Hot Work Procedure and Permit
April 2013
2
Overview
  • Why is there a new hot work process?
  • Description of hot work areas
  • New Hot Work work practice and permit
  • Permit picture
  • Permit records
  • Where to get the permits
  • Mine to port
  • Any questions

3
Why is there a new hot work process?
  • To clearly document the requirements for
    completing hot work at IOC
  • To be consistent across Sept Iles and Labrador
    City operations
  • To improve the controls in place for hot work

4
Hot Work areas
  • A hot work permit is required for all hot work on
    site that is not conducted in a designated area
  • Designated areas
  • Is a specific area designed and approved for hot
    work on a continual basis e.g. welding bays
  • Hot work permit areas
  • Is an area where hot work is permitted provided
    that they are made fire safe, a Hot Work Permit
    has been issued and a Job Hazard Analysis (JHA)
    has been completed
  • Prohibited areas
  • Is an area where there is a high potential for
    fire and / or explosion or where combustible
    hazards cannot be adequately controlled. See Hot
    Work procedure for additional information

5
New hot work procedure and permit
  • New Hot Work work practice and permit
  • Link to IOC-S-E-WP Hot Work
  • Key points
  • A Hot Work Permit is for one specific job in one
    location
  • Hot work permit shall be posted where the hot
    work is being performed
  • Review the precautions for hot work with the
    person(s) performing the hot work and assigned
    fire watch prior to issuing the permit
  • Ensure the emergency response plan is in place
  • Ensure all fire fighting equipment is appropriate
    and operational

6
Permit front page
7
Permit back page
8
Permit Records
  • Permit issued by an IOC Leader
  • Permit is reviewed by workers doing the job
  • Fire watch signs off permit 60 minutes after
    completion of the task
  • All hot work permits shall be kept at the job
    site for the duration of the permitted task
  • The permit shall be available for inspection by
    other parties including your supervisor, safety
    advisor etc

9
Where to get the permit?
  • Hot work permits are available from your team
    leader
  • Warehouse reference numbers
  • Labrador City 2423152
  • Sept Iles 2338897

10
Where to get the procedure
11
Questions
Write a Comment
User Comments (0)
About PowerShow.com