Software Testing and Reliability Testing Real-Time Systems - PowerPoint PPT Presentation

About This Presentation
Title:

Software Testing and Reliability Testing Real-Time Systems

Description:

Last update: April 17, 2003. Software Testing and Reliability Aditya P. Mathur 2002 ... Embedded Systems, Do You have the GuTs for it?, Vincent Encontre, Rational June ... – PowerPoint PPT presentation

Number of Views:142
Avg rating:3.0/5.0
Slides: 19
Provided by: ValuedGate2215
Category:

less

Transcript and Presenter's Notes

Title: Software Testing and Reliability Testing Real-Time Systems


1
Software Testing and ReliabilityTesting
Real-Time Systems
  • Aditya P. Mathur
  • Purdue University
  • May 19-23, 2003
  • _at_ Guidant Corporation
  • Minneapolis/St Paul, MN

Last update April 17, 2003
2
Learning objectives
  • Issues in testing real-time systems
  • Methodology for testing real-time systems
  • Tools for testing real-time systems

3
References
  • Testing Embedded Systems, Do You have the GuTs
    for it?, Vincent Encontre, Rational June 2001,
    http//www.rational.com/products/whitepapers/final
    _encontre_testing.jsp
  • CodeTest Vision for Embedded Software, Applied
    Microsystems Corporation, http//www.amc.com/prod
    ucts/codetest/.
  • G-Cover Object Code Analyzer, Green Hills
    Software Inc., http//www.ghs.com/products/safety_
    critical/gcover.html
  • DO-178B, http//www.rtca.org and
    http//www.windriver.com/products/html/do178b.html

4
The RTCA DO-178B Guidelines
  • The FAAs DO-178B offers guidelines for the
    development of airborne systems equipment
    software.
  • The guidelines in DO-178B impose constraints on
    the software development process so that the
    resulting system is safe.
  • Most RTOS tool vendors have accepted the
    guidelines in DO-178B and begun to offer tool
    support.

5
Levels of Criticality-A, B
  • Level A Software with anomalous behavior, as
    shown by the system safety assessment process,
    would cause or contribute to a failure of system
    function resulting in a catastrophic failure
    condition for the aircraft.
  • Level B Software with anomalous behavior, as
    shown by the system safety assessment process,
    would cause or contribute to a failure of system
    function resulting in a hazardous/severe-major
    failure condition for the aircraft.

Guidant products Level A or B?
6
Levels of Criticality-C, D, E
  • Level C Software with anomalous behavior, as
    shown by the system safety assessment process,
    would cause or contribute to a failure of system
    function resulting in a major failure condition
    for the aircraft.
  • Level D Software with anomalous behavior, as
    shown by the system safety assessment process,
    would cause or contribute to a failure of system
    function resulting in a minor failure condition
    for the aircraft.
  • Level E Software with anomalous behavior, as
    shown by the system safety assessment process,
    would cause or contribute to a failure of system
    function with no effect on aircraft operational
    capability or pilot workload.

7
Guidelines Related to Testing
  • Test Procedures are correct
  • Results are correct
  • Compliance with Software Verification Plan
  • Test coverage of High-Level requirements
  • Test coverage of Low-Level requirements
  • Test coverage of object code
  • Test coverage - Statement, Decision, and Modified
    condition/decision
  • Test coverage - Data coupling and control coupling

8
Issues in Testing Real-Time Systems
  • Separation of development and execution platforms
  • Variety of execution platforms (combinations of
    hardware and OS, e.g. Z80/QNX, Tornado/PowerPC)
  • Tight resources and timing constraints
  • Emerging quality and certification standards

9
Test Methodology Unit Testing
  • Identify the module to be tested. This module
    becomes MuT.
  • Prepare MuT for testing.
  • Isolate the MuT from its environment.
  • Make MuT an independently executable module by
    adding a stub and a test driver.

Generate tests
Replaces the rest of the application
Module under test
10
Issues in Unit Testing
  • How to generate tests?
  • What to observe inside MuT?
  • Returned parameters
  • Internal state such as values of global
    variables, coverage, control flow for
    verification against a UML sequence diagram, etc.
  • How to observe?
  • Use coverage tools or debuggers
  • Insert probes
  • When to stop testing?

11
Test Methodology Integration Testing
  • Combine multiple MuT into a larger software
    component.
  • Build a test harness.
  • Look for the correctness of interactions amongst
    the various MuTs in the component. Again, UML
    sequence diagrams can be useful in validating the
    interactions against design.

12
Test Methodology System (Unit) Testing
  • The MuT is now a complete software application.
  • Test is executed under the RTOS.
  • Communication amongst individual modules might be
    via the RTOS.
  • Observation is done using probes. The data so
    collected is analyzed on the host platform.
  • The test driver could now be a simulator. The
    system needs to be brought to a desired initial
    state and then generate and send to the system a
    sequence of test messages.
  • Usually one does grey-box testing at this stage
    but more could be done.

13
Test Methodology System Integration Testing
  • Integrate other software components of the
    end-application. These might be off-the-shelf
    components.
  • Test is integrated system

14
Test Methodology System Validation Testing
  • For overall embedded system, perform the
    following
  • Check if the system meets the end-user functional
    requirements.
  • Perform non-functional testing. This includes
    load testing, robustness testing, and performance
    testing.
  • Check for conformance with any inter-operability
    requirements.

15
Run-time Analysis
Source
WindRiver and Agilent offer real-time trace tools
that work with Agilents logic analyzers.
16
Applicability of Test Techniques to Real-Time
Systems
  • All techniques for test data generation and
    coverage analysis covered in this course are
    applicable when testing real-time applications.
  • Due to the embedded nature of such applications,
    one generally needs to use special tools that
    operate in a client-server mode the server
    running on the host machine and the client on the
    target environment.
  • The client provides data gathered during the
    execution of the embedded application and the
    server analyses and presents it to the tester.

17
Tools for Testing Real Time Systems
  • Rational Test RealTime code coverage execution
    sequence, unit testing integration testing,
    checking assertions for C classes testing C
    threads, tasks, processes evaluatin the UML
    model requirement to test traceability plug-in
    for mathworks Simulink.
  • Applied Microsystems CodeTest A suite of
    several tools performance measurement tracing
    of execution history finds memory leaks code
    coverage measurement supports QNX.
  • Green Hills Software G-Cover Coverage analysis
    at the object code level indirect source code
    coverage information.
  • WindRiver RTA Detects memory leaks identifies
    hot spots per task profiling.

18
Summary
  • Issues in testing real-time systems
  • Test tool architecture
  • Test methodology
Write a Comment