Title: TELECOMMUNICATIONS PROJECTS
1- TELECOMMUNICATIONS PROJECTS
2Over the past years, Nour Communications has
entered into various contracts in major
telecommunications projects with well-known
industry players such as Lucent Technologies,
Ericsson, Motorola, Nokia, Harris Farinon, and
the Saudi Telecommunications Company
(STC). The general overview of the scopes of
work of these contracts and their brief
descriptions are presented hereon. This
manifestation fortifies NOUR Communications
position as an experienced and dependable
contracting company in telecommunications
industry for both commercial and government
endeavors. This string of projects is brought
about by the cohesive teamwork of Nours
innovative management and skilled work force as
its most important resources.
3- COMPANIES THAT ENGAGED AND CONTRACTED
- NOUR IN VARIOUS TELECOMMUNICATIONS
- PROJECTS IN SAUDI ARABIA
-
- Company Project
- Lucent Technologies TEP 6 Project
- L.M. Ericsson GSM E4, E5 and E6 Projects
- NOKIA GSM E5 and E6 Projects
- Saudi Telecom (STC) GSM E5 and CI Projects
- Motorola PSD Project
- Harris Farinon GID and PSD Projects
4- SOPHISTICATED TEST EQUIPMENTS
-
- Nour Communications has always utilized the
state-of-the-art tools and test equipments to
ensure optimum system performance. From survey to
integration, the wide range of equipments assists
in improvement of work quality - Differential GPS Unit with accuracy of 3m
horizontally and less than 1m vertically in
resolution of coordinates and elevation. - SDH Analyzer Set for STM-1 systems.
- c) 2 Mb/s BER Tester for E1 and T1 interface
stability and performance assessment.
5- SOPHISTICATED TEST EQUIPMENTS continued
-
-
- d) TEMS Pocket for GSM Base Station testing and
detection of cross feeders. - e) Site Master for locating fault in feeders
and VSWR testing. - MW Test Set (MTS) for checking of MW O/P power,
received signal level and frequency measurement. - IFR for FM and VHF / UHF systems testing.
- h) Set of Spectrum Analyzers and Oscilloscopes as
well as set of tools enough for use of 20
qualified installation teams for rapid deployment
around the Kingdom.
6- A) Lucent Technologies International, Inc. / ATT
Intl. - TEP6 Project From June 1996 to September 2000.
Project managed by Lucent Technologies
Norconsult was project consultant. Contracts
for - 1. SITE SURVEY
- Nour was the only survey contractor of Lucent on
its Kingdom wide GSM 200K, 300K and 500K
projects. - Total Number of Surveyed Sites in TEP6 1, 183
Sites - Provided with Microwave line of sight (LOS) data
between prospective GSM locations recorded any
path obstructions and measured site elevation
(AMSL) using Altimeter and Differential GPS.
7- Lucent Technologies continued (TEP6 Site Survey)
- Ensured that site location was suitable, both
demographic and geographic, for effective GSM
propagation and coverage. - Using state-of-the-art GPS set, recorded the site
geographical coordinates. Special software and
compass to get site magnetic bearings and other
required path data. - Using the Spectrum Analyzer set, ensured there
was no possible interference or signal
propagation to affect the designated GSM and MW
frequency bands. - GSM survey was based on the mobile coverage RF
and MW objectives taking up to 3 candidate
locations per site. -
8- Lucent Technologies continued (TEP6)
-
- 2. SKILLED MANPOWER SUPPLY
- Supplied Lucent with 21 Teams of Transmission
Engineers for Testing Commissioning of GSM
transmission network using different PDH and SDH
equipment such as ATT Pcom, Harris MicroStar,
and NERA STM 1 microwave radio sets. - Supplied Lucent with 33 Teams of Antenna
Installers / Riggers, under Lucents disposal and
direct supervision, to install GSM antennas and
MW dishes of different sizes, including varied
sizes of feeders, transmission cables, wave
guides, jumpers, clamps, and related antenna
accessories. -
9- Lucent Technologies continued (TEP6)
-
- 3. JUNCTION NETWORK
- Transmission Contract (April 1998 Nov. 2000).
Direct contract with Lucent Technologies. - Completed Sites 146 Sites
- The Contract called for implementation of
- Site survey of 146 MW sites Line-of-site (LOS)
survey of - 64 MW hops.
- Complete design and optimization of MW hops
documentation of design and Method of Procedures
(MOP) prior to site installation.
10- Lucent Technologies continued (TEP6 Junction
Network) -
- Indoor installation on 146 sites using NERA SDH
STM1 MW Radio with Frequency Diversity 16 hops
with Space Diversity. - Outdoor Installation on 146 sites different
sizes of cross-polarized MW dishes and wave
guides. - Hop alignment, equipment testing and
commissioning prior to site integration into the
long-haul MW network.
11- B) L.M. Ericsson
- GSM E4 From March 2000 to December 2001.
Direct contract to Ericsson project managed by
Ericsson project consultant was Norconsult.
Contracts for implementation of - 1. SITE SURVEY / RADIO SITE INVESTIGATION
- Total Number of Surveyed Sites 755 Sites
- Site Search/Acquisition Survey. Survey of up to
3 candidate locations of a prospective new GSM
Cell Site giving emphasis on RF and LOS
considerations. - Change-out Site Survey. To determine the
required transmission installation and Civil
Works for a change out of GSM radio equipment,
according to on-site Ericsson instructions,
prioritizing the re-use of existing equipment for
transmission, DC power and battery back up.
12- L.M. Ericsson continued (GSM E4 Site Survey)
-
- Radio Site Investigation.
- Documentation of both existing and planned radio
facilities based on RSI checklist, floor plan,
cable tray, and site lay out drawings, and
detailed photographs of site and equipments. - Transmission Survey.
- Comprehensive transmission equipment survey
conducted on MSC and existing Microwave Sites
that were serving as Node Sites in the GSM mobile
communications network.
13- L.M. Ericsson continued (GSM E4)
-
- 2. RADIO INSTALLATION RBS and Transmission.
- Total Number of Completed Sites 241 Sites
- Contract entailed the following scope of work
- Change out of Lucent BTS 2000 equipment with
Ericsson RBS 2202 cabinets with TRX radio units
and associated elements. - Replacements and cut over of GSM antennas to
effectively provide cellular communications in
the 900 and 1800 MHz bands. - Replacements of LDF series feeders, jumpers,
cable clamps, and other related antenna
accessories.
14- L.M. Ericsson continued (GSM E4 Radio
Installation) -
- Installation of Transmission Microwave Equipment
cabinet including cablings. - Installation of Mini-Link TMR 9202 both indoor
and outdoor units. - Installation of microwave antenna dish and
coaxial cable RG-8. - Alignment of MW hop and 24-hour BER burn test to
ensure optimum signal gain. - Installation of batteries and rectifier units
(Battery Back Up). - Cable connections and terminations both outside
and inside shelter.
15- L.M. Ericsson continued (GSM E4)
-
- 3. SITE CIVIL WORK CONSTRUCTION.
- Total Number of Completed Sites 243 Sites
- MSC / Indoor Room Site survey for civil
engineering site design construction and
installation of raised floor system, FM200 gas
flooding system, coded security access system,
cable tray system, other civil, electrical and
mechanical works including HVAC fire alarm and
detection control, and lighting fixtures
structural steel materials and electrical
conduits. - New Green Field Site Surveys for site
acquisition and civil engineering complete site
design excavation backfill supply and
installation of equipment and generator shelters
self-support steel tower erection and painting
supply and install gantry between tower and
shelter chain link fence ship and install power
generator other civil, electrical and mechanical
works like HVAC, lightings, etc.
16- L.M. Ericsson continued (GSM E4 Civil Work )
-
- New Roof Top Site Site survey for civil
engineering site design civil construction and
installation of equipment shelter (3m x 3m) with
foundation, cable tray system, antenna support,
structural steel works including mast, electrical
circuits and lighting fixtures and site cleaning
and preparation. - Change Out / TRU Expansion Site Detailed site
surveys site design existing building analysis
dismantling of Lucent BTS equipment installation
of new antenna mounts, shelter erection with
foundation and other civil and electromechanical
requirements.
17- L.M. Ericsson
- GSM E5 From August 2001 up to present.
Direct contract to STC Project supervised by
Ericsson project consultant is Norconsult
Telematics. Contracts for implementation of - 1. SITE SURVEY
- Total Number of Surveyed GSME5 Sites 530 Sites
- Site Search/Acquisition Survey. Survey of up to
3 candidate locations of a prospective new GSM
Cell Site giving emphasis on RF and LOS
considerations.
18- L.M. Ericsson continued ( GSM E5 Survey)
-
- Change-out Site Survey.
- To determine the required transmission
installation and Civil Works for a change out of
GSM radio equipment, according to on-site
Ericsson instructions, prioritizing the re-use of
existing equipment for transmission, DC power and
battery back up. - Site Survey for Civil Engineering.
- Detailed survey of existing sites for equipment
upgrade building or tower analysis (comparative
study) for loading capacity survey includes
electromechanical considerations of increased
load capacity due to planned additional equipment.
19- L.M. Ericsson continued (GSM E5)
-
- 2. SITE CIVIL WORK CONSTRUCTION.
- Total Number of Completed Sites 286 Sites
- MSC / Indoor Room Site survey for civil
engineering civil design FDED preparation
construction and installation of raised floor
system, FM200 gas flooding system, coded security
access system, cable tray trunk system, other
civil, electrical and mechanical works including
HVAC fire alarm and detection control, and
lighting fixtures structural steel materials and
electrical conduits. - New Green Field Site Surveys for site
acquisition and civil engineering civil design
FDED preparation excavation backfill supply
and installation of equipment and generator
shelters self-support steel tower erection and
painting supply and install gantry between tower
and shelter chain link fence install power
generator other civil, and electromechanical
works like HVAC, lightings, etc.
20- L.M. Ericsson continued (GSM E5 Civil Work )
-
- New Roof Top Site Site survey for civil
engineering civil design FDED preparation civil
construction and installation of equipment
shelter (3m x 3m) with foundation, cable tray
system, antenna support, structural steel works
including mast, electrical circuits and lighting
fixtures and site cleaning and preparation. - Change Out / TRU Expansion Site Site survey for
civil engineering civil design FDED preparation
existing building analysis dismantling of Lucent
BTS equipment installation of new antenna mounts
and cable ladder, shelter erection with
foundation and other civil and electromechanical
requirements.
21- L.M. Ericsson continued (GSM E5)
-
- 3. SUPPLY OF COMPLETE EQUIPMENT SHELTER.
- Total Number of Shelters Delivered 187
Shelters - Inside shelter installation of required
equipments and accessories meeting the approved
standards set by STC for GSM environment. - Completed shelters are being shipped from Nour
Warehouse to the assigned GSM Cell Site. - Inside shelter installation includes the
following - HVAC units, MDB panel, Halon / Fire Alarm Panel
set, Security Access Control Panel set, battery
rack and rectifier units, Tower Obstruction Light
Control (TOLCO), cable and trunk ladder, door
closer, required cablings, and inside / outside
lighting fixtures.
22- L.M. Ericsson continued (GSM E5)
-
- 4. SUPPLY OF CONTAINERIZED DUAL DIESEL
- GENERATOR
- Total Number of GSM Sites Installed with D.
Generators 89 Sites - Nour is the sole agent in Saudi Arabia of
Germanys SAB containerized dual generator. To
date, 100 sets have been sold and 89 sets
installed on GSM Sites not serviced by commercial
power. Deutz is engine make of the 3-phase,
32.5KVA, 26 KW generator. - As STC approved power generator for GSM sites, it
is installed together with accessories within a
30-foot box container providing a noise level of
65dB at 10 meter distance. - Accessories provided with the generators control
panel, starter batteries, FM200 fire
extinguishing system, 220V and 24VDC lights,
ventilation, fuel day tank and buried fuel bulk
tank.
23- C) NOKIA
- GSM E5 Project From September 2001 up to
present. Direct contract to Nokia project
managed by Nokia project consultant is
Norconsult Telematics. Contract for
implementation of - GSM AND TRANSMISSION RADIO INSTALLATION
- Total Number of Completed GSME5 Sites 204
Sites - Implementation planning based on site specific
and network configurations radio site
investigation survey. - Change out of Lucent BTS equipment with new Nokia
Macro UltraSite or Micro MetroSite GSM 900/1800
MHz radio including antennas, feeders and
jumpers and battery back up unit.
24- NOKIA continued (GSME5 Radio Installation)
-
- Installation, testing and commissioning of
transmission radio Nokia FlexiHopper or
MetroHopper, and associated MW antenna. - Testing, commissioning and integration of all
installed equipments. - GSM E6 Project Project has just started
January 2003 calling for approximately 130 sites
allocated to Nour for complete radio
installation. - Contract entails the same scope of work as that
of GSME5 Project.
25- D) Saudi Telecommunications Company (STC)
- GSM RV / CI Project (Ph I Ph II) From
July 2001 up to present. Direct contract to STC
Norconsult Telematics is project consultant. - SITE CONSTRUCTION (Civil Work and Telecom)
- Total Number of Completed CI GSM Sites 73
Sites -
- Contract is for Nour to construct and deliver to
STC brand new GSM Cell sites, located along roads
and villages in the Western Region, on a turn-key
basis. Complete site construction requires both
telecom and civil works scope of work as briefly
described below - Civil Work Implementation
- Site acquisition survey of up to 3 candidates per
site - Civil engineering survey and site design (FDED)
documentation.
26- Saudi Telecom (STC) continued (CI Project)
-
- Site acquisition survey of up to 3 candidates per
site. - Civil engineering survey and site design (FDED)
documentation. - Site preparation, excavation and backfill,
foundation preparation. - Erection of steel tower and equipment shelter.
- Supply, delivery and installation of Dual
Generators and fuel tanks. - Complete civil and electromechanical works such
as gantry and cable tray system, antenna mounts,
HVAC system, cable trenches, chain link fence,
lighting fixtures, tower painting, concreting,
and other works.
27- Saudi Telecom (STC) continued (CI Project)
- Telecommunications Implementation
-
- Complete BTS 2000 equipment installation
including RF accessories like TRX radio units,
DDF, GSM 900 MHz antennas and feeders, internal
and external cablings reconditioning of indoor
BTS units. - Installation of MW transmission equipment using
Harris MicroStar M7 or ATT Pcom radio units
installation of MW antenna dishes up to 2.4m
diameter and IF cable RG-8 hop alignment and BER
burn test to ensure link stability. - Installation of battery back up DC supply,
batteries and rectifier units. - Testing and commissioning of all installed
equipments. - Power up and Integration of site into the GSM
network.
28- E) Motorola / NASCO
- Public Security Directorate (PSD) Transmission
Project - From October 1998 to December 1999. Direct
contract with Motorola and NASCO. -
- Total Number of Completed Sites 21 Sites
-
- Contract called for Installation of transmission
equipment on - 21 PSD Sites located in Makkah, Jeddah and Taif.
- MW radio used was Alcatel PDH T1 American
Standard - Installation of PSD Monitoring System.
- Transmission documentation of the 21 completed
sites.
29- F) Harris Farinon
- GID Transmission Project
- Direct contract with Harris Farinon for
implementation of - Transmission network installation using SDH 4T1
QuadraLink MW radio in the Western Region - Installation of Omniplex Multiplexer for PTT Line
Combining on Hand Held and Mobile Radios - Installation of complete Network Management
System for the whole West District over RS-232
modems in Taif and Jeddah. - PSD Transmission Project
- Direct contract with Harris Farinon for
implementation of - Setting up of Transmission Network and its
Network Management System five (5) sites in
Riyadh and three (3) sites in Madinah.
30SITE SURVEY RADIO SITE INVESTIGATION
31 CIVIL WORK SITE IMPLEMENTATION
32RADIO INSTALLATION ERICSSON RBS TRANSMISSION
RADIO
33 RADIO INSTALLATION STC BTS NOKIA RBS
AND TRANSMISSION RADIO
34 DUAL DIESEL GENERATORS INSTALLED ON GSM SITES
35END OF PRESENTATION