Title: System Test and Installation


1
System Test and Installation
  • System test and installation in the SDLC
  • Installation goals
  • Design and perform the system test
  • Install the components
  • The user acceptance test
  • Cutover
  • The post-implementation evaluation
  • Systems maintenance
  • System test and installation management
  • The future of the system

2
System Test and Installation in the SDLC Fig
9.1 System Test and Installation Overview
3
Installation Goals
  • Meet design specs
  • Meet cost constraints
  • Meet time constraints
  • Turn control over to capable users

4
Design and Perform the Systems Test The
production staging environment
5
Install the System Components
  • Installation Schedule
  • Tasks, person assigned to it, time schedule
  • Installation procedures and controls
  • To maintain data integrity and cross check the
    old and new systems
  • Contingency plan
  • Old or new system fails during conversion
  • Timetable for dismantling old system

6
Install the System Components Fig 9.3
Installation Plan Checklist
7
The User Acceptance Test User acceptance form
8
Cutover
9
Post-Implementation Evaluation
  • Post Implementation Report
  • Generally 2-3 months after the cutover
  • System Quality
  • Project Management
  • Organizational Relevance

10
Evaluation Process
  • Review Project Documents
  • Old system, promised system, and the delivered
    system
  • Plan the review
  • Conduct interviews
  • Prepare the report
  • Submit the report to management

11
Data Gathering Forms
  • Project summary (Page 496Fig 9.6)
  • Users evaluation (Page 498Fig 9.7)
  • Developers evaluation (Page 500 Fig 9.8)
  • Evaluation of project management (Page 501Fig
    9.9)
  • Post-Implementation Report (Page 502 Fig 9.10)

12
System maintenance
  • System compatibility maintenance
  • System efficiency and reliability maintenance
  • Emergency needs and errors maintenance
  • User enhancements maintenance

13
Strategies for reducing system maintenance
  • Eliminate unnecessary changes
  • Define functional requirements right
  • Build in flexibility, portability
  • Thorough testing
  • Thorough training
  • Reduce effort of changes
  • Thorough documentation
  • CASE/Tools

14
System Test and Installation Matrix
  • System components
  • Input, Processing, Output, Storage, Control
  • Resources
  • People, Data, Information, Hardware, software
  • Matrix Components
  • Meets functional requirements
  • Facilities including equipment, fixtures,
    supplies
  • Users manuals and procedures
  • User training
  • Technical manual procedures

15
The Future of the System
  • System dismantling
  • Redevelopment
  • Business process redesign (BPR)