sec.
13Positioning, operation, control, use of the PSP
- Outsourcing
- - Tertiary regulations
- - Secondary regulations
- - Black start
- Dynamic functions
- - Regulation of the unexpected changes of the
charge - - Immediate covering of the daily charge diagram
14Reparation of the mechanical and structural part
of the PSP
- General reparations TG
- - Re-insulation of the upper reservoir
- - Splitter (insulator)
15Ecological aspects of PSP
- Te process of constructing
- - Cleaning of the waters coming from the machines
- - Cleaning of the waters coming from the block
transformators - - Changing of MTP, MTN, SF6-disconnectors
(400kV), - - Changing of the vacuum power disconnectors
(22kV) - - Removing of the compression stations
- - TG7
16