T4 positional cross matcher. T5 access to theoretical data. T6 robotic telescope interface ... The group concluded to initially focus on T4 'cross matcher. ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 24
Provided by: peter1060
Category:

less

Transcript and Presenter's Notes

Title: Welcome to: DS4 User Tools WP Manager Markus Dolensky, ESO DS ''' Design Study


1
Welcome toDS4 User ToolsWP ManagerMarkus
Dolensky, ESODS ... Design Study
2
Agenda
  • Morning Session 1030 - 1230 Short Range
    Planning
  • Overview (Dolensky)
  • CDS Proposal (Boch)
  • Planning Iteration 1
  • Afternoon Session 1330 - 1530 Iterations 2 - 6
  • Science Drivers (Walton)
  • Tools (Dolensky)
  • General Discussion
  • Wrap Up/Summary

3
EURO-VO Telescope Assembly
DS4 User Tools
DS6 Data Mining
DS5 Resource Discovery
DS3 Infrastructure
4
Short Range Planning Iteration 1
Workshop on VO Standards and Systems for Data
Centres and Large Projects
27 June 1 July 2005 ESO Headquarters, Munich,
Germany http//euro-vo.org/workshop2005 Registra
tion Deadline March 1st
Sponsored by ESO, OPTICON, RADIONET and EURO-VO
partners
5
Tool Layer I
6
Tool Layer II
7
Scope
This task will produce designs and prototypes for
new VO-compliant end-user tools. We will produce
a list of suggested priority tools. This will
partially be based on the experience and feedback
of precursor projects and will be based on input
from the scientific user community. Work will be
conducted in close collaboration with data
providers, e.g., members of the Data Centre
Alliance, current and future missions,
simulations as well as tool builders. A goal is
to help existing facilities with technology
take-up and to have a lasting impact on Astronomy
data centres and their user community by
exploring new designs and deriving generalized
IVOA standards.
8
Team Communication
  • mailing list ltds4_at_eurovotech.orggt
  • requires registration
  • http//forum.eurovotech.org/profile.php?mode
    register
  • collaborative page
  • http//wiki.eurovotech.org/bin/view/VOTech/U
    serTools
  • dial-in telecons Markus can arrange (Skype?)
  • cheap videocons?
  • contact for follow-up (from within DS group)
  • ESO Markus Dolensky
  • Astrogrid Keith Noddle
  • CDS Thomas Boch
  • INAF Riccardo Smareglia
  • ESA Pedro Osuna
  • Starlink Malcolm Currie

9
page intentionally left blank
10
Enabling Convincing Workshop Tutorial
  • H/W S/W setup
  • public demo server (ESO, others?)
  • Astrogrid portal, MySpace, experimental
    registry, ...
  • improving usability of AG portal for end users
    and DCs
  • security review
  • ivo// address exchange layer (MySpace, etc.)
  • multiple filestore support
  • MIME-type association
  • use cases for browsing survey archival data
  • preparing test sets of survey data for sample
    services
  • support of graphic previews (.jpg, .png)
  • footprint overplotting capability

11
page intentionally left blank
12
A Preliminary Analysis of Input to AVO SRMby M.
DolenskyFeedback requested from DS4
partners.SRM ... Science Reference Mission
13
Tools
Science Applications T1 multi-waveband image
tool T2 best fitting T3 SED builder from archival
data T4 positional cross matcher T5 access to
theoretical data T6 robotic telescope
interface T7 generic source extraction Other
Tools T8 VO Portal (GUI) T9 workflow builder
monitor
14
Tools vs. Scenarios I
This is a preliminary analysis feedback
requested from DS4 partners.
15
Tools vs. Scenarios II
  • A question mark ? denotes a gap between
    scenarios and envisaged tools.
  • Implementations may already exist.
  • This is a preliminary analysis feedback
    requested from DS4 partners.

16
Tools vs. Scenarios III
  • A question mark ? denotes a gap between
    scenarios and envisaged tools.
  • Implementations may already exist.
  • This is a preliminary analysis feedback
    requested from DS4 partners.

17
Food for DiscussionDerived FocusIterations 2-6
  • Note taken during the presentation
  • The group concluded to initially focus on T4
    cross matcher.
  • Work on an iteraions focus area does not
    prevent work in any other area.
  • Above list is a possibility feedback
    requested from DS4 partners.

18
page intentionally left blank
19
Slides from Kickoff Meeting Revisited
20
Human Resources
VOTech staff has not been hired yet by any of the
partners.
21
DS4 Context
22
Timeline (subject to change)
2/05
7/05
3/06
7/06
12/05
9/06
12/07
2/05
7/05
3/06
7/06
12/05
9/06
12/07
23
DS4 Collaborative Page
http//wiki.eurovotech.org/bin/view/VOTech/UserToo
ls
Write a Comment
User Comments (0)
About PowerShow.com