Title: PURCHASING BASIC AWARENESS COURSE for purchasing at City University V4
1PURCHASING BASIC AWARENESS COURSEfor purchasing
at City UniversityV4
2- Agenda
- Introductions
- Objectives
- What is Purchasing?
- General Information
- The Purchasing Cycle
- Round-Up
- Post Training Validation
3- INTRODUCTIONS
- Your trainer today is
- Angus Warren, Director of Procurement, City
University - Attendees
- Your name
- Your role at City
4- Objectives
- This course is designed to
- Provide a basic level training in the key aspects
of purchasing - Make you aware of the key impacts of relevant
legislation - Describe the processes in place to lower the
Universitys and its employees exposure to risk
- Clarify Roles and Responsibilities of those
involved in the purchasing process - Help attendees identify areas in their skill sets
that may need further development / coaching in
relation to purchasing.
5- Post Training Validation
- At The End Of This Course.
- There will be 10 Key Questions.
- These questions address the most essential areas
that must be understood before individuals can
purchase for the University. - If there a few areas of concern, advice /
coaching will be provided if there are
significant areas then re-attendance of the
course will be required.
6Purchasing Basic Awareness
- Key information sources relating to this course
are - This presentation
- The Purchasing QRG
- The Interim Purchasing Manual
- (new version 1.4 onwards)
- Race Equality and Public Procurement document
(CRE Publication) - The Equality Process Flowchart.
- Further supporting data can be found in
- City University Website Purchasing Pages
- City University Financial Regulations
- Commission for Racial Equality Website
(www.cre.gov.uk).
7Purchasing Basic Awareness What Is Purchasing ?
8What is Purchasing ?
Requisition (new need)
Requisition (sourcing already done)
Measure Improve vendor
Performance
(Sourcing)
(Buying)
Identify Need (firm or possible)
Communicate
Negotiate
Award Contract
Place Further Call-Off (order)
Record Receipt
Pay
Issue Contract
Prepare RFQ
Identify Potential vendors
Issue RFQ
Challenge Need
Prepare Specification
Check Legislation
Identify Risks
Place Call-Off (order)
Identify Actual Need
Challenge Actual Need
Measure Improve Internal Performance
Reporting
9Purchasing Basic Awareness
- The content of this course has been formulated
based on normal business process practice, audit
requirements and EU UK law - It should be assumed therefore that if any of the
guidelines discussed are breached then it is
likely that applicable audit regulations or laws
are being breached. - Due to the implications of this, it is important
that the issues discussed are fully understood by
all attendees.
10- The Universitys existing approach on purchasing
is as follows - Generally, operational purchasing administration
will be devolved to institutes, schools service
areas. - Purchasing Services must be advised of, and
involved in, the buying process from the earliest
point where a potential need for purchase is
identified which is likely to exceed 25K.
11Purchasing Overview Key Roles Responsibilities
12- Purchasing Services
- Are the custodians of the Purchasing Process for
ALL Purchasing at City. - Responsible for (1)
- Development and review of an approved purchasing
strategy, policies processes - Audit of operational use of purchasing process
and policies - Training content development delivery
- Managing / co-ordinating the internal dimension
13- Purchasing Services - responsibilites(2)
- Major / strategic spend negotiation across the
University - Providing Managing Purchasing Helpdesk
- Devolved purchasing support - primary care by
tender (gt25K) including ad hoc and major
initiative spending - Contracts review management support
- Terms Conditions of purchase management
- EU Purchasing Legislation Process Administration.
14- Authorised Buyers (Purchasing Administrators in
Purchasing Manual) - Are those members of staff whose jobs involve
raising and placing orders with vendors. - They must ensure (either by undertaking it
themselves or by obtaining assurance from others)
that all relevant rules contained in this
training, the Purchasing Manual and relevant
legislation, have been complied with at each of
the steps of the purchasing cycle for the order
which they are issuing - Particular care should be taken in relation our
legal duty to promote equality at all steps of
the process
15- Authorised Budget Managers (currently also known
as Authorised Signatories) - Authorised Budget Managers are given authority to
authorise expenditure in line with financial
regulation against nominated budget areas by the
relevant Budget Holder. - They must approve expenditure against their
relevant budgets before purchasing can take
place. - They are not authorised to actually purchase
unless they are also Authorised Buyers. - They must be sure that the person placing the
order is a trained and approved Authorised
Buyer.
16- Senior Management
- Are
- Deans of schools / institutes
- and
- Heads of the two service portfolios the V-Cs
Office. - Senior Management have overall responsibility for
all financial matters relating to their areas.
17- Budget Holders
- Budget holders are given budgetary responsibility
for nominated cost centres or budgets. - They must manage the cost centre or budget
effectively in line with Financial Regulations
and procedures. - They must ensure that they do not exceed the
budget or incur any deficit without the prior
approval of the Senior Management or the Director
of Finance and Business as appropriate. - They will delegate authority if applicable to
Authorised Budget Managers / Authorised
Signatories to authorise expenditure against
their cost centres.
18- Purchasing Co-ordinators
- The senior managers of each school and senior
directors of each service function should
nominate a member of staff to act as their
Purchasing Co-ordinator. - The Purchasing Co-ordinator will act as a focal
point for communication from and to Purchasing
Services and will attend Purchasing Co-ordinator
group meetings as appropriate.
19- Terms and Conditions of Contract
- Trade should be conducted on the Universitys
General Conditions of Purchase. - Agreements on vendors terms and conditions of
contract/sale etc should not be accepted. - To trade on a vendors terms in exceptional
situations, permission must be obtained in
writing from the Director of Procurement before
the agreement is entered into. - Industry standard forms of contract may be signed
for capital and maintenance works projects and
associated professional services for Property and
Facilities. - Only the following can authorise the use of such
contracts - Director of Property and Facilities
- Director of Procurement.
- The Universitys General Conditions of Purchase
can be downloaded form the Purchasing Services
Website.
20- Purchasing Cards
- There has been a pilot in operation in the
University testing the operation of Purchasing
Cards (P-cards). - P-card holders must adhere to the rules of issue
signed by them at the time of issue, as amended
from time to time. - P-cards must only be used for the specific
purpose for which they are issued. - The decision whether to use P-cards in each area
is now being considered by Deans relevant
Services Directors.
21- Corporate Contracts
- Purchasing Services will develop jointly with the
appropriate areas of the University corporate
contracts for the supply of goods and services.
These will be of two types - Mandatory
- Recommended - orders may be placed with
alternative vendors, provided - it can be demonstrated that better value for
money can be secured by doing so - the nominated vendor is always given the
opportunity to quote in such instances, if
applicable - the person placing the order with an alternative
vendor keeps a record of the justification for
using a vendor other than the nominated
Contractor. - A list of the corporate contracts operated by
Purchasing Services is available on the
Purchasing Services website.
22- Ethical Standards (1)
- Staff with purchasing responsibility must follow
high ethical standards in all dealings with both
current and prospective vendors. - No employee may accept from any vendor company,
or representative of a vendor or potential
vendor, gifts of value (i.e. unless value less
than 5 per year). - General gifts, such as wine, beverages, clocks
and other low-to-medium value goods received from
time to time must never be retained but should be
either - returned to the vendor (only if this will not
cause offence), or - passed to the Purchasing Services, who will log
receipt of the gift and issue a receipt which the
individual should keep. - Periodically, these gifts will be raffled and the
proceeds given to charity. - Any gift retained by a member of staff obtained
from a vendor, vendor representative or potential
vendor, with the exception of very low value
items, will be deemed to be of the same status as
a bribe retained.
23- Ethical Standards (2)
- Cash, gift certificates, weekend trips, holidays
or any other high value gifts etc may not ever be
accepted under any circumstances. - Any such offers made should be brought to the
attention of the Director of Procurement as soon
as possible. - Business hospitality is a normal courtesy but
should also be treated with discretion. - Occasional business lunches and invitations to
outside events may be accepted when appropriate. - They must be registered in the hospitality
register if a University employees presence is
being funded by a vendor or potential vendor
(this includes lunches, dinners etc). - Offers of extended hospitality (eg hospitality at
a sports event) from a vendor or potential vendor
should be referred to the Director of Procurement
or the Director of Internal Audit BEFORE it is
accepted. - Obviously, the taking or providing of bribes in
any form is strictly forbidden.
24- Ethical Standards (3)
- A register will be kept by the Director of
Procurement containing a declaration by staff
involved in purchasing activities, or those who
may have an influence upon purchasing decisions,
of any possible conflict of interest. - This involves any financial interest or direct or
indirect relationship whatsoever (except purely
formal business relationships) with parties
(people or organisations) involved in the supply
of any goods/services to City University. - Failure to register such interests will be
treated with suspicion and may result in
disciplinary action.
25The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
26The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
27Requirement to Purchase
- Areas to consider BEFORE the process begins
- Approval to Purchase
- Equality in Purchasing
- Applicable Policies
- Sustainability in Purchasing
- Health and Safety
- Risk Management
- Proceeds of Crime Act
- Appropriate Tender Process.
28- APPROVAL TO PURCHASE
- All purchase orders must be formally approved by
an appropriate authorised signatory (Authorised
Budget Manager) prior to committing the
expenditure with the vendor. - APPROVAL FOR PAYMENT
- Invoices should be authorised in line with
financial regulations - A member of staff who commits the University to
expenditure which is not properly authorised is
in breach of Financial Regulations and may be
subject to disciplinary action.
29- Equality in Purchasing (1)
- It is the policy of City University to promote
equality in all its functions. - Legislation is now in place that will outlaw
discrimination on any of the following grounds - Race (effectively includes nationality)
- Disability
- Sex
- Sexual Orientation
- Religion or Belief.
- All purchasing activities must be carried out in
a manner that could not be deemed in any way to
discriminate on any of those grounds.
30- Equality in Purchasing (2)
- Race Relations Act 1976 as amended (RRA)
- Places additional legal obligations on the
University to promote equality in all its
functions. - Due regard therefore must be taken for including
the activities needed to fulfil this obligation
at each step of the purchasing process this
training will address each of these areas.
31- People involved in Purchasing should be aware of
the Universitys policies on - Sustainable Purchasing
- Health Safety including their own departments
HS Policies where applicable
32- Finance / Risk Management
- The Director of Procurement or the Director of
Finance and Business must approve the terms of
leasing arrangements before any agreement is
signed. - The Director of Finance and Business will keep a
record of all leasing arrangements for the
purposes of the Annual Accounts. - Used or second-hand equipment may not be
purchased, except with the specific authorisation
of the Director of Procurement. - If there is justification for buying used or
second-hand equipment, the Director of
Procurement must be satisfied that it is - of satisfactory quality
- compliant with current standards and regulations
and - is supplied with adequate warranties.
33- Proceeds of Crime Act (PCA)
- The PCA is VERY new legislation with little case
law - People breaching the act will be those benefiting
from criminal conduct - Case law will likely (needs to) clarify the true
scope of the act. - As it stands under the act, criminal conduct
is - Any conduct that constitutes an offence in any
part of the United Kingdom, orwould constitute
an offence in any part of the United Kingdom if
it occurred there - For the time being, to reduce the risk of
breaching the act, Authorised Buyers should take
reasonable care in evaluating vendors and if they
have any suspicions that vendors are acting
unlawfully, either investigate their organisation
further or look to an alternative vendor.
34How should the requirement be tendered ?
Requirement to Purchase Goods or Services
Requirement authorised by budget manager
Follow appropriate (under 25K) tender /
quotation process
Is value over 25K ?
NO
YES
You Must Contact Purchasing Services
Operate tender process jointly with Purchasing
Services (non-EU process)
NO
Is value over the EU threshold ?
Operate tender process jointly with Purchasing
Services (EU process)
YES
35- EU Procurement Directives (1)
- The directives state that contracts / spend areas
exceeding the following total values (over a
4-year period) must comply with the requirements
of the directives - SDR 200,000 (153,376) for goods and services
- Euro 5 Million (3,834,411) for works
- Orders or contracts may not be divided in order
to avoid these value thresholds.
36- EU Procurement Directives (2)
- All EU applicable contracts MUST be managed
jointly with Purchasing Services who must be
consulted long before the tendering process is
due to begin as - The Directives lay down minimum tendering
time-scales many tenders will take in excess of
6 months to process - At all times, it must be assumed that the
absolute minimum period of time between
completion of specification of requirements and
receipt of tenders (for evaluation) will not be
less than 80 days (773).
37The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
38Produce Spec
- There are several key areas to consider when
developing specifications - Specification Format
- Barriers to trade / Standards
- Equality.
39- Specification Format
- Specifications should be output based rather
than process based unless the method of
delivery is critical or it is required to comply
with legislation. - They should be as flexible as possible to allow
for wider competition. - They should contain quality requirements and KPIs
if relevant. - They must not have requirements that can not be
justified. - They must not without good reason have
requirements that exclude any groups in society
from tendering.
40- Barriers to Trade / Standards
- European or ISO standards should be used.
- British standards should be avoided and are not
permitted for EU tenders unless no EU/ISO
standard exists. - They should not specify manufacturer brand names
or specifications except where it relates to a
genuine need (if you buy integration tools for
SAP you would need to mention SAP). - If you can not identify another way of defining a
spec except by using a given manufacturers
definition, you should state or equivalent
after the description.
41- Specification - Equality (1)
- To satisfy your obligations under the RRA, BEFORE
you create the specification you will need
answers to these questions - Who will this impact?
- Obtain racial data for likely end users
- Is the product need likely to differ by racial
group? - Is the way that it is delivered likely to differ
by racial group? - Identify different groups needs
- Consult end users
- Define spec based on identified needs
- Can requirement or spec be split to add value and
make available to a greater number of SMEs?
42- Specification Equality (2)
- questions (continued)
- Cross check spec versus Citys Equality policy
- Are there any specific requirements / duties to
include (reporting etc) in the spec in relation
to equality? - This will be effected by the degree of relevance
of the resultant contract under the RRA - The relevance will be determined by a combination
of the product being purchased and how it will be
delivered - Ensure spec is flexible enough to deal with
changing equality requirements - Ensure that the spec does not contain or omit
requirements that would disadvantage any end user
group within the scope of your institution.
highly relevant purchases
43The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
44Vendor Selection
- The vendor selection process consists of the
following aspects - Obtaining Expressions of Interest
- Vendor Evaluation Questionnaires
- Evaluation Consultation with end-users.
45- Obtaining Expressions of Interest (EOI)
- Decide on level of detail (of requirements) to be
included on EOI - low level here and more info on RFQ/T or
- all included here.
- On some occasions where there is not absolute
clarity of what is required or available from the
marketplace it may be worth stating vendor
suggested variant offers may be considered. - Complete the relevant Notice of Tender
Requirement document - Define if resulting contract will be of high
relevance or suitable for general vendors and
include relevant instruction on notice
46- Obtaining Expressions of Interest (EOI)continued
- Advertise for expressions of interest in
- OJEU if EU (Purchasing Services do this for
you) - City University Website Open Tenders List (all
tenders). - And if applicable
- Trade Press
- Local Media
- Chamber of Commerce
- Regional Development Agencies Meet the Buyer
Exhibitions etc.
47- Vendor Evaluation Questionnaires
- If vendors wish to express an interest in bidding
for City University business they need to - Advise us of the fact
- Download a copy of our Vendor Questionnaire
(EHEP) from our website (unless they have done so
already - check with Purchasing Services) - Complete it and return it with additional
documents if required - Vendors that are to bid for high relevance
contracts need to complete all sections others
need not complete section 5C - OR /
- EHEP Equality in Higher Education Purchasing
48- If purchase is low relevance / low value and it
is not practical, reasonable or practical to
obtain completion of the EHEP Questionnaire - the CREs notice Register should be checked
but has limited scope - OR
- You should satisfy yourself by other means
(possibly verbal but ideally in writing
dependant on situation) that the vendor has not
broken any relevant law, particularly in relation
to our obligation to promote equality - If a vendor has breached any relevant
legislation, they should be asked to complete the
EHEP Questionnaire
49- Evaluation Consultation with End-Users
- When you have responses from vendors expressing
an interest in bidding you need to - Score their questionnaire / feedback based on the
defined EHEP scoring methodology - Evaluate all other sections / feedback to
ascertain suitability - Vendors that have been convicted of breaking any
law should not normally be used. - Consult Purchasing services if required.
- Note that if you choose to use a vendor with any
type of conviction (except motoring unless that
is relevant to the tender) or one with a low EHEP
score, - you should have proof of rectification of
processes and / or agree an Equality Development
Plan (EDP) as appropriate
50- Evaluation Consultation with End-Users
- (CONTINUED)
- Note for example that if you purchase from a
vendor that has been convicted of failing to pay
the minimum wage, you could potentially be
prosecuted under the Proceeds of Crime Act for
purchasing from them if it is found that they are
again prosecuted for that same crime - Send a copy of evaluated questionnaires to
Purchasing Services, - Who will create a vendor audit database to avoid
duplication of effort both by vendors and within
the University - When unsuitable bidders have been removed, it is
often of use to discuss potential vendors with
internal end users.
51The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
52Issue RFQ/T
- You will need to
- Follow the University EU tender rules
- Issue RFQ/T(s) to all vendors at same time
- Ensure full specification is now issued (if not
done at EOI stage) - Consider splitting into specific portions if
possible / value-adding so that it may be more
accessible to SMEs / ethnic minority companies
(but consider EU rules) - Ensure RFQ/T documents do not exclude any groups.
53Tenders and Quotations Competitive quotations and
tenders must be obtained as follows
54Tenders and Quotations
- If any of the above rules presents serious issues
or concerns on a specific tender or scenario - - Purchasing Services or your Purchasing
Co-ordinator should be consulted to identify an
alternative solution if it is permitted under
relevant legislation
55- Request for Quotation (RFQ) Document
- Should be generated based on the template on the
purchasing section of the universitys website.
It is key that it contains - Detailed (but not restrictive) Requirement
Specifications - Instructions for return of tender documents to
ensure that returned tenders will be received by
the correct person - A statement that states that the tender that
provides the best overall value for money for the
university in the view of the university, is
likely to be awarded the available business in
event of business being awarded.
56- Request for Quotation (RFQ) Document continued
- State if short-listing of most advantageous
bidders for further discussion may occur - (not EU).
- It is often wise to request vendor suggested
variant offers in RFQs (if you have included
this in EOI advert). - One or more Tenderers may request an extension to
the time-scale allowed for return of Tenders. If
there appears to be a good reason to allow this,
the extension should be offered to all Tenderers.
57Evaluate Quotes / Tenders
- There are two key areas to consider here
- The process for receipt of tenders
- The content of the tenders versus requirements.
58- Receipt of Quotations for Purchases under 25,000
Basic Principles (1) - The Quotations should be opened by the Authorised
Buyer and possibly a witness. - The quotations should at all times be held with
all other purchasing documents relating to that
purchase in a locked storage place (drawer,
cupboard etc.). - Prices should not be discussed or in any way made
available with any persons that do not have good
and ethical reasons for being involved. - Actual Prices or any other terms offered by one
vendor must never under any circumstances
whatsoever be made available to another vendor.
59- Receipt of Quotations for Purchases under 25,000
Basic Principles (2) - However, if a vendor is not the most competitive
after providing their offers, it is allowed to
advise them of this fact. - They are not however allowed to simply re-bid
lower in isolation. - If they wish to re-bid, and we are prepared to
accept revised bids, then all tenderers should be
advised that reduced bids are being made and they
are free to re-bid revised closing dates for
revised bids should be stated to all parties. - If you are short-listing in tenders, please
consult Purchasing Services before doing this as
this is a sensitive area. - Tenders received after the relevant closing date
or revised closing date, should not normally be
considered.
60- Receipt of Quotations for Purchases over 25,000
- Purchasing Services will advise or define a
process on each occasion.
61- The Content of the Tenders Versus Requirements
- You will need to ensure
- Are offers in line with RFQ/T?
- Are equality requirements dealt with effectively
on tenders? - Can full specification be met cost effectively?
- Involve end user community in evaluation if
possible relevant - This takes more time but greatly enhances the
value of the final contract - Identify best source(s) of supply.
62The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
63Negotiate
- In some circumstances (for example most EU
applicable tenders) it is illegal to negotiate
post tender, however where it may be permitted - Check with Purchasing Services for each scenario
- Narrow field to preferred bidders
- Can equality provisions be enhanced?
- Costs negotiated
- Further improved bids?
- Involve end user community if possible
relevant - Identify best source of supply.
64The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
65Place / Award Contract
- The areas to consider here are
- Vendor acceptability status
- Authority levels
- Placing orders
- Amending or cancelling orders.
66- Vendor acceptability status
- If the chosen vendor has broken any law and you
have chosen to still use them - Have you received proof of relevant corrective
actions? - If vendor has a low EHEP score
- Is equality action plan if required in place?
- Initiate action plan if required.
- If all is OK, place contract subject to TCs
including equality requirements. - If forced to order through vendor with
significant legal or equality issues due to lack
of alternatives, record in internal contract file
the information relating to the unsuccessful
action taken to identify alternatives.
67- Authorisation Levels
- Based on the current Financial Regulations,
Contracts-Orders may be authorised as follows
(after signing by Authorised Buyer) - Orders up to the value of 25,000
- Authorise Budget Manager / Authorised Signatory
for the cost centre(s) being charged. - Orders over 25,001
- Authorise Budget Manager / Authorised Signatory
for the cost centre(s) being charged AND also by
the Director of Procurement, a Purchasing
Services Manager or Director of Finance and
Business. - Framework contracts and contracts for mandated
sources need only be signed by a Purchasing
Services Manager, the Director of Procurement or
the Director of Finance and Business.
68- Placing Purchase Orders
- Purchases may normally only be made using the
City University standard official order based on
the Universitys General Conditions of Purchase. - There are four order types in use currently
- Manual sub 20K (being updated to 25K) Order
Form - Manual High Value (over 20K being updated to
25K) Order Form - Consultant Lecturers Order / Contract
- SAP Purchase Orders.
69- Placing Purchase Order (continued)
- If, due to urgency, a verbal order is necessary,
the order must still have received formal
authorisation and the official order number must
be quoted to the vendor - The order form should be completed and sent to
the vendor as confirmation by post at the
earliest opportunity. - All purchase orders must state clearly the
requirement and show the pricing arrangements in
force. - Prices MUST be inclusive of insured delivery to
our desired final destination.
70- Placing Purchase Orders (continued)
- A copy of every order placed must be sent to
Purchasing Services. - All purchase orders should be kept in locked and
secure storage areas. - Pads of official orders are kept in Purchasing
Services and will be available to Authorised
Buyers or Purchasing Co-ordinators only. - Purchasing Services will hold a register of the
pads issued. - Confirmation Orders
- For verbal orders
- Confirmation orders must be clearly marked
Confirmation of Verbal Order If possible, the
vendors reference should also be quoted.
71- Order Amendments (All Orders)
- Order amendments must never be issued without the
prior agreement of the vendor to the changes
deemed necessary. - Order amendments which increase the scope of
purchase (e.g. increase in quantity and/or price)
or substantially alter the nature of the
agreement (e.g. change of validity of agreement)
must be authorised as if they were new orders
based on total value - Order Amendments for Manual Orders
- Should be transmitted by fax or letter (which
contains the signatories of the authorised
signatories), referencing the original purchase
order number, clearly stating THIS IS AMENDMENT
TO ORDER NUMBER. - Details of the original order which no longer
apply and what the new details of the agreement
are should both be stated.
72- Order Amendments for SAP Orders
- Order amendment for SAP orders should be output
from SAP - it must be noted very clearly in the
header text that this is an order amendment. - The items that have changed must be noted also on
the order. - The header texts and the note of items changed
must be printed out on the copies sent to he
vendors (sometimes SAP will state the changes, in
others it will not, depending on the type of
changes made and print version).
73- Order Termination (All Orders)
- If an order is no longer required and the vendor
agrees to the cancellation of the order, a fax
should be sent to the vendor, referencing the
order number and the agreement to cancel, stating
clearly the order is now cancelled. - In the case of need of termination of a purchase
order/contract through breach of conditions,
Purchasing Services must be advised and their
approval sought before this is done.
74- Order Termination For SAP Orders (additionally)
- If no delivery has taken place against the order,
the order lines should be marked as deleted. - If some goods have been delivered, the delivery
complete indicator must be selected for the
relevant line items. - It must be noted very clearly in the header text
within SAP that the order is cancelled, when and
why.
75The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
76Delivery
- The areas to consider here are
- Is the vendor supplying in line with order
requirements? - Is the method of delivery successfully complying
with equality requirements of the specification
the RRA generally? - Are persons involved in delivery aware of
required equality based behaviours and performing
to acceptable standards?
77The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
78Vendor Paid
- Has vendor complied with all requirements
including equality? - If not, are there liquidated damages clauses
applicable ? - Invoice should be authorised in line with
Financial Regulations
79The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Purchasing Strategy
Review Report
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
80Monitor Performance / Review Requirements
- Is the delivery of goods or service delivery
successfully complying with all requirements of
the order/contract including equality? - If not,
- Make vendor aware of issues in writing and follow
up. - Is an Equality Action Plan required ?
81Monitor Performance / Review Requirements
- If of high relevance under the RRA
- Are equality monitoring processes being complied
with? - Is vendors action plan (if applicable) being
followed through? - Is provision still matching need and providing
equality of access to purchased goods / services?
82The Purchasing Cycle
Requirement to Purchase
Produce Spec
Monitor Performance / Review Requirement
Vendor Selection
Vendor Paid
Issue RFQ/T
Delivery
Evaluate Quotes / Tenders
Place / Award Contract
Negotiate
83- And Finally,
- Dont forget you are not on your own.
- Purchasing Services are here to help
- If you come to an issue that you are not
confident in dealing with, call us. - Purchasing Helpdesk 8003.
84Equality Process Flow Chart
Requirement to Purchase
Obtain Racial Data for Target Area
Is the product need likely to differ by racial
group ?
Is the way it is required to be Delivered likely
to differ by racial group ?
Complete Full Spec ensuring built-in flexibility
to deal with potential changing equality
requirements
Can spec be split to enhance value / promote
equality in tendering ?
NO
NO
YES
YES
Advertise for exp of interest in (ensuring
advert/spec does not exclude any racial
group) OJEU if-req, press / open tender list
websites etc
Does preferred bidder need Equality Dev Plan
(EDP) based on questionnaire score?
YES
Consult end Users Define Product Spec
Consult end Users define product /
service DELIVERY Spec (when, by whom, using which
medium)
Cross check to ensure compliance with
Organisations Equality Strategy
NO
Do they agree to EDP ?
Is requirement for service to be delivered on
site and / or highly relevant goods ?
Issue vendor questionnaire with EHEP sections 1-3
to be completed
Receive Tenders / Quotes. Narrow field to best
bids. Negotiate (if applicable)
Consider technical/ equality / financial
capabilities - involve end users. Decide on
preferred bidder.
YES
YES
NO
NO
Award contract to preferred bidder subject to
relevant TCs including Equality requirements
Issue vendor questionnaire with EHEP sections 1
2 to be completed
Evaluate questionnaire
Issue RFQ/T to vendors that meet minimum
standards. Ensure RFQ/T does not exclude any
racial group
Is there an acceptable alternative bidder who
does not need an EDP or who agrees to one if
required ?
YES
Award contract to next most preferred bidder
subject to relevant TCs including Equality
requirements
NO
Check delivery of product and actual product
complies with specification including equality
Review ongoing requirements
Update spec, vary Contract if applicable
Must /or Can a bidder be used (not on-site
service) or will re-tendering (on site service)
be required ?
YES
Award short term contract to best available
bidder subject to relevant TCs including
Equality requirements
NO
85Course Round Up
86- Objectives
- Were the objectives met?
- Provide a basic level training in the key aspects
of purchasing. - Make you aware of the key impacts of relevant
legislation. - Describe the processes in place to lower the
University and its employees exposure to risk. - Clarify Roles and Responsibilities of those
involved in the purchasing process. - Help attendees identify areas in their skill sets
that may need further development / coaching in
relation to purchasing.
87Any Questions..?
88Post Training Validation
- 10 Key Questions
- Please complete the answer sheet now and hand it
to me before you leave. - These questions address the most essential areas
that must be understood before individuals can
purchase for the University. - If there a few areas of concern, advice /
coaching will be provided if there are
significant areas then re-attendance of the
course will be required.
89Thank You for attending!
90Likely Highly Relevant Purchases (1)
- Services On Site (all highest relevance) may also
be off-site but will still be of high relevance - Consultant lecturers
- Assessors
- Maintenance
- Construction / Works
- Agency temp staff
- Consultancies / Consultants
- Nurseries / Child care facilities
- Printing Design services
- Catering
- Cleaning
- Security
- Waste disposal
- External auditors
- Services to students (accommodation, computer
services, libraries) - Trading units on site
Press for Next Page of Highly
Relevant Purchases
Press to Go Back to Equality Page
91Likely Highly Relevant Purchases (2)
- Services Off Site (highest relevance)
- Recruitment agencies
- Uniform Providers
- Advertising / Marketing agencies
- Services Off Site (high relevance)
- Publishers
- Legal advice
- Banking
- Insurance
- External research
- And any other purchase situation where the vendor
directly interacts with your staff or students or
with members of the public in the vicinity of
your facilities.
Press for Previous Page of Highly Relevant
Purchases