Herschel PACS IBDR SIGNAL PROCESSING UNIT SPU HW Unit, Startup SW and Lowlevel SW Drivers - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Herschel PACS IBDR SIGNAL PROCESSING UNIT SPU HW Unit, Startup SW and Lowlevel SW Drivers

Description:

HW Unit, Start-up SW and Low-level SW Drivers. Jos M. Herreros ... Two PSC ASICs including: Watchdog, OBT and 32 bit GP Timers. ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 22
Provided by: albrechtp
Category:

less

Transcript and Presenter's Notes

Title: Herschel PACS IBDR SIGNAL PROCESSING UNIT SPU HW Unit, Startup SW and Lowlevel SW Drivers


1
Herschel PACS - IBDR SIGNAL PROCESSING UNIT-
SPU -HW Unit, Start-up SW and Low-level SW
Drivers
  • José M. Herreros
  • INSTITUTO DE ASTROFÍSICA DE CANARIAS
  • - IAC -

2
CONTENTS
  • Electrical Design Evolution
  • Budgets.
  • Box Outlines and Block Diagrams.
  • Software
  • Model Philosophy.
  • CRISA Status Report.
  • Critical / Problem Areas.
  • Schedule.

3
ELECTRICAL DESIGN EVOLUTION
  • CPU BOARD
  • Program and Data Memory sizes increase due to
  • PACS data reduction/compression requirements
  • UTMC memories instead of WhiteElectronics
  • PSC ASIC Design consolidation (TEMIC
    manufacturer)
  • DC/DC CONVERTER
  • Removal of external synchronization

4
New MEMORY ORGANIZATION
5
SPU UNIT BUDGETS
6
PACS SPU BOX OUTLINE
LFI-REBA
PACS-SPU
7
SPU FUNCTIONAL BLOCK DIAGRAM
  • The CPU board is designed to include as maximum
  • One DSP working at 18 MHz
  • One 32 KW x 48 Boot PROM bank
  • Three EDAC protected SRAM memory banks
  • 512 KW x 48 for Program RAM
  • 512 KW x 32 for Data RAM
  • 512 KW x 32 for expansion of Data RAM
  • One EDAC protected up to 256 KW x 48 EEPROM
    memory bank.
  • Three IEEE1355 DS links including one common
    8KWx32 Dual Port RAM buffer
  • Two PSC ASICs including
  • Watchdog, OBT and 32 bit GP Timers.
  • EDAC logic and Interrupt management.
  • Programmable Address decoding and Wait State
    generator.
  • One Auxiliary Board Interface, including
  • One redundant interface to the MIL-STD-1553 bus
    including one 8KWx16 Dual Port RAM buffer.
  • One Mother Board Interface
  • Each CPU board executes its own specific Start Up
    and Application Software.

8
CPU BLOCK DIAGRAM
9
DC/DC CHARACTERISTICS
  • Input Voltage Operation from 26 to 32 Volts
  • Use of a SMART Converter
  • (Buck / Push-Pull with conductance Control)
  • Buck Switching Frequency Operating around 130kHz
  • Outputs Voltages as follow
  • 5 Volts
  • /- 15 Volts

10
DC/DC BLOCK DIAGRAM
11
DAUBLOCK DIAGRAM
12
ASICBLOCKDIAGRAM
13
START-UP SW AND LOW-LEVEL SW DRIVERS
  • Both SWL-SPU and LWL-SPU contain their own
    separate but identical PROM SW activated
    simultaneously during the switch-on of the SPU or
    under a SW reset.
  • The Start-Up SW will perform the necessary
    functions to boot the unit at power up, perform a
    health self-test and start the Application SW
    giving it the control.
  • The Low-Level SW drivers is a set of primitives
    (source/object code) to be compiled/linked with
    the different application software package.

CONTEXT DIAGRAM
14
PACS SPUSTART-UP SWARCHITECTURE
15
SPU MODEL PHILOSOPHY
16

17
CRISA STATUS REPORT (1/4)
  • Contract / Commercial / Management
  • Phase 1 - conditioned final milestone - achieved
    on W51
  • Phase 2 - 2nd progress Milestone - took place on
    W51.
  • Phase 3 ITT not set.
  • HW System Engineering
  • System engineering activity Production of
    revised system documents for the system BDR
    (HW/SW ICD).
  • Design engineering activity DC/DC Electrical
    design consolidated. PCB design finished.
  • SW Engineering
  • Integration under way. Little adaptations being
    implemented in parallel with the tests.

18
CRISA STATUS REPORT (2/4)
  • ASIC Development
  • ASIC tests and integration fully completed in
    representative FPGA. Now working in the
    coberture (failure simulations) as part of the
    industrial file for procurement. This activity
    resulting more complex than expected will be
    finished beginning W10. The complete dossier is
    expected to be ready by end March 2002.
  • Physical Verification Engineering
  • None.
  • Unit Tester Engineering
  • Unit tester HW SW (1st) in work area.
  • Complementary test set ready in work area.

19
CRISA STATUS REPORT (3/4)
  • Procurement Parts Engineering
  • DC/DC CV PCB for AvMs ordered week 8.
  • Last steps of the Procurement for AvM going on
    compatible with schedule. No critical conflict
    still envisaged.
  • Changes to DCL (coming from DC/DC design) to be
    reported on February 22nd 2002 to TLG and IAC.
  • MAI Activities
  • New CPUs set under MAI, about 60 achieved. No
    conflict envisaged up to now in plant to fulfil
    delivery dates. Two boards already waiting to be
    tested.
  • 1st DAU and AUX ready for tests.

20
CRISA STATUS REPORT (4/4)
  • Tests activities
  • 1st CPU under HW Characterisation. Timing
    problems detected outside the CPU, concretely
    within the NAIS test board (an auxiliary I/F
    board with the logic analyser used in test). Once
    confirmed this fact, tests have been normally
    resumed. They are satisfactorily running at good
    rhythm by now.
  • SW (version 1) integration under way. Last steps
    performed consisting on the successful initiation
    of the 1355 / SCMS tests.
  • EMs / AvMs Delivery Schedule - no margin included
    -
  • EM SPU ready for delivery 15/03/02
  • EM REBA ready for delivery 04/04/02
  • AvM SPU ready for delivery 16/04/02
  • AvM SPU ready for delivery 04/04/02

21
CRITICAL / PROBLEM AREAS
  • Financing for PACS-SPU and LFI-REBA Qualification
    stage
  • Confirmed un-officially.
  • Funds expected for end of December not received.
  • Negotiations in progress.
  • ITT for Phase III Qualification and QM
  • Not started pending of receiving funds.
  • Request for financing Phase IV Flight Models
  • To be made before 15 of March.
Write a Comment
User Comments (0)
About PowerShow.com