Title: Transport Planning Process
1 Transport Planning Process? ? ? ? ? ?
1
2Interactive with Land Use Planning ? ? ? ? ? ? ?
? ? ? ?
Strategic LevelCTS-3 model ????? ????????
Territorial Land Use Planning ?????????
Project Feasibility Studies ???????
District LevelBTDMs, TIAs ????? ????????, ??????
District Land Use Planning ?????????
3 Transport Planning Tool? ? ? ? ? ?
3
4Development of CTS Model ? ? ? ? ? ? ? ? ?
- First developed in CTS-1 completed in
1976?????? CTS-1 ?1976????? - Latest version CTS-3 completed in 1999,
suits??? CTS-3 ???1999 ???,? ? - HKs multi-modal transport system
- ?????????????
- Local travel behaviours characteristics
- ??????????
5CTS Model is ? ? ? ? ? ? ?
A scientific objective planning tool to
account for the following factors
???????????????????
- Land use????
- Economic growth????
- Transport network????
- Travellers behaviours????
Traffic flows ???? Travel times and
costs ????/??
CTS Model??????
6CTS-3s modelling algorithumsCTS-3 ? ? ? ? ? ? ?
- Trip Generation / Attraction ????? / ??
- (how many trips in each zone -
?????????????) - Trip Distribution ?????
- (where to where - ??????????)
- Modal Split ??????
- (by what mode - ???????????????)
- Period Classification ??????
- (at what time period - ???????)
- Route Assignment ?????
- (on which PT route / road - ?????????? / ??)
7Basic Inputs Land Use Planning Data (1) ? ? ?
? ? ? ? ? ? ? ? ? ? ? (1)
- For each traffic zone
- ??????
- Population ????
- Household number income ???????
- Resident workers ???????????
- Resident students ??????????
- Age distribution (10 groups) ????(10 ?)
- Private car parking spaces ????????
8Basic Inputs Land Use Planning Data (2) ? ? ?
? ? ? ? ? ? ? ? ? ? ? (2)
- For each traffic zone
- ??????
- Employment places (12 types) ?????? (12?)
- School places (4 types) ???? (4?)
- Hotel rooms ??????
-
- Market stalls ??????
- Cinema theatre seats ??????
- Hospital beds ??????
9Other Model Inputs? ? ? ? ? ?
- Economic Growth????
- Road network ????
- Public transport network??????
- Cross boundary traffic projection??????
- Port airport throughputs????????????
- Private and goods vehicle fleets????????
10Annual Update ? ? ? ?
Revalidate Model Parameters ?? ????
- Independent Traffic Data
- ????????
- Traffic PassengerFlows of Major
Roads??????????? - Public TransportPatronage
- ??????????
-
Update Planning Assumptions ???? ????
Update Forecasts ??????
11Experts Views (1)? ? ? ? ? ? ? ? ? (1)
- Prof H K Lo, HKUST
- ??????, ???????
- state-of-the-art modelling practice?????????
- among the most sophisticated of its kind, most
comprehensive ????????????
12Experts Views (2)? ? ? ? ? ? ? ? ? (2)
- Mr Tim Man, veteran transport planner
- ?????, ????????
- scientific assessment of infrastructure
needs?????????? - used extensively worldwide (including UK,
USA)??? (?????) ???? - one of most sophisticated for HKs complicated
urban fabric ???????? ,??????????????
13The Central Wanchai BypassandThe Island
Eastern Corridor Link??????????????
14The Stragetic Routes ????
? ? New Territories
Kowloon
??
? ? ? Lantau Island
? ? ?
Hong Kong Island
15The Central-Wanchai Bypass IEC
Link??????????????
16Existing Traffic Congestion ??????
- Queue Length around 1 1.5 km
- ???????????
- Speed at about 7 km/hr
- ???????????
- 15 min from Central to Causeway Bay
- ????????????
17Causes of Problems ????
Insufficient road capacity ??????? Mixing
between through traffic and local
traffic ????????? Severe weaving
problems ????????
18Solution Central Wanchai Bypass IECL????
??????????????
Complete the missing trunk road link Segregate
through traffic (e.g. Proven Examples Island
Eastern Corridor, Kwun Tong Bypass, Tsuen Wan
Bypass) Cut down weaving movement
?????????? ?????? (??????????????????????? ??
???) ??????
19Forecast Conditions 2011 ??2011???
Without CWB ????????? With CWB ????????
Traffic Flow ? ? Exceed Capacity by 30 ???????? With 10 Surplus Capacity ???????
Traffic Speed ? ? 5 kph ????? Free Flow ????
Central to Causeway Bay ?????? 45 min ????? 5 min ???
20Other Measures Considered ?????? (1)
- Better Utilisation of the Western Harbour
Crossing - ???????
Reduction on Gloucester Road traffic less than
2 ?????????????2??
Connaught Road Central cannot carry diverted
traffic ???????????????????
NOT EFFECTIVE ?????
21Other Measures Considered ?????? (2)
- Extension of the MTR to Western District
- ???????
- Already allowed WIL in the traffic model
- Buses mainly run along inner roads
- At-most slight effect on inner roads
- ????????????
- ?????????
- ???????????
NOT EFFECTIVE ?????
22Other Measures Considered ?????? (3)
- More Hillside Escalators from Central to
Mid-levels - ?????????????
Only help relieving demands for Public Transport
in the Mid-levels ??????????????? Effect becomes
negligible when reaching the Corridor ??????????
NOT EFFECTIVE ?????
23Other Measures Considered ?????? (4)
- Reduce Bus Trips into Central
- ????????????
- Already Reduced Bus Trips
- reduced by more than 10 over last 5 years
- room for further cutting limited on corridor
- ???????
- ??????,???????10??
- ?????????????????
NOT EFFECTIVE ?????
24Other Measures Considered ?????? (5)
- Imposing Loading/ Unloading Restrictions in
Central - ??????????
- There are already severe restrictions on loading
/ unloading - ?????????????
- Further restrictions will have serious impacts in
the operation of commercial activities - ????????????????????
NOT EFFECTIVE ?????
25Other Measures Considered ?????? (6)
Fiscal Measures ????
Already very high FRT, ALF and fuel taxes on
private cars ?????????????????????? About 90
passengers trips using public transport ?????????
??
Very low private car ownership rate 50 veh. per
1000 population (120 veh in Singapore and 350 veh
in London) ????????? - ????50 ?(?????120?????350?)
NOT EFFECTIVE ?????
26Possible Complementary Measures
???????
Electronic Road Pricing (ERP) ??????
- According to 2001 Feasibility Study
- Assuming CWB available by 2011 as the alternative
route - ERP technically feasible
- But high level of public consensus needed
- ??2001??????
- ?????????2011?????????
- ???????????
- ??????????
27ERP Complements CWB
????????????????
CWB - a strategic solution to divert east-west
traffic away from Connaught Road/Gloucester Road
corridor ?????? ????????????/?????????????? E
RP - needs CWB as an alternative route for
vehicles to avoid entering into the charging
zone ?????? ??????????????????????????
28London Vs Hong Kong Situation
??????????
Key Data ???? London ?? Hong Kong ??
Car Ownership per 1,000 Population ?????????? 350 50
Public Transport Passenger Trip per Day ???????? 45 - 77 depending on location ???? 90
Private Car Passenger Trip per Day ??????? 23 - 55 depending on location ???? 10
Private Car Traffic into CBD ?????????? 49 (before charging) (????) 38 (after charging) (????) 37
29London Experience ?????
Inner Ring Road as an alternative route for
vehicles to avoid entering into the charging
zone ????????????????????? Public transport and
taxi exempted ??????????? Result 14 less
vehicles entering charging zone ??
??????????14 Adverse impact on business
reported ??????????
30Way Forward ????
Govt will further examine ERP in detail and
monitor overseas development ?????????????????????
?????? To be considered when CWB in
place ??????????????? Still requires high level
of public consensus ??????????
31Thank You????