Title: BouwData PB Coding


1
BouwData PBCoding
2
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

3
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

4
Choke point 1
  • Each building partner has a different need of
    knowledge
  • Investor the price is devided in the underground
    and the aboveground building cost
  • Designer price of for example a window, all
    accompanying activities inclusive
  • Building supervisor price of for example a m²
    formwork
  • ? Each building partner has a preference for a
    different top-down structure
  • ? Price list in a tree diagram is not sufficient

5
Choke point 2
  • Not a univocal work system.
  • In each project with new building partners
  • A different classification of building
    specifications
  • Different measure codes
  • Different states of progress
  • ? Waste of time communication issues
  • ? An advancement of knowledge for the entire
    project is impossible

6
Choke point 3
  • No transparency with regard to the building cost.
    Following costs are judiciously spread among
    the production costs
  • The cost of the layout of the construction site
  • The cost of the preliminary works
  • The cost of the project follow-up
  • ? The knowledge of these costs are confined to
    the building supervisor
  • ? No concrete price comparison are possible

7
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

8
Available norms
  • Program
  • Design
  • Execution
  • Realization
  • Usage
  • NBN B06-002 surface content of buildings
  • NBN B06-003 investment costs
  • NBN B06-001 standard measure method
  • NBN B06-004 exploitation costs
  • NBN B06-005 data management usage

NEN 2630 NEN 2631 NEN 3699 NEN
2632 NEN 2633
B U I L D I N G P R O C E S S
NEN 2634 terms, definitions and rules with
reference to costs and quality aspects for
building projects
Building Declaration NEN 2630 ? NEN 2580
STABU system of building specifications for
residential and commercial building
9
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

10
Frame of notions TU Delft
  • ? As a result of the Building Declaration
  • Complex a compilation of several buildings that
    belong together
  • Building a complete compilation of
    functional/fysical objects that are necessary to
    meet a demand of accomodation
  • Cluster of elements a group of elements with
    certain characteristics that are interconnected
  • F.ex. Foundations
  • Element a functional object with a specific
    function, defined without mentioning the kind of
    the technical solution or the construction method
  • F.ex. Floors on groundwork weight 3 tons/m²,
    planeness class 5mm/2m
  • Building fraction a fysical object with a
    specific performance, defined precisely by
    mentioning the kind of the technical solution and
    the construction method
  • F.ex. Floors on groundwork - 20cm concrete
    C25/30 with 25kg/m³ steel fibres on a PE-foil
    0,2mm and on a substratum of 5cm soil and 30cm
    rubble

11
Frame of notions TU Delft (2)
  • Component a fysical object with a specific
    performance that is part of a building fraction,
    composed of building delivery products, with the
    use of labour and materials
  • F.ex. Ground stabilization of the building
    excavation
  • Activity the process of the handling of
    building products with the use of labour and
    materials for the realization of components
  • F.ex. Formwork
  • Means generic data carrier for labour,
    materials and equipment
  • F.ex. Delivery PE-foil 0,2mm
  • GBEC (General building execution cost) costs of
    labour and equipment, that are necessary for the
    realization of a building, insofar the costs are
    not linked to means that remain on the building
    site once the building is completed

12
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

13
Theory
  • Complex
  • Building
  • Cluster of elements
  • Element
  • Building fraction
  • Component
  • Activity
  • Means (labour, materials, equipment)
  • GBEC (General building execution cost)

? PoD, Chart 6, NEN 2634 ? PoD, Chart 7, NEN
2634 ? PoD, Chart 8, NEN 2634
functional description
Program / design
Cost index numbers of previous projects
Execution / realization
Prices with regard to this project
technical description
  • STABU system of building specifications and
    conditions
  • Separately defined as of chart 6, NEN 2634

14
Practice
  • Complex
  • Building
  • Cluster of elements
  • Element/building fraction
  • Component composing parts of the building
    fraction/element
  • Activity
  • Means (labour, materials, equipment)
  • ? PoD, Chart 6, NEN 2634
  • ? PoD, Chart 7, NEN 2634
  • PoD, Chart 8, NEN 2634
  • PoD, Chart 1 of BB-SfB registered in chart 8,
    NEN 2634

Data of BIM
Program / design
Cost index numbers of previous projects
Execution / realization
Prices with regard to this project
  • means and formulas based on STABU system of
    building specifications and conditions

to be entered in a calculation program
15
  • Choke points
  • Available norms
  • Lexicon as a reference frame
  • Theory vs. practice
  • Coding BouwData PB

16
Development BouwData PB
  • On C3A-net with the support of IWT (nr.080429)
  • Concept basisc lists are free of charge
  • Monitored by 350 building professionals

17
System of agreements BouwData PB
  • Administration groupware
  • Phasing of the building process
  • Structure of the performance building
    specifications and conditions specific for a
    project
  • Structure of the technical building
    specifications and conditions specific for a
    project
  • Variety of costs
  • Quantities and units
  • User functions and space designations
  • Cost centres and accompanying ratios

18
Performance specifications vs. technical
specifications
  • Use of BIMSplitting up object and material
  • Object focused on design ? NEN 2634, chart 1
    of BB-SfB
  • Material focused on execution ? STABU
    (instead of chart 2 3 of BB-SfB)
  • Conversion instead of folding out the same tree
    diagram! ? cost centres respect property
    developer

19
Performance specifications vs. technical
specifications (2)
20
Quantities and units
  • SI-units
  • Extension with agreements in the benefit of cost
    related units F.ex. m² - d a cost / m² /
    day can be used in f.ex. taxes on the
    installation of the construction site on
    public property
  • F.ex. t - km a cost / ton / kilometre can be
    used in f.ex. transport of soil

21
Variety of costs
  • Cost index numbers for several building phases
  • Means (MLES)
  • General costs (GC)
  • General building execution costs (GBEC)
  • Profit
  • Risk
  • Approximate estimates
  • (MLES) Materials, Labour, Equipment and
    Subcontracting

22
User functions and space designations
  • In accordance with the Dutch Building Declaration
    (instead of chart 0 of the BB-SfB)
  • User functionsF.ex. Housing function, sport
    function, cell function,
  • Defined spacesF.ex. lavatory, heating system
    room, traffic space,
  • Definition usable surface

23
User functions and space designations (2)
24
Cost centres and accompanying ratios
  • Coding based on
  • NBN B06-002
  • Chart 1 BB-SfB
  • Building Declaration
  • Addition (English abbreviation)
  • Geometry of the building
  • Finishing of spaces for the purpose of user
    functions

25
Cost centres and accompanying ratios (2)
26
Cost centres and accompanying ratios (3)
27
More information about BouwData PB ?
www.bouwdata.net