1Seria I Studenci IV-go roku GÓRNICTWO I
GEOLOGIA Akademia Górniczo -
Hutnicza
Kraków 23. X. 2010
Projektowanie filarów i stropów w
górnictwie wegla
Prof. Zdzislaw Bieniawski Bieniawski
Design Enterprises, USA
2 - Wprowadzenie
- Dane geotechniczne niezbedne do projektowania
- Podsumowanie najwazniejszych klasyfikacji masywu
skalnego - Terzaghi, RQD, RMR and Q
- Mniej polecane GSI
- Dziesiec Przykazan dla uzywania RMR i Q
- Nowa Austriacka Metoda budowania Tuneli
- Oszacowanie wlasnosci masywów skalnych
3(No Transcript)
4(No Transcript)
5(No Transcript)
6Nowa Austriacka Metoda Tunelowa NATM
- RMR NATM (2004 ÖNORM B2203) Q
- 80 100 Class I (80-100) A1
Strong/stable gt100 - 60 80 Good II (65-80) A2
Loosening/Block failure 10 100 - 50 60 Fair IIIa (58-65)
B1 Friable/Low stress failure 4 10 - 40 50 IIIb (45-58)
B2 Deep stress failure 1 4 - 20 40 Poor IV (29-45) B3
Rock pressure 0.1 1 - 10 20 Va (20-29)
C1 Shear failure 0.01
0.1 - 0 10 Vb (5-20)
C2 Ravelling, flowing lt 0.01 - over
L1 Soil, high cohesion - V
L2 Soil, slight cohesion
New ref Austrian Society for Geomechanics, 2008
Draft
7Palmström and Singh, 2001
8(No Transcript)
9Odksztalcenie masywu skalnego
Modul EM (GPa)
Galera 2008 EM Elab
e(RMR - 100)/36
10Rock Mass Strength (MPa)
sMASS sc (intact) e(RMR - 100)/24
Kalamaras 1995
Galera 2008 EMASS E
intacte(RMR - 100)/36 dlatego EM
sM Ei sc
2/3
11Kalamaras, 1995
12(No Transcript)
13(No Transcript)
14Praktyczne zastosowaniaKlasyfikacji w Górnictwie
- M-RMR (Laubscher and Taylor, 1975)
- Mod.RMR (Newman and Bieniawski, 1981)
- MBRMR (Cummings and Kendorski, 1982)
- Coal Mining RMR (Unal, 1983)
- Indian Coal RMR (CMRS, 1986)
- Coal Mine Roof Rating (Molinda and Mark, 1994)
- Weak Rock RMR (Unal, 1996)
- Deutsche Steinkohle klasifikacion (Witthaus,
2006)
15MBR (Mining Basic RMR) system Kendorski et
al A rock mass classification for caving mine
design, RETC, 1983, p.193
16Conclusions
- Place rock mass classifications within the
overall engineering design methodology and
process - Observe the Ten Commandments for use of rock mass
classifications - For best engineering practice, exchange
experience between tunnelling and mining
projects.
17 Literatura
- Alber, M (1996)
- Classifying TBM contracts. Tunnels
Tunneling Int., December, p.41. - Aksoy, C O (2008)
- Review of Rock Mass Rating classification.
Journal of Mining Science, v. 44, no. 1, p.51. - Barton, N and Bieniawski, Z T (2008)
- RMR and Q Setting records straight.
Tunnels Tunnelling Int., February, p 26. - Bieniawski, Z T (1997)
- Quo Vasis Rock Mass Classifications.
Felsbau, v. 15, no. 3, June, p.177. - Bieniawski, Z T (1992)
- Design Methodology in Rock Engineering
Theory, Education and practice. A A Balkema
Publishers, Rotterdam, 198p. - Jakubec, J and Esterhuizen, G S (2007)
- Use of mining rock mass rating
classification. NIOSH Info. Cir. IC 9498, ed C
Mark, p.73. - Kalamaras, G and Bieniawski, Z T (1995)
18(No Transcript)