Findings of the ADSB Technical Link Assessment Team TLAT CoChairs April 2001 - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Findings of the ADSB Technical Link Assessment Team TLAT CoChairs April 2001

Description:

Findings of the ADS-B Technical Link Assessment Team. TLAT Co-Chairs. April 2001 ... Further Findings - 3. Integration/Coexistence with Existing Systems ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 20
Provided by: faa6
Category:

less

Transcript and Presenter's Notes

Title: Findings of the ADSB Technical Link Assessment Team TLAT CoChairs April 2001


1
Findings of the ADS-B Technical Link Assessment
TeamTLAT Co-Chairs April 2001
AMCP WGC2/WP18
  • Constantine Tamvaclis
  • Eurocontrol Experimental Centre
  • ATM/CNS System Engineering
  • ADS Studies and Trials Project Manager
  • 33-1-6988-7419
  • constantine.tamvaclis_at_eurocontrol.fr
  • Ann Tedford
  • Federal Aviation Administration
  • Architecture and System Engineering
  • Deputy Program Director
  • 1-202-358-5300
  • ann.tedford_at_faa.gov

2
Evaluation Criteria - 1
  • Applications from the Joint Government/Industry
    Plan for Free Flight Operational Enhancements
  • 7 ADS-B air-to-air applications
  • Traffic Information Services-Broadcast (TIS-B)
  • Flight Information Services-Broadcast (FIS-B)
  • plus the simultaneous approach application
  • Technical Requirements
  • RTCA ADS-B MASPS (DO-242)

3
Evaluation Criteria - 2
  • Additional applications from Eurocontrol
  • overlay of monopulse Secondary Surveillance Radar
    (SSR) with ADS-B
  • overlay of Mode S Enhanced Surveillance with
    ADS-B
  • Additional technical requirements or assessments
  • extension of long-range deconfliction from
    Eurocontrol
  • multiple ADS-B link considerations
  • any link dependent criteria resulting from ADS-B
    Operational Safety Assessment
  • expandability and excess capacity

4
Traffic Scenarios
  • Los Angeles Basin in 2020
  • Core Europe in 2015
  • Low Density

5
Membership
  • Co-chairs
  • Constantine Tamvaclis, EEC
  • Ann Tedford, FAA
  • Facilitator
  • George Ligler, PMEI
  • Team Members
  • Larry Bachman, JHU/APL
  • Nikos Fistas, Eurocontrol
  • John Gonda, DoD/USAF
  • Stan Jones, MITRE
  • Vince Nyugen, FAA/AND-500
  • Tom Pagano, FAA/ACT-300
  • Rich Weathers, DoD/JCS
  • Don Willis, FAA/ASR-100
  • Ray Yuan, JHU/APL
  • Subject Matter Experts
  • 1090 MHz Extended Squitter
  • Jonathan Bernays, LL
  • Bill Harman, LL
  • UAT
  • Chris Moody, MITRE
  • VDL Mode 4
  • Christian Axelsson, Swedish CAA
  • Johnny Nilsson, Swedish CAA
  • Armin Schlereth, DFS

6
Report Contents
  • Introduction
  • Overview of ADS-B/ Situational Awareness Link
    Candidates
  • TLAT Evaluation Criteria for ADS-B/Situational
    Awareness Links and Traffic Scenarios
  • Technical Assessment Approach
  • Technical Assessment
  • References
  • Key Appendices
  • System Descriptions
  • Link Evaluation Criteria
  • Traffic Scenarios
  • Data Link Receiver Performance Models
  • Summary of Link Modeling and Simulation
  • Trials and Simulation Results
  • Multi-Link Considerations
  • Further Analyses
  • Areas for Potential Further Study

7
Modeling Diagram
Traffic Scenarios
Compare to Evaluation Criteria
Simulation Models
Characterize Link Performance
Aggregation of Paired Link Performance
Operational Environment
Validate with Laboratory and Flight Test Data
Receiver/Waveform Model
This slide not part of original co-chair
presentation.
8
Average MSR vs Range for Core Europe
This slide not part of original co-chair
presentation.
9
Core Europe Update Time Results
Update Time for State Vector Update (95)
Update Time for TCP Updates (95)
TCP2, TCP3
TCP, TCP1
This slide not part of original co-chair
presentation.
10
LA Basin Update Time Results
Update Time for State Vector Update (95)
Update Time for TCP, TCP1 Update (95)
This slide not part of original co-chair
presentation.
11
Application Performance Results - 1Low Density
Scenario

12
Application Performance Results - 2Low Density
Scenario - continued

13
Application Performance Results - 3Core Europe
2015
14
Application Performance Results - 4Core Europe
2015 - continued
15
Application Performance Results - 5Los Angeles
Basin 2020
16
Application Performance Results - 6Los Angeles
Basin 2020 - continued
17
Further Findings - 1
  • TIS-B
  • FIS-B
  • Time until Implementation
  • Standards
  • Availability of Spectrum
  • Risk and Complexity

18
Further Findings - 2
  • Time until Implementation - continued
  • Standards
  • Availability of Spectrum
  • Risk and Complexity

19
Further Findings - 3
  • Integration/Coexistence with Existing Systems
  • Operational Safety Assessment
  • Expandability
  • Multi-link
Write a Comment
User Comments (0)
About PowerShow.com