Project Staff: Bob Lundell, PE, Project Manager. Gary Walklin, PE, Project Engineer ... Contractor: Alaska Road Builders. Eric Uppick with Wirtgen Group ... – PowerPoint PPT presentation

Number of Views:176
Avg rating:3.0/5.0
Slides: 23
Provided by: JJRa
Learn more at: https://dot.alaska.gov
Category:

less

Transcript and Presenter's Notes

Title: Introduction%20to%20Foamed%20Asphalt


1
Introduction to Foamed Asphalt
2
How is Foamed Asphalt Produced?
  • Source material for foamed asphalt is ordinary
    hot asphalt cement (AC-5 or PG 52-28).
  • Foam is produced using hot asphalt with a
    temperature between 325 to 340 F and a
    precisely defined amount of water (2.5 by weight
    of asphalt).
  • When the water comes in contact with the hot
    asphalt it evaporates explosively, causing the
    asphalt to Foam.
  • The asphalt expands up to 15 of its original
    volume.
  • When foamed, the asphalt has a very large surface
    area making it ideal for mixing with aggregates.

3
Expansion Chamber
  • Cold water and air are injected simultaneously
    into the hot asphalt.
  • The hot asphalt foams explosively and shoots down
    into the mixing chamber.

4
Mixing Chamber Diagram
Hot Asphalt
Water For Foam Generation
Compaction Water
5
Foamed Asphalt Recycled Material

6
3 Asphalt Binder by Weight of Recycled Material
7
Foamed Asphalt Work Done in Alaska
  • Kenai Peninsula Paving Program 2001
  • East Hill Road and West Hill Road, Homer
  • Project Staff Bob Lundell, PE, Project Manager
  • Gary Walklin, PE, Project Engineer
  • Paul Dougherty, Grade Inspector
  • Contractor Alaska Road Builders
  • Eric Uppick with Wirtgen Group

8
Project Location Homer, Alaska
9

Mix Design
  • Mix design was done by Wirtgen and Loudon
    Partners
  • East Hill Road 2.5 0.3 Foamed Asphalt and
  • 1 Portland cement by mass of material
  • West Hill Road 3.0 0.3 Foamed Asphalt and
  • 1 Portland cement by mass of material
  • 1 Portland cement was added to increase the
    percentage passing the No. 200 sieve, which is
    critical for proper dispersion of the foamed
    asphalt.

10
Mix Design
  • Fines are critical for proper dispersion of the
    foamed asphalt.

11
(No Transcript)
12
(No Transcript)
13
Wirtgen WR 2500
14
Compaction Water
Hot Asphalt
15
Initial Compaction
16
Initial Compaction and Grading
17
Final Grading and Compaction
18
Final Compaction
19
One Day After Foam Treatment
20
Paving
21
Final Driving Surface
22
Advantages of Foamed Asphalt
  • Allows the use of unsuitable base material (6 to
    20 passing the No. 200 sieve).
  • Eliminates the need and expense of removing
    unsuitable bases.
  • Can be opened to traffic immediately after
    compaction.
  • Increased strength

Material Design Resilient Modulus (Ksi)
Foamed Asphalt Treated Base Crushed Asphalt Base Crushed Aggregate Base Coarse 110 80 40-50