Title: Conceptual Design Review
1Conceptual Design Review
- Design Requirements
- The Systems Perspective
- Rob Hubbard
- Systems Engineering
2The Flow-Down Process
ATST Science Requirements
Design Requirements
3The Flow-Down Process
ATST Science Requirements
Functional and Performance Requirements
Strawman Concepts
Design Requirements
4Getting to a Concept Input
Obvious Constraints
Work Shops
Experience with Similar Telescopes
Funded Studies
Strawman Concepts
Trade Studies
Engineering Analysis
Baseline Telescope Concept
5Getting to a Concept Ideas
6Testing the Concept
Performance Evaluation
No
Error Budgets
Design and Development of Systems and Subsystems
OK? (CoDR)
Science Requirements
Strawman Concept
Sub-System Specs, Design Requirements
Cost Evaluation
Yes
PDR Phase
- Conceptual Design Review
- What passes this test?
- What work remains?
7Some Hard Constraints from the SRD
- Resolution, photon flux and sensitivity require a
four-meter class telescope. - Resolution requirement also leads to a high-order
adaptive optics system. - Wavelength coverage from 0.3 to 28 ?m leads to an
all-reflecting telescope.
8Some Challenging Requirements
- Resolution Requirement (Image Quality)
- Even with a 4-meter aperture, a world-class site,
high-order AO system, this remains challenging. - Stray Light Requirement (Coronal Observations)
- Polarization Requirement (Polarimetry)
9Design Requirements Documents
- M1 Mirror Assembly
- SPEC-0007 (Ron Price)
- M2 Mirror Assembly
- SPEC-0008 (Ron Price)
- Enclosure
- SPEC-0010 (Mark Warner)
- Telescope Mount Assembly
- SPEC-0011 (Mark Warner)
10The Systems Approach
- The diverse and sometimes competing requirements
placed on ATST forces a rigorous and aggressive
systems approach during all phases of the project.
11ATST Systems
ATST Systems Orientation
12Responsibilities of Systems Engineering
- Design Requirements Flow Down
- Document and Drawing Control
- Interface Control
- Error Budgets
- Standards
- End-to-End Modeling
- Quality Assurance Plan
- Acceptance Test Plans
- Integration Plan
13Responsibilities of Systems Engineering CoDR
Emphasis
- Design Requirements Flow Down
- Document and Drawing Control
- Interface Control
- Error Budgets
- Standards
- End-to-End Modeling
- Quality Assurance Plan
- Acceptance Test Plans
- Integration Plan
14Systems Overview
- Telescope Systems and Subsystems Definition
- Interface Control and the N2 Diagram
- Documentation Control
- Error Budgets Top Down
- Error Budgets Bottom Up
15Glossary and Acronym List
16Document and Drawing Control
17Interface Control and the N2 Diagram
18N2 Diagram Detail
19Top Level Systems
- 1.0 Telescope Assembly
- 2.0 Adaptive Optics
- 3.0 Instrument Systems
- 4.0 High-Level Controls and Software
- 5.0 Enclosure
- 6.0 Support Facility and Buildings
20Telescope Assembly Subsystems
- 1.1 Telescope Mount Assembly
- 1.2 M1 Assembly
- 1.3 M2 Assembly
- 1.4 Feed Optics
- 1.5 Thermal Systems
- 1.6 Scattered Light Control