Bridge Office Update MnDOT ACEC Annual Conference - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Bridge Office Update MnDOT ACEC Annual Conference

Description:

Management Plan Current Ad. Project Facilitator Current Ad ... Prelim Plans Soon. Final Plans Probable In-House. I-610 Construction (TH 169 I-94) ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 22
Provided by: ZERW
Category:

less

Transcript and Presenter's Notes

Title: Bridge Office Update MnDOT ACEC Annual Conference


1
Bridge Office Update Mn/DOT ACEC Annual
Conference
  • FEBRUARY 28, 2007
  • Earl Brown Heritage Center

2
Bridge Construction Program
3
(No Transcript)
4
Consultant Administration
5
BRIDGE CONSULTANT PROGRAM
By Fiscal Year
Br53-P-ppt
6
FY 05 SELECTIONS
  • Crosstown (26 Bridges)
  • TH 10 Bridges in Detroit Lakes (3 Bridges)
  • County Ratings
  • Lafayette Bridge Study
  • Fabrication Inspections

7
FY 06 SELECTIONS
  • Crosstown Construction Engineering
  • Fabrication Shop Inspections (2)

8
FY 07 SELECTIONS
  • Bridge 27R14 (RR)
  • Fabrication Shop Audit
  • Lift Bridge Repair
  • St. Croix River Crossing Pre-Design

9
FY 08 SELECTIONS
  • Complex Bridge Ratings
  • Fabrication Shop Inspection
  • Underwater Inspections
  • Lafayette Prelim Design
  • Drebach Prelim Design (District 6 Contract)
  • Projects Accelerated of 2007 Legislature Provides
    Additional Funding

10
Major Bridges
11
Dresbach Bridge Pre-Design
  • Ad this Spring District 6
  • River Bridge, Minnesota Approach, Environmental
  • Several MN Approach Bridges Not Included
  • River Bridge Options
  • Renovation
  • New Traditional Bridge (Match existing spans)
  • New Non-Traditional Bridge (Long Span)
  • Letting - 2014

12
Stillwater Lift Bridge Repair
  • Current Ad
  • Quality-Based Selection This Spring
  • Develop Operation Maintenance Manual
  • Develop Repair Plan
  • Develop Trail Bridge Plan
  • Concurrent Work by Mn/DOT Cultural Resource Unit
    (CRU)
  • Management Plan Current Ad
  • Project Facilitator Current Ad

13
St. Croix River Crossing Pre-Design
  • RFP Under Development
  • Open Advertisement
  • Extradosed Bridge
  • Design to 30 Level
  • Letting 2024 or Earlier

14
Lafayette Bridge
  • Renovation Type Study Near Completion
  • March 07 Decision on Environmental Process
  • Environmental Assessment?
  • Project Memo?
  • Metro Consultant Contract
  • June 07 Decision on Bridge Type
  • Roadway Prelim Plan Metro Contract
  • Bridge Prelim Plan Bridge Office Contract
  • Possible Single Contract Roadway, Bridge,
    Environmental

15
Lafayette Bridge (cont.)
  • Final Design
  • Start Summer 2008
  • Complete Summer 2010
  • Dependant on Funding

16
Hastings Bridge
  • 20-Year Plan
  • Traffic Study Regional Needs Assessment
  • RFP Under Development by Metro
  • Bridge Assessment
  • Can Existing Bridge be Preserved?
  • What is its Life Expectancy?

17
Future Projects
18
Future Projects
  • New Minnesota River Crossing (Near Clearwater)
  • I-94 CO to TH 10
  • Includes 14 Bridges
  • Layout Signing Soon
  • I-694 Expansion
  • 2014 Letting
  • 25 Bridges
  • Layout Under Review

19
Future Projects
  • I-494 Reconstruction
  • I-394 Fish Lake Interchange
  • 18 Bridges Some Flyovers
  • Layout Under Review
  • Letting?
  • TH 100 Reconstruction (South of I-394)
  • 5-7 Bridges
  • 2014 Letting
  • Layout Under Review
  • Metro Environmental Contract

20
Future Projects
  • Paynesville By-Pass
  • 9 Bridges
  • 2008 Letting
  • Prelim Plans Soon
  • Final Plans Probable In-House
  • I-610 Construction (TH 169 I-94)
  • 26 Bridges
  • Layout Complete
  • Start Prelim Plans Spring 2008
  • Letting?

21
Future ProjectsWhat Does This Mean?
  • Almost 100 Bridges
  • Consultant Design Depends on Timing