Title: Fiber Optic Transmitter


1
Fiber Optic Transmitter
  • Electrical Department

2
Performance Against Goals
  • Goal To assemble and build a working Fiber Optic
    Transmitter.
  • To work as a team.
  • Complete assigned activitys on schedule.
  • Actual performance towards goal
  • With team work the assigned activitys were
    successfully completed and turned in on schedule.

3
Key activitys to be completed
  • The Fiber Optic Transmitter Project took 15 weeks
    to complete.
  • Each week a different activity was assigned to be
    completed.
  • Each team member would contribute to the
    completion of that weeks activity.

4
Key Milestones
  • Week One
  • Introduction to PCB Layout
  • Class discussed software choices for project (
    Smart works or CAD)
  • Week Two
  • Assigned Teams and project
  • Selected Team Members Eric Vega, Dana
    Roscoe, Bill Leinauer, Derek Beck

5
Key Milestones
  • Week Three
  • Introduction to PC Layout 23000.
  • Using Smart works to complete this activity.
  • Familiarize ourselves with the software.
  • Breadboard transmitter

6
Activity 23000
7
Key Milestones
  • Week Four, Five and Six.
  • Hand draw schematic wiring diagram on .2 grid
    paper
  • Compare each team members schematics.
  • Least jumpers
  • Size of proposed PC board.
  • Location of components.
  • Redraw selected and improved design on Electronic
    Workbench.

8
Activity 23005
9
Activity 23007
10
Key Milestones
  • Week Seven
  • PCB Layout on Smart works
  • 2X Plot on B size vellum

11
Activity 23012
12
Key Milestones
  • Week Eight ( A critical part of project)
  • Compare Electronic Workbench schematic to
    completed smart work schematic.
  • Check for right chips, designators, leads and
    proper wiring.
  • Color each connection with different colors to
    ensure correct connections.

13
Activity 23020
14
Key milestones
  • Week Nine
  • After making sure all connections are correct,
    duplicate schematic onto smart works.
  • Plot actual schematic on Mylar.
  • Mylar will be used to etch PC board.

15
Activity 23025
16
Key Milestones
  • Week Ten
  • Use Excel to make a parts list
  • Must include all required materials .
  • Reference designators, part and description,
    quantity,identification number, value, tolerance
    and ratings.

17
Key Milestones
  • Week 11
  • Complete a drill plan.
  • Use Excel to designate a symbol for each drill
    size.
  • List the amount of holes needed for each drill
    size.
  • Indicate location on smart work diagram.

18
Activity 23030
19
Key Milestones
  • Week 12
  • Etch board
  • Drill pads
  • Decide type of enclosure for project

20
Etching The Board
21
Key Milestones
  • Week 13
  • Soldering devices and jumpers.

22
Key Milestones
  • Week 14
  • Troubleshooting and final checks

23
Finished Product
  • Fiber Optic Transmitter
  • Receives parallel data from prolog and sends it
    over fiber in a serial form to the receiver.
  • By using fiber the transmit rate is limited by
    the devices at both ends.

24