Title: CIPULARANG II TOLL ROAD PROJECT
1CIPULARANG IITOLL ROAD PROJECT
- C. Willy Hartono
- Sales Manager
- West Java
- Admixture System
2- Section I Purwakarta
- Section II South Purwakarta Plered
- Section III. 1 Plered Cikalong Wetan
- Section III. 2 Darangdan Cikalong Wetan
- Section III. 3 Cisomang Bridge
- Section IV. 1 Cikalong Wetan Cikubang
- Section IV. 2 Cikubang Bridge
- Section IV. 3 Cikalong Wetan Cikamuning
- Section IV. 4 Cipada Cikamuning
- Summarize
31. General Overview
- Total Length is 40 km
- Divided by 9 Sections
- Starting in March 2004 done before April 25,
2005 (The 50th Anniversary of Asia Africa
Conference in Bandung, West Java) - Starting with earthworks in March 2004
continuing with concrete works in July 2004 - Girder produce insitu by precaster (Adhi
Precast, Wika Beton, Saeti)
42. Section I Purwakarta
- Main Contractor is Mawatindo
- Supervision Consultant is Virama Karya
- Total Length is 9 km
- Concrete supplied by Farika Duta Agung (2 BP).
- Concrete Volume 100,000 m3
- We supplied 100 (Pozzolith 101 Ri Rheobuild
1100) to Farika Duta Agung - Wet Mix for Rigid Pavement
52. Section I Purwakarta
63. Section II South Purwakarta - Plered
- Main Contractor is Adhi Karya Division III
- Supervision Consultants are Cipta Strada, Saka
Adhi Prada Amythas Expert - Total Length is 8 km
- Concrete supplied by Adhimix
- Concrete Volume 80,000 m3 for Rigid Pavement only
- We supplied 100 (Pozzolith 100 Ri Rheobuild
1100) - Wet Mix low slump for Rigid Pavement concrete
barrier - Girder Supplied by Adhi Precast
73. Section II South Purwakarta - Plered
84. Section III. 1 Plered Cikalong Wetan
- Main Contractor is Waskita Yasa J.O.
- Supervision Consultants are Delta Tama Waja,
Buana Archicon Prosys - Total Length is 6.3 km include 500 m long bridge
- Concrete supplied by Yasa Readymix Multi
Structure - Total Concrete Volume is 40,000 m3
- Admixture supplied by Fosroc (SP 337 RP 264 M)
to Yasa Readymix Grace to Multi Structure - Girder produced in situ with total 153 pieces
using Yasa Readymix
94. Section III. 1 Plered Cikalong Wetan
105. Section III. 2 Darangdan - Cikalong Wetan
- Main Contractor is Nindya Karya
- Supervision Consultants are Multi Phi Beta, Tata
Guna Patria Indra Karya - Total Length is 4 km
- Concrete supplied by Dwi Dinamika
- Concrete Volume 40,000 m3
- Admixture supplied by Fosroc (SP 337 RP 264 M)
- Girder Supplied by Wika Beton (Glenium 317 from
BASF M 21N from KAO)
115. Section III. 2 Darangdan - Cikalong Wetan
126. Section III. 3 Cisomang Bridge
- Main Contractor is L M System
- Supervision Consultant is Global Profex Synergy
- Concrete supplied by Pionir Beton
- Concrete Volume 25,000 m3
- Admixture supplied by Sika (Plastiment RMC)
- Girder produced insitu (Sikament NN) supplied
by Saeti Concretindo Wahana (Rheobuild 893)
136. Section III. 3 Cisomang Bridge
147. Section IV. 1 Cikalong Wetan - Cikubang
- Main Contractor is Daya Mulya Turangga
- Supervision Consultants are Bina Karya,
Eskapindo Matra Hasfarm Dian Consultant - Total Length is 5 km
- Concrete supplied by Focon Indo Beton
- Total Concrete Volume is 30,000 m3
- Admixture supplied by BASF (Pozz. 101 Ri
Rheobuild 1100) Sika (Plastiment R Sikament
NN ) - Girder supplied by Wika Beton ( Glenium 317 from
BASF M 21 N from KAO)
157. Section IV. 1 Cikalong Wetan - Cikubang
168. Section IV. 2 Cikubang Bridge
- Main Contractor is Propelat Wika J.O.
- Supervision Consultant is Yodya Karya
- Total Length is 4 km including 400 m long bridge
- Concrete supplied by Focon Indo Beton
- Total Concrete Volume is 30,000 m3
- Admixture supplied by BASF (Pozz. 101 Ri
Rheobuild 1100) Sika (Plastiment R Sikament
NN) - Girder supplied by Wika Beton ( Glenium 317 from
BASF M21N from KAO)
178. Section IV. 2 Cikubang Bridge
189. Section IV. 3 Cikalong Wetan -
Cikamuning
- Main Contractor is Hutama Karya
- Supervision Consultant is Indec Ass Ltd.
- Bridge with 750 m long (The longest bridge in
Cipularang II project) - Concrete supplied by Farika Duta Agung
- Total Concrete Volume is 50,000 m3
- We supplied 100 (Pozzolith 101 Ri Rheobuild
1100) - Girder produced in situ with total 183 pieces
199. Section IV. 3 Cikalong Wetan
Cikamuning
2010. Section IV. 4 Cipada - Cikamuning
- Main Contractor is Sumber Mitra Jaya Ircon Int.
J.O. - Supervision Consultants are Indah Karya, Widya
Graha Angsana Tribina - Total Length is 4 km
- Concrete supplied by Beton Indotama Surya
- Total Concrete Volume is 30,000 m3
- Admixture supplied by Sika (Plastiment R
Sikament NN - Girder supplied by Wika Beton ( Glenium 317 from
BASF M 21 N from KAO)
2110. Section IV. 4 Cipada - Cikamuning
2211. Summarize
- We got about 50 share of the project
- We supply to Adhimix Citapen (1 BP), Focon Indo
Beton (1 BP) Farika Duta Agung (2 BP in
Purwakarta 1 BP in Padalarang) - Sales value more than 500 million in 6 months
(July to December 2004) - Farika Duta Agung Padalarang gave the biggest
contribution for our sales value