Pollution Prevention in the Environmental Management System at LANL Dr. Denny Hjeresen - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Pollution Prevention in the Environmental Management System at LANL Dr. Denny Hjeresen

Description:

Prevention vs. Pollution Prevention - One ISM message ... P2 built in as key step in ISM work control process ... At LANL all new procedures must justify costs ... – PowerPoint PPT presentation

Number of Views:84
Avg rating:3.0/5.0
Slides: 17
Provided by: IM6
Category:

less

Transcript and Presenter's Notes

Title: Pollution Prevention in the Environmental Management System at LANL Dr. Denny Hjeresen


1
Pollution Prevention in theEnvironmental
Management System at LANLDr. Denny Hjeresen
  • EFCOG/EMS Workshop
  • March 8-9, 2005

2
Overview
  • EMS as Major Marketing Opportunity for P2
  • EMS has requirements, P2 doesnt
  • Prevention vs. Pollution Prevention - One ISM
    message
  • LANL Strategy Transparent merger of P2 and EMS
    into business practices
  • P2 - EMS integration methods
  • Marketing - Packaging the Basic Message
  • Cost/Benefit Analysis Cost Estimating
  • Case Studies
  • Objectives and Targets - Performance Measures
  • Division Action Plans - P2 Opportunity
    Assessments
  • Providing the resources - GSAF
  • Graphics and Training

3
Prevention - An Upstream Approach
Currently starting too late in processes
  • Environmental Approach
  • Conduct the work
  • Weigh the waste
  • Transfer to waste mgmt.
  • Recycle
  • Minimize the volume
  • Package
  • Ship
  • Store
  • Safety Equivalent
  • Conduct the work
  • Count injuries, deaths
  • Send to hospital
  • Triage
  • Bandage
  • Send to recovery

Stop accepting the waste premise!
4
Prevention Requires Technical Staff
Technical Staff
C O S T
Waste Management Staff
5
P2/EMS Strategy Dont ASK Anymore
  • Strategy Extend the principle of affirmative
    procurement automation to new venues
  • LANL and SNL Sustainable Design example
  • Change the engineering standards
  • LEED requirements passed to AE firms
  • P2 built in as key step in ISM work control
    process
  • Identify Hazard ? Prevention Opportunity ?
    Controls
  • P2 requirements in Automated Job Hazard Analysis
    Tool
  • Project Review (PR-ID) Criteria requires P2
    project review
  • Built P2 objective into contractual requirements
  • LANL/UC Appendix F requirement

6
P2 in Objectives and Targets
  • Policy statement requires P2 commitment
  • Division-level charter includes commitment to
    prevention
  • Implementing at Division level (35)
  • Objectives and Targets
  • Incorporated into Institutional Objectives
  • Required EMS or ISO Policies
  • LANL needed Aspects, Communications, and Legal
  • All built in prevention requirements
  • Revising additional Lab requirements
  • New DOE/NNSA P2 targets are EMS focused

7
Making the Business Case
  • At LANL all new procedures must justify costs to
    financial and science office directors
  • Switched to cost/benefit argument
  • Poor environmental performance costs money
  • Cost/Benefit studies to document waste,
    regulatory, technical staff resources required
  • LANL Waste Cost Study - what do we pay?
  • Annual Waste Volume Forecast - whats coming
  • Highlighted payback
  • P2 Awards Program (2 years gt7 M savings)
  • GSAF Program - 241 ROI on projects over time
  • Identify the costs - hearts and minds will follow
  • Put the cost arguments in terms relevant to
    specific Divisions
  • Staff-time
  • Overhead costs
  • Mission interruption

8
Why EMS at LANL?
RockyFlatsClosing
High fluxbeam atBrookhaven
9
Why EMS at LANL?
Delayed startup of our hydrodynamic test
facility, DHART
Bio Safety Level III Facility not operating
At DX-2, leaks kept scientists from using lab
sinks for over two years
10
Why EMS at LANL?
58,000/m3
TRU 1.6 m3 LANL FY04 78 m3
or
49 new post-docs
11
Benefits
INEEL Environmental Enforcement
Penalties (Original Assessed Penalty)
LANL Fines 1.5 M last two years Real costs
higher
12
Packaging the Message
  • Built prevention into every element of EMS
    implementation
  • Graphics - posters, badges, viewgraphs,
  • The EMS is business! Prevention is a key delivery
    mechanism
  • Training
  • All-employee EMS awareness training
  • Features prevention examples
  • Repeated Training Message
  • Division leader kickoff
  • Division Group Leader kickoff
  • All-employee required training video
  • Manager training module
  • How to use P2 to achieve results

13
EMS Policy
  • www.ems.lanl.gov

14
Merging EMS with P2 Programs
  • Basic EMS pitch
  • Decrease negative aspects - increase positive
  • P2 efforts are primary tool to highlight positive
  • Environmental Aspects - Significance Evaluation
  • P2 listed as a positive significant aspect
  • Environmental Action Plans
  • Using P2 Opportunity Assessments as evaluation
    tool
  • Process maps help identify mission improvements
  • DNA sequencing case study
  • Generator-set Aside Funds made available to
    execute
  • Only P2 based projects qualify
  • Leveraged funds - help them do the right thing
  • Awards Program
  • Consciously recognize the projects that come out
    of the EMS continuous improvement process

15
P2 in EMS Life Cycle
Aspects
Review
Plans (PPOA)
Awards
Resources (GSAF)
16
Summary
  • Prevention is the smart business choice
  • Document how and specifically for whom
  • Prevention is most effective upstream
  • Give control and recognition to technical staff
  • Prevention as a guerilla activity - quit asking!
  • Built into life-cycle of LANL EMS